Notice Information
Notice Title
A70 Glenbuck Realignment
Notice Description
The Works to be carried out under the contract comprise the realignment of some 530m of the existing A70 carriageway and widening and resurfacing of some 250m of existing carriageway at the junction to the former Glenbuck village. A further 230m of existing carriageway is to be regulated and re-surfaced. The existing Glenbuck Bridge crossing the River Ayr is to be demolished and replaced with contractor designed box culvert units under a phased construction. There is associated earthworks, drainage and SUDS pond, safety fencing, boundary fencing, concrete works, signing, lining and landscaping. Statutory Undertaker diversion works are also required in respect of Scottish Water and BT Openreach.
Lot Information
Lot 1
The Works to be carried out under the contract comprise the realignment of some 530m of the existing A70 carriageway and widening and resurfacing of some 250m of existing carriageway at the junction to the former Glenbuck village. A further 230m of existing carriageway is to be regulated and re-surfaced. The existing Glenbuck Bridge crossing the River Ayr is to be demolished and replaced with contractor designed box culvert units under a phased construction. There is associated earthworks, drainage and SUDS pond, safety fencing, boundary fencing, concrete works, signing, lining and landscaping. Statutory Undertaker diversion works are also required in respect of Scottish Water and BT Openreach.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-r6ebe6-0000514128
- Publication Source
- Public Contracts Scotland
- Latest Notice
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUL325015
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- PCS Notice - Website Contract Award Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Large
Common Procurement Vocabulary (CPV)
- CPV Divisions
-
- CPV Codes
45233000 - Construction, foundation and surface works for highways, roads
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £2,059,130 £1M-£10M
Notice Dates
- Publication Date
- 12 Jul 20188 years ago
- Submission Deadline
- 14 Nov 2017Expired
- Future Notice Date
- Not specified
- Award Date
- 15 Jun 20188 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Complete
- Awards Status
- Not Specified
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- East Ayrshire Council
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- KILMARNOCK
- Postcode
- KA3 7BU
- Postcode Area
- Kilmarnock
- Country
- Scotland
-
- Major Region (ITL 1)
- TLM Scotland
- Basic Region (ITL 2)
- TLM9 Southern Scotland
- Small Region (ITL 3)
- TLM93 North Ayrshire and East Ayrshire
- Delivery Location
- TLM93 North Ayrshire and East Ayrshire
-
- Local Authority
- East Ayrshire
- Electoral Ward
- Kilmarnock East and Hurlford
- Westminster Constituency
- Kilmarnock and Loudoun
Further Information
Notice Documents
-
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=OCT297260
A70 Glenbuck Realignment - The Works to be carried out under the contract comprise the realignment of some 530m of the existing A70 carriageway and widening and resurfacing of some 250m of existing carriageway at the junction to the former Glenbuck village. A further 230m of existing carriageway is to be regulated and re-surfaced. The existing Glenbuck Bridge crossing the River Ayr is to be demolished and replaced with contractor designed box culvert units under a phased construction. There is associated earthworks, drainage and SUDS pond, safety fencing, boundary fencing, concrete works, signing, lining and landscaping. Statutory Undertaker diversion works are also required in respect of Scottish Water and BT Openreach. -
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUL325015
A70 Glenbuck Realignment - The Works to be carried out under the contract comprise the realignment of some 530m of the existing A70 carriageway and widening and resurfacing of some 250m of existing carriageway at the junction to the former Glenbuck village. A further 230m of existing carriageway is to be regulated and re-surfaced. The existing Glenbuck Bridge crossing the River Ayr is to be demolished and replaced with contractor designed box culvert units under a phased construction. There is associated earthworks, drainage and SUDS pond, safety fencing, boundary fencing, concrete works, signing, lining and landscaping. Statutory Undertaker diversion works are also required in respect of Scottish Water and BT Openreach.
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.