Planning

Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works) - Re-tender

ARGYLL AND BUTE COUNCIL

This public procurement record has 1 release in its history.

Summary of the contracting process

The Argyll and Bute Council is initiating a tender for the "Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works) - Re-tender," which is categorised under works in the public services industry. This procurement is set in Rothesay, Isle of Bute, with the planned communication date for future notices on 13th September 2021. The contracting authority aims to address issues stemming from settlement behind the quay wall at Rothesay Pier, building on previous work that included installing a scour screen to protect the structure from further deterioration.

This tender presents a significant opportunity for construction and engineering firms specialising in civil works, especially those with experience in marine and infrastructure projects. Companies capable of offering innovative solutions for structural issues, such as the construction of relieving slabs and grout application, will be particularly well-suited to compete for this contract. Engaging in this project not only allows businesses to showcase their expertise but also to contribute to the enhancement of vital local infrastructure in Scotland.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works) - Re-tender

Notice Description

Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by piles to the east and west sections, coupled with a grout curtain and mass grout to the central section.

Lot Information

Lot 1

Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by piles to the east and west sections, coupled with a grout curtain and mass grout to the central section.

Publication & Lifecycle

Open Contracting ID
ocds-r6ebe6-0000665631
Publication Source
Public Contracts Scotland
Latest Notice
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG425948
Current Stage
Planning
All Stages
Planning

Procurement Classification

Notice Type
PCS Notice - Website Prior Information Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Not Specified
Procurement Method Details
Not specified
Tender Suitability
Not specified
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

44 - Construction structures and materials; auxiliary products to construction (except electric apparatus)

45 - Construction work


CPV Codes

44212400 - Piling

45262340 - Grouting work

Notice Value(s)

Tender Value
Not specified
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
31 Aug 20214 years ago
Submission Deadline
Not specified
Future Notice Date
13 Sep 2021Expired
Award Date
Not specified
Contract Period
Not specified - Not specified
Recurrence
Not specified

Notice Status

Tender Status
Planned
Lots Status
Planned
Awards Status
Not Specified
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
ARGYLL AND BUTE COUNCIL
Contact Name
Not specified
Contact Email
elaine.appleby@argyll-bute.gov.uk
Contact Phone
Not specified

Buyer Location

Locality
LOCHGILPHEAD
Postcode
PA31 8RT
Post Town
Paisley
Country
Scotland

Major Region (ITL 1)
TLM Scotland
Basic Region (ITL 2)
TLM2 Highlands and Islands
Small Region (ITL 3)
TLM20 Highlands and Islands
Delivery Location
TLM63 Lochaber, Skye and Lochalsh, Arran and Cumbrae, and Argyll and Bute

Local Authority
Argyll and Bute
Electoral Ward
Mid Argyll
Westminster Constituency
Argyll, Bute and South Lochaber

Further Information

Notice Documents

  • https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG425948
    Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works) - Re-tender - Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by piles to the east and west sections, coupled with a grout curtain and mass grout to the central section.

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-r6ebe6-0000665631-2021-08-31T00:00:00Z",
    "date": "2021-08-31T00:00:00Z",
    "ocid": "ocds-r6ebe6-0000665631",
    "initiationType": "tender",
    "parties": [
        {
            "id": "org-1",
            "name": "Argyll and Bute Council",
            "identifier": {
                "legalName": "Argyll and Bute Council"
            },
            "address": {
                "streetAddress": "Kilmory",
                "locality": "Lochgilphead",
                "region": "UKM",
                "postalCode": "PA31 8RT"
            },
            "contactPoint": {
                "email": "elaine.appleby@argyll-bute.gov.uk",
                "url": "http://"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "classifications": [
                    {
                        "id": "Regional or local authority",
                        "scheme": "TED_CA_TYPE"
                    },
                    {
                        "id": "01",
                        "description": "General public services",
                        "scheme": "COFOG"
                    }
                ],
                "url": "http://www.argyll-bute.gov.uk"
            }
        }
    ],
    "buyer": {
        "name": "Argyll and Bute Council",
        "id": "org-1"
    },
    "planning": {
        "documents": [
            {
                "id": "AUG425948",
                "documentType": "plannedProcurementNotice",
                "title": "Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works) - Re-tender",
                "description": "Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by piles to the east and west sections, coupled with a grout curtain and mass grout to the central section.",
                "url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG425948",
                "format": "text/html"
            }
        ]
    },
    "tender": {
        "id": "ocds-r6ebe6-0000665631",
        "title": "Rothesay Pier Settlement - Phase 2 (Grouting & Piling Works) - Re-tender",
        "description": "Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by piles to the east and west sections, coupled with a grout curtain and mass grout to the central section.",
        "status": "planned",
        "items": [
            {
                "id": "1",
                "additionalClassifications": [
                    {
                        "id": "44212400",
                        "scheme": "CPV"
                    }
                ],
                "deliveryLocation": {
                    "description": "Rothesay, Isle of Bute"
                },
                "deliveryAddresses": [
                    {
                        "region": "UKM63"
                    }
                ],
                "relatedLot": "1"
            }
        ],
        "mainProcurementCategory": "works",
        "lots": [
            {
                "id": "1",
                "description": "Settlement has occurred behind the existing quay wall, specifically to the backfill of the old masonry pier over an approx. length of 120m at Rothesay Pier. The 1st phase of work, completed last year, consisted of the installation of a 5.6m high scour screen along the length to reduce thrust and wave action against the wall and protect and prevent further deterioration of the masonry wall. This contract (Phase 2) aims to address the settlement and prevent sliding failure of the wall by construction of a relieving RC slab supported by piles to the east and west sections, coupled with a grout curtain and mass grout to the central section.",
                "status": "planned"
            }
        ],
        "communication": {
            "futureNoticeDate": "2021-09-13T00:00:00Z"
        },
        "coveredBy": [
            "GPA"
        ],
        "classification": {
            "id": "45262340",
            "scheme": "CPV"
        }
    },
    "language": "EN",
    "description": "NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at https://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=665631. (SC Ref:665631)",
    "links": [
        {
            "rel": "canonical",
            "href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000665631"
        }
    ],
    "noticetype": "PCS Notice - Website Prior Information Notice"
}