Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works)

ARGYLL AND BUTE COUNCIL

This public procurement record has 1 release in its history.

Summary of the contracting process

The Argyll and Bute Council is initiating a public procurement process for the "Rothesay Pier Settlement – Phase 2 (Grouting & Piling Works)", located in Rothesay, Isle of Bute. This project addresses settlement issues behind the existing quay wall and aims to prevent sliding failure by constructing a relieving reinforced concrete slab supported by piles. Currently in the planning stage, this tender has a future notice date set for 5th October 2020, offering organisations the opportunity to prepare for upcoming submissions.

This tender presents significant opportunities for businesses in the construction and civil engineering sectors, particularly those specialising in marine or coastal works. Companies with expertise in grouting, piling, and related infrastructure projects would be well-suited to compete. Engaging with this contract could enhance local business presence, facilitate growth in workforce capacity, and foster ongoing relationships with public sector entities such as the Argyll and Bute Council.

Find more tenders on our Open Data Platform.
How relevant is this notice?

Notice Title

Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works)

Notice Description

Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by 225/559mm piles to the east and west sections, coupled with a grout curtain and mass grout to the central 30m section.

Lot Information

Lot 1

Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by 225/559mm piles to the east and west sections, coupled with a grout curtain and mass grout to the central 30m section.

Publication & Lifecycle

Open Contracting ID
ocds-r6ebe6-0000630230
Publication Source
Public Contracts Scotland
Latest Notice
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=SEP394340
Current Stage
Planning
All Stages
Planning

Procurement Classification

Notice Type
PCS Notice - Website Prior Information Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Not Specified
Procurement Method Details
Not specified
Tender Suitability
Not specified
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

45 - Construction work


CPV Codes

45262340 - Grouting work

Notice Value(s)

Tender Value
Not specified
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
9 Sep 20205 years ago
Submission Deadline
Not specified
Future Notice Date
5 Oct 2020Expired
Award Date
Not specified
Contract Period
Not specified - Not specified
Recurrence
Not specified

Notice Status

Tender Status
Planned
Lots Status
Planned
Awards Status
Not Specified
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
ARGYLL AND BUTE COUNCIL
Contact Name
Available with D3 Tenders Premium →
Contact Email
Available with D3 Tenders Premium →
Contact Phone
Available with D3 Tenders Premium →

Buyer Location

Locality
LOCHGILPHEAD
Postcode
PA31 8RT
Post Town
Paisley
Country
Scotland

Major Region (ITL 1)
TLM Scotland
Basic Region (ITL 2)
TLM2 Highlands and Islands
Small Region (ITL 3)
TLM20 Highlands and Islands
Delivery Location
TLM63 Lochaber, Skye and Lochalsh, Arran and Cumbrae, and Argyll and Bute

Local Authority
Argyll and Bute
Electoral Ward
Mid Argyll
Westminster Constituency
Argyll, Bute and South Lochaber

Further Information

Notice Documents

  • https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=SEP394340
    Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works) - Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by 225/559mm piles to the east and west sections, coupled with a grout curtain and mass grout to the central 30m section.

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-r6ebe6-0000630230-2020-09-09T00:00:00Z",
    "date": "2020-09-09T00:00:00Z",
    "ocid": "ocds-r6ebe6-0000630230",
    "initiationType": "tender",
    "parties": [
        {
            "id": "org-2",
            "name": "Argyll and Bute Council",
            "identifier": {
                "legalName": "Argyll and Bute Council"
            },
            "address": {
                "streetAddress": "Kilmory",
                "locality": "Lochgilphead",
                "region": "UKM",
                "postalCode": "PA31 8RT"
            },
            "contactPoint": {
                "name": "Elaine Appleby",
                "email": "elaine.appleby@argyll-bute.gov.uk",
                "telephone": "+44 1546604194",
                "url": "http://"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "classifications": [
                    {
                        "id": "Regional or local authority",
                        "scheme": "TED_CA_TYPE"
                    },
                    {
                        "id": "01",
                        "description": "General public services",
                        "scheme": "COFOG"
                    }
                ],
                "url": "http://www.argyll-bute.gov.uk"
            }
        }
    ],
    "buyer": {
        "name": "Argyll and Bute Council",
        "id": "org-2"
    },
    "planning": {
        "documents": [
            {
                "id": "SEP394340",
                "documentType": "plannedProcurementNotice",
                "title": "Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works)",
                "description": "Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by 225/559mm piles to the east and west sections, coupled with a grout curtain and mass grout to the central 30m section.",
                "url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=SEP394340",
                "format": "text/html"
            }
        ]
    },
    "tender": {
        "id": "ocds-r6ebe6-0000630230",
        "title": "Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works)",
        "description": "Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by 225/559mm piles to the east and west sections, coupled with a grout curtain and mass grout to the central 30m section.",
        "status": "planned",
        "items": [
            {
                "id": "1",
                "deliveryLocation": {
                    "description": "Rothesay, Isle of Bute"
                },
                "deliveryAddresses": [
                    {
                        "region": "UKM63"
                    }
                ],
                "relatedLot": "1"
            }
        ],
        "mainProcurementCategory": "works",
        "lots": [
            {
                "id": "1",
                "description": "Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by 225/559mm piles to the east and west sections, coupled with a grout curtain and mass grout to the central 30m section.",
                "status": "planned"
            }
        ],
        "communication": {
            "futureNoticeDate": "2020-10-05T00:00:00Z"
        },
        "coveredBy": [
            "GPA"
        ],
        "classification": {
            "id": "45262340",
            "scheme": "CPV"
        }
    },
    "language": "EN",
    "description": "NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at https://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=630230. (SC Ref:630230)",
    "links": [
        {
            "rel": "canonical",
            "href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000630230"
        }
    ],
    "noticetype": "PCS Notice - Website Prior Information Notice"
}