Award

M8 Footbridge (Sighthill)

GLASGOW CITY COUNCIL

This public procurement record has 2 releases in its history.

Award

09 Feb 2018 at 00:00

Tender

04 Aug 2017 at 00:00

Summary of the contracting process

Glasgow City Council is undertaking a public procurement process for the construction of the M8 Footbridge (Sighthill), which is part of a regeneration initiative aiming to enhance connectivity from Sighthill to Baird Street and the City Centre. The tender, classified as works under a selective procurement method using the restricted procedure, is currently in the planning stage. The submission deadline for potential bidders is set for 6th September 2017, and the project is located in Glasgow, UK. Despite the project's significance, it has been marked as cancelled.

This tender presents valuable opportunities for construction firms, particularly those with experience in public works and infrastructure projects. Businesses specialising in civil engineering, landscaping, and high-mast lighting installations would be particularly well-suited to compete for this contract. Engaging with this procurement may also allow businesses to forge connections within the local authority sector and contribute to urban regeneration efforts in Glasgow.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

M8 Footbridge (Sighthill)

Notice Description

As part of the regeneration of the Sighthill Area of the City it is proposed to construct a new footbridge over the M8 motorway to provide a connection from Sighthill to Baird Street and on to the City Centre. The works are summarised as follows:- - Demolition of existing M8 footbridge - Demolition/Removal of existing high mast motorway lighting column/base and construction of two new high mast lights and bases. - Construction of new footbridge over M8 - Construction of bridge approach ramps, retaining walls, provision of drainage and public realm to south of bridge - Landscaping works, construction of retaining walls, provision of drainage for footbridge and approach including SUDS to north of bridge. - Associated Works & Consents

Lot Information

Lot 1

As part of the regeneration of the Sighthill Area of the City it is proposed to construct a new footbridge over the M8 motorway to provide a connection from Sighthill to Baird Street and on to the City Centre. The works are summarised as follows:- - Demolition of existing M8 footbridge - Demolition/Removal of existing high mast motorway lighting column/base and construction of two new high mast lights and bases. - Construction of new footbridge over M8 - Construction of bridge approach ramps, retaining walls, provision of drainage and public realm to south of bridge - Landscaping works, construction of retaining walls, provision of drainage for footbridge and approach including SUDS to north of bridge. - Associated Works & Consents Further detail on the scope of works is included in the Invitation to Participate document which is available in the buyers attachments area on PCS-T.. Economic operators may be excluded from this competition if they are in any of the situations referred to in regulation 58 of the Public Contracts (Scotland) Regulations 2015.

Publication & Lifecycle

Open Contracting ID
ocds-r6ebe6-0000497025
Publication Source
Public Contracts Scotland
Latest Notice
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=FEB309701
Current Stage
Award
All Stages
Tender, Award

Procurement Classification

Notice Type
OJEU - F3 - Contract Award Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Selective
Procurement Method Details
Restricted procedure
Tender Suitability
Not specified
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

44 - Construction structures and materials; auxiliary products to construction (except electric apparatus)

45 - Construction work


CPV Codes

44212120 - Structures of bridges

45221100 - Construction work for bridges

45221110 - Bridge construction work

45221113 - Footbridge construction work

45221115 - Construction work for steel bridges

Notice Value(s)

Tender Value
£16,500,000 £10M-£100M
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
9 Feb 20188 years ago
Submission Deadline
6 Sep 2017Expired
Future Notice Date
Not specified
Award Date
9 Feb 20188 years ago
Contract Period
Not specified - Not specified
Recurrence
Not specified

Notice Status

Tender Status
Cancelled
Lots Status
Cancelled
Awards Status
Unsuccessful
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
GLASGOW CITY COUNCIL
Contact Name
Not specified
Contact Email
caroline.dougan@glasgow.gov.uk, jay.mansfield@glasgow.gov.uk
Contact Phone
+44 1412872000, +44 1412876845

Buyer Location

Locality
GLASGOW
Postcode
G2 1DU
Post Town
Glasgow
Country
Scotland

Major Region (ITL 1)
TLM Scotland
Basic Region (ITL 2)
TLM3 West Central Scotland
Small Region (ITL 3)
TLM32 Glasgow City
Delivery Location
TLM82 Glasgow City

Local Authority
Glasgow City
Electoral Ward
Anderston/City/Yorkhill
Westminster Constituency
Glasgow North East

Further Information

Notice Documents

  • https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG291716
    M8 Footbridge (Sighthill) - As part of the regeneration of the Sighthill Area of the City it is proposed to construct a new footbridge over the M8 motorway to provide a connection from Sighthill to Baird Street and on to the City Centre. The works are summarised as follows:- - Demolition of existing M8 footbridge - Demolition/Removal of existing high mast motorway lighting column/base and construction of two new high mast lights and bases. - Construction of new footbridge over M8 - Construction of bridge approach ramps, retaining walls, provision of drainage and public realm to south of bridge - Landscaping works, construction of retaining walls, provision of drainage for footbridge and approach including SUDS to north of bridge. - Associated Works & Consents
  • https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=FEB309701
    M8 Footbridge (Sighthill) - As part of the regeneration of the Sighthill Area of the City it is proposed to construct a new footbridge over the M8 motorway to provide a connection from Sighthill to Baird Street and on to the City Centre. The works are summarised as follows:- - Demolition of existing M8 footbridge - Demolition/Removal of existing high mast motorway lighting column/base and construction of two new high mast lights and bases. - Construction of new footbridge over M8 - Construction of bridge approach ramps, retaining walls, provision of drainage and public realm to south of bridge - Landscaping works, construction of retaining walls, provision of drainage for footbridge and approach including SUDS to north of bridge. - Associated Works & Consents

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-r6ebe6-0000497025-2018-02-09T00:00:00Z",
    "date": "2018-02-09T00:00:00Z",
    "ocid": "ocds-r6ebe6-0000497025",
    "initiationType": "tender",
    "parties": [
        {
            "id": "org-2",
            "name": "Glasgow City Council",
            "identifier": {
                "legalName": "Glasgow City Council"
            },
            "address": {
                "streetAddress": "Chief Executives Department, City Chambers",
                "locality": "Glasgow",
                "region": "UKM82",
                "postalCode": "G2 1DU"
            },
            "contactPoint": {
                "email": "caroline.dougan@glasgow.gov.uk",
                "telephone": "+44 1412876845",
                "faxNumber": "+44 1412879399",
                "url": "https://www.publictendersscotland.publiccontractsscotland.gov.uk"
            },
            "roles": [
                "buyer",
                "centralPurchasingBody",
                "reviewBody"
            ],
            "details": {
                "classifications": [
                    {
                        "id": "Regional or local authority",
                        "scheme": "TED_CA_TYPE"
                    },
                    {
                        "id": "01",
                        "description": "General public services",
                        "scheme": "COFOG"
                    }
                ],
                "url": "http://www.glasgow.gov.uk"
            }
        },
        {
            "id": "org-22",
            "name": "Glasgow City Council",
            "identifier": {
                "legalName": "Glasgow City Council"
            },
            "address": {
                "streetAddress": "Chief Executives Department, City Chambers",
                "locality": "Glasgow",
                "region": "UKM82",
                "postalCode": "G2 1DU"
            },
            "contactPoint": {
                "email": "jay.mansfield@glasgow.gov.uk",
                "telephone": "+44 1412872000",
                "faxNumber": "+44 1412879399",
                "url": "http://"
            },
            "roles": [
                "buyer",
                "centralPurchasingBody",
                "reviewBody"
            ],
            "details": {
                "classifications": [
                    {
                        "id": "Regional or local authority",
                        "scheme": "TED_CA_TYPE"
                    },
                    {
                        "id": "01",
                        "description": "General public services",
                        "scheme": "COFOG"
                    }
                ],
                "url": "https://www.glasgow.gov.uk/"
            }
        }
    ],
    "buyer": {
        "name": "Glasgow City Council",
        "id": "org-22"
    },
    "tender": {
        "id": "GCC004274CPU",
        "title": "M8 Footbridge (Sighthill)",
        "description": "As part of the regeneration of the Sighthill Area of the City it is proposed to construct a new footbridge over the M8 motorway to provide a connection from Sighthill to Baird Street and on to the City Centre. The works are summarised as follows:- - Demolition of existing M8 footbridge - Demolition/Removal of existing high mast motorway lighting column/base and construction of two new high mast lights and bases. - Construction of new footbridge over M8 - Construction of bridge approach ramps, retaining walls, provision of drainage and public realm to south of bridge - Landscaping works, construction of retaining walls, provision of drainage for footbridge and approach including SUDS to north of bridge. - Associated Works & Consents",
        "status": "cancelled",
        "items": [
            {
                "id": "1",
                "additionalClassifications": [
                    {
                        "id": "45221100",
                        "scheme": "CPV"
                    },
                    {
                        "id": "45221110",
                        "scheme": "CPV"
                    },
                    {
                        "id": "44212120",
                        "scheme": "CPV"
                    },
                    {
                        "id": "45221115",
                        "scheme": "CPV"
                    }
                ],
                "deliveryLocation": {
                    "description": "Sighthill to Baird Street, Glasgow"
                },
                "deliveryAddresses": [
                    {
                        "region": "UKM82"
                    },
                    {
                        "region": "UK"
                    }
                ],
                "relatedLot": "1"
            }
        ],
        "value": {
            "amount": 16500000,
            "currency": "GBP"
        },
        "procurementMethod": "selective",
        "procurementMethodDetails": "Restricted procedure",
        "mainProcurementCategory": "works",
        "submissionMethod": [
            "electronicSubmission"
        ],
        "submissionMethodDetails": "https://www.publictendersscotland.publiccontractsscotland.gov.uk/web/login.html",
        "tenderPeriod": {
            "endDate": "2017-09-06T12:00:00Z"
        },
        "documents": [
            {
                "id": "AUG291716",
                "documentType": "contractNotice",
                "title": "M8 Footbridge (Sighthill)",
                "description": "As part of the regeneration of the Sighthill Area of the City it is proposed to construct a new footbridge over the M8 motorway to provide a connection from Sighthill to Baird Street and on to the City Centre. The works are summarised as follows:- - Demolition of existing M8 footbridge - Demolition/Removal of existing high mast motorway lighting column/base and construction of two new high mast lights and bases. - Construction of new footbridge over M8 - Construction of bridge approach ramps, retaining walls, provision of drainage and public realm to south of bridge - Landscaping works, construction of retaining walls, provision of drainage for footbridge and approach including SUDS to north of bridge. - Associated Works & Consents",
                "url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG291716",
                "format": "text/html"
            },
            {
                "id": "FEB309701",
                "documentType": "awardNotice",
                "title": "M8 Footbridge (Sighthill)",
                "description": "As part of the regeneration of the Sighthill Area of the City it is proposed to construct a new footbridge over the M8 motorway to provide a connection from Sighthill to Baird Street and on to the City Centre. The works are summarised as follows:- - Demolition of existing M8 footbridge - Demolition/Removal of existing high mast motorway lighting column/base and construction of two new high mast lights and bases. - Construction of new footbridge over M8 - Construction of bridge approach ramps, retaining walls, provision of drainage and public realm to south of bridge - Landscaping works, construction of retaining walls, provision of drainage for footbridge and approach including SUDS to north of bridge. - Associated Works & Consents",
                "url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=FEB309701",
                "format": "text/html"
            }
        ],
        "lots": [
            {
                "id": "1",
                "description": "As part of the regeneration of the Sighthill Area of the City it is proposed to construct a new footbridge over the M8 motorway to provide a connection from Sighthill to Baird Street and on to the City Centre. The works are summarised as follows:- - Demolition of existing M8 footbridge - Demolition/Removal of existing high mast motorway lighting column/base and construction of two new high mast lights and bases. - Construction of new footbridge over M8 - Construction of bridge approach ramps, retaining walls, provision of drainage and public realm to south of bridge - Landscaping works, construction of retaining walls, provision of drainage for footbridge and approach including SUDS to north of bridge. - Associated Works & Consents Further detail on the scope of works is included in the Invitation to Participate document which is available in the buyers attachments area on PCS-T.. Economic operators may be excluded from this competition if they are in any of the situations referred to in regulation 58 of the Public Contracts (Scotland) Regulations 2015.",
                "status": "cancelled",
                "hasOptions": false,
                "secondStage": {
                    "minimumCandidates": 5
                },
                "selectionCriteria": {
                    "description": "It is anticipated that the 5 highest scoring bidders will be invited to tender, where 5 bidders can be identified as having met the minimum criteria for consideration. Where there is a score differential of less than 2% between the fifth placed bidder and subsequent lower ranking bidders, those lower ranking bidders will also be shortlisted and invited to tender, up to a maximum of 7 bidders in total. Only if there is a tie at 7 bidders will more than 7 bidders be invited to tender as all the tied bidders will be invited to tender."
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "contractPeriod": {
                    "durationInDays": 360
                },
                "hasRenewal": false
            }
        ],
        "contractTerms": {
            "hasElectronicPayment": true,
            "hasElectronicOrdering": true,
            "electronicInvoicingPolicy": "allowed",
            "performanceTerms": "The contract will be governed by NEC3 Engineering and Construction conditions of contract. Full details of the conditions of contract will be set out within the Invitation to Tender. Key Performance Indicators applicable to the contract will be provided in the Invitation to Tender documentation."
        },
        "coveredBy": [
            "GPA"
        ],
        "secondStage": {
            "invitationDate": "2017-12-08T00:00:00Z"
        },
        "selectionCriteria": {
            "criteria": [
                {
                    "type": "economic",
                    "description": "Please refer to Document 1 - ESPD Statements Document and Document 2 - Invitation to Participate attached within the buyers attachment area on PCS-T.",
                    "minimum": "Please refer to Document 1 - ESPD Statements Document and Document 2 - Invitation to Participate attached within the buyers attachment area on PCS-T."
                },
                {
                    "type": "technical",
                    "description": "Please refer to Document 1 - ESPD Statements Document and Document 2 - Invitation to Participate attached within the buyers attachment area on PCS-T.",
                    "minimum": "Please refer to Document 1 - ESPD Statements Document and Document 2 - Invitation to Participate attached within the buyers attachment area on PCS-T."
                }
            ]
        },
        "submissionTerms": {
            "languages": [
                "en"
            ],
            "bidValidityPeriod": {
                "durationInDays": 120
            }
        },
        "classification": {
            "id": "45221113",
            "scheme": "CPV"
        },
        "reviewDetails": "Glasgow City Council (\"the Council\") must, by notice in writing as soon as possible after the decision has been made, inform all tenderers and candidates concerned of its decision to award and conclude the contract. The Council must allow a period of at least the relevant standstill period (where the notice is sent by facsimile or electronic means the period is 10 days ending at midnight at the end of the 10th day after that on which the last notice is sent, when sent by other means the period is 15 days) to elapse between the date of despatch of the notice referred to in Regulation 85(1) of the Public Contracts (Scotland) Regulations 2015 (\"the Regulations\"). The Council is obliged to comply with the Regulations and any eligible economic operator can bring an action in the Sheriff Court or the Court of Session where as a consequence of a breach by the Council, suffers or risks suffering loss or damage. The bringing of court proceedings during the standstill period means that the Council must not enter into the contract or conclude the contract unless the proceedings are determined, discounted or disposed of; or the court, by interim order, brings to an end the prohibition. The bringing of court proceedings after the standstill period has elapsed and the remedies that are available to the courts are detailed in the Regulations. Economic Operators can write to the Council seeking further clarification on the notice, to which the Council must respond within 15 days. Economic Operators should be mindful to seek their own independent legal advice when they consider appropriate to do so.",
        "hasRecurrence": false
    },
    "language": "EN",
    "description": "Please refer to Document 1 - ESPD Statements Document attached within the buyers attachment area on PCS-T. (SC Ref:529927)",
    "links": [
        {
            "rel": "canonical",
            "href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000497025"
        },
        {
            "rel": "canonical",
            "href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000497025"
        }
    ],
    "noticetype": "OJEU - F3 - Contract Award Notice",
    "awards": [
        {
            "id": "GCC004274CPU",
            "status": "unsuccessful",
            "statusDetails": "discontinued",
            "relatedLots": [
                "1"
            ]
        }
    ],
    "relatedProcesses": [
        {
            "id": "1",
            "relationship": [
                "planning"
            ],
            "scheme": "EU-OJ",
            "identifier": "2017/S 150-309713"
        }
    ]
}