Notice Information
Notice Title
Modelling a New Domestic Energy Efficiency Metric
Notice Description
6. The objectives of this research are as follows: A. To identify two possible options for a new 'energy efficiency' metric as set out in paragraph 5 (A & B), and indicate if any SAP/RdSAP changes are required. This research should consider possible variables that could be used for 5B (Fabric Energy Efficiency metric) and advise SG on this in the interim stage 1 report. SG will then take a decision on which one we want tender to take forward for full modelling (see para 7). For each of options A & B, the research must: B. Quantify the modelled values in each metric, in kWh per m2 or other appropriate unit, for each record level dwelling in a suitable housing stock profile dataset. C. Produce new EPC ratings for each metric, to include but not limited to: develop a calculation to convert each metric value into an EPC rating on scale (1-100); investigate options for banding the new scale (linear, exponential); and investigate how to translate the new scale from the current EER scale. The outputs of objective B could be used to set a suitable upper and lower bound for each revised EPC band. D. Estimate the costs and attainability of retrofitting existing dwellings to achieve a higher standard of energy efficiency, using this new metric and scale to identify the energy efficiency measures required to reach an equivalent standard.
Lot Information
Lot 1
6. The objectives of this research are as follows: A. To identify two possible options for a new 'energy efficiency' metric as set out in paragraph 5 (A & B), and indicate if any SAP/RdSAP changes are required. This research should consider possible variables that could be used for 5B (Fabric Energy Efficiency metric) and advise SG on this in the interim stage 1 report. SG will then take a decision on which one we want tender to take forward for full modelling (see para 7). For each of options A & B, the research must: B. Quantify the modelled values in each metric, in kWh per m2 or other appropriate unit, for each record level dwelling in a suitable housing stock profile dataset. C. Produce new EPC ratings for each metric, to include but not limited to: develop a calculation to convert each metric value into an EPC rating on scale (1-100); investigate options for banding the new scale (linear, exponential); and investigate how to translate the new scale from the current EER scale. The outputs of objective B could be used to set a suitable upper and lower bound for each revised EPC band. D. Estimate the costs and attainability of retrofitting existing dwellings to achieve a higher standard of energy efficiency, using this new metric and scale to identify the energy efficiency measures required to reach an equivalent standard.
Renewal: optional 3 months
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-r6ebe6-0000692197
- Publication Source
- Public Contracts Scotland
- Latest Notice
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=MAR472528
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- PCS Notice - Website Contract Award Notice
- Procurement Type
- Standard
- Procurement Category
- Services
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- Not specified
- Awardee Scale
- SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
73 - Research and development services and related consultancy services
-
- CPV Codes
73110000 - Research services
Notice Value(s)
- Tender Value
- £100,000 £100K-£500K
- Lots Value
- £100,000 £100K-£500K
- Awards Value
- Not specified
- Contracts Value
- £93,768 Under £100K
Notice Dates
- Publication Date
- 1 Mar 20232 years ago
- Submission Deadline
- 31 May 2022Expired
- Future Notice Date
- Not specified
- Award Date
- 20 Jun 20223 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Complete
- Awards Status
- Not Specified
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- SCOTTISH GOVERNMENT
- Contact Name
- Bob McLeod
- Contact Email
- bob.mcleod@gov.scot, george.ross@gov.scot
- Contact Phone
- +44 1312443567, +44 1412420133
Buyer Location
- Locality
- ABERDEEN
- Postcode
- AB11 9DB
- Post Town
- Aberdeen
- Country
- Scotland
-
- Major Region (ITL 1)
- TLM Scotland
- Basic Region (ITL 2)
- TLM3 West Central Scotland
- Small Region (ITL 3)
- TLM32 Glasgow City
- Delivery Location
- TLM Scotland
-
- Local Authority
- Glasgow City
- Electoral Ward
- Anderston/City/Yorkhill
- Westminster Constituency
- Glasgow North
Further Information
Notice Documents
-
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=MAY448750
Modelling a New Domestic Energy Efficiency Metric - 6. The objectives of this research are as follows: A. To identify two possible options for a new 'energy efficiency' metric as set out in paragraph 5 (A & B), and indicate if any SAP/RdSAP changes are required. This research should consider possible variables that could be used for 5B (Fabric Energy Efficiency metric) and advise SG on this in the interim stage 1 report. SG will then take a decision on which one we want tender to take forward for full modelling (see para 7). For each of options A & B, the research must: B. Quantify the modelled values in each metric, in kWh per m2 or other appropriate unit, for each record level dwelling in a suitable housing stock profile dataset. C. Produce new EPC ratings for each metric, to include but not limited to: develop a calculation to convert each metric value into an EPC rating on scale (1-100); investigate options for banding the new scale (linear, exponential); and investigate how to translate the new scale from the current EER scale. The outputs of objective B could be used to set a suitable upper and lower bound for each revised EPC band. D. Estimate the costs and attainability of retrofitting existing dwellings to achieve a higher standard of energy efficiency, using this new metric and scale to identify the energy efficiency measures required to reach an equivalent standard. -
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=MAR472528
Modelling a New Domestic Energy Efficiency Metric - 6. The objectives of this research are as follows: A. To identify two possible options for a new 'energy efficiency' metric as set out in paragraph 5 (A & B), and indicate if any SAP/RdSAP changes are required. This research should consider possible variables that could be used for 5B (Fabric Energy Efficiency metric) and advise SG on this in the interim stage 1 report. SG will then take a decision on which one we want tender to take forward for full modelling (see para 7). For each of options A & B, the research must: B. Quantify the modelled values in each metric, in kWh per m2 or other appropriate unit, for each record level dwelling in a suitable housing stock profile dataset. C. Produce new EPC ratings for each metric, to include but not limited to: develop a calculation to convert each metric value into an EPC rating on scale (1-100); investigate options for banding the new scale (linear, exponential); and investigate how to translate the new scale from the current EER scale. The outputs of objective B could be used to set a suitable upper and lower bound for each revised EPC band. D. Estimate the costs and attainability of retrofitting existing dwellings to achieve a higher standard of energy efficiency, using this new metric and scale to identify the energy efficiency measures required to reach an equivalent standard.
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-r6ebe6-0000692197-2023-03-01T00:00:00Z",
"date": "2023-03-01T00:00:00Z",
"ocid": "ocds-r6ebe6-0000692197",
"initiationType": "tender",
"parties": [
{
"id": "org-12",
"name": "Scottish Government",
"identifier": {
"legalName": "Scottish Government"
},
"address": {
"streetAddress": "Marine Scotland, Marine Laboratory, 375 Victoria Road, Torry",
"locality": "Aberdeen",
"region": "UKM50",
"postalCode": "AB11 9DB"
},
"contactPoint": {
"name": "Bob McLeod",
"email": "bob.mcleod@gov.scot",
"telephone": "+44 1312443567",
"url": "http://www.publiccontractsscotland.gov.uk"
},
"roles": [
"buyer",
"centralPurchasingBody",
"mediationBody",
"reviewContactPoint"
],
"details": {
"classifications": [
{
"id": "Ministry or any other national or federal authority, including their regional or local subdivisions",
"scheme": "TED_CA_TYPE"
},
{
"id": "01",
"description": "General public services",
"scheme": "COFOG"
},
{
"id": "Body governed by public law",
"scheme": "TED_CA_TYPE"
},
{
"id": "06",
"description": "Housing and community amenities",
"scheme": "COFOG"
},
{
"id": "07",
"description": "Health",
"scheme": "COFOG"
}
],
"url": "http://www.scotland.gov.uk"
}
},
{
"id": "org-79",
"name": "Sheriff Clerks Office",
"identifier": {
"legalName": "Sheriff Clerks Office"
},
"address": {
"locality": "Edinburgh"
},
"contactPoint": {
"url": "http://"
},
"roles": [
"reviewBody"
]
},
{
"id": "org-59",
"name": "Scottish Government",
"identifier": {
"legalName": "Scottish Government"
},
"address": {
"streetAddress": "4 Atlantic Quay, 70 York St",
"locality": "Glasgow",
"region": "UKM",
"postalCode": "G2 8EA"
},
"contactPoint": {
"email": "george.ross@gov.scot",
"telephone": "+44 1412420133",
"url": "http://"
},
"roles": [
"buyer",
"mediationBody",
"reviewContactPoint"
],
"details": {
"classifications": [
{
"id": "Body governed by public law",
"scheme": "TED_CA_TYPE"
},
{
"id": "09",
"description": "Education",
"scheme": "COFOG"
},
{
"id": "01",
"description": "General public services",
"scheme": "COFOG"
},
{
"id": "National or federal agency/office",
"scheme": "TED_CA_TYPE"
},
{
"id": "Ministry or any other national or federal authority, including their regional or local subdivisions",
"scheme": "TED_CA_TYPE"
},
{
"id": "06",
"description": "Housing and community amenities",
"scheme": "COFOG"
}
],
"url": "http://www.scotland.gov.uk"
}
},
{
"id": "org-541",
"name": "Building Research Establishment Ltd",
"identifier": {
"legalName": "Building Research Establishment Ltd"
},
"address": {
"streetAddress": "Bucknalls Lane",
"locality": "Watford",
"region": "UKH23",
"postalCode": "WD25 9XX"
},
"roles": [
"supplier"
],
"details": {
"scale": "sme",
"url": "http://"
}
},
{
"id": "org-475",
"name": "Sheriff Clerks Office",
"identifier": {
"legalName": "Sheriff Clerks Office"
},
"address": {
"streetAddress": "PO Box 23, 1 Carlton Place",
"locality": "Glasgow",
"postalCode": "G5 9DA"
},
"contactPoint": {
"url": "http://"
},
"roles": [
"reviewBody"
]
}
],
"buyer": {
"name": "Scottish Government",
"id": "org-59"
},
"tender": {
"id": "CASE/605023",
"title": "Modelling a New Domestic Energy Efficiency Metric",
"description": "6. The objectives of this research are as follows: A. To identify two possible options for a new 'energy efficiency' metric as set out in paragraph 5 (A & B), and indicate if any SAP/RdSAP changes are required. This research should consider possible variables that could be used for 5B (Fabric Energy Efficiency metric) and advise SG on this in the interim stage 1 report. SG will then take a decision on which one we want tender to take forward for full modelling (see para 7). For each of options A & B, the research must: B. Quantify the modelled values in each metric, in kWh per m2 or other appropriate unit, for each record level dwelling in a suitable housing stock profile dataset. C. Produce new EPC ratings for each metric, to include but not limited to: develop a calculation to convert each metric value into an EPC rating on scale (1-100); investigate options for banding the new scale (linear, exponential); and investigate how to translate the new scale from the current EER scale. The outputs of objective B could be used to set a suitable upper and lower bound for each revised EPC band. D. Estimate the costs and attainability of retrofitting existing dwellings to achieve a higher standard of energy efficiency, using this new metric and scale to identify the energy efficiency measures required to reach an equivalent standard.",
"status": "complete",
"items": [
{
"id": "1",
"deliveryAddresses": [
{
"region": "UKM"
},
{
"region": "UKM"
}
],
"relatedLot": "1"
}
],
"value": {
"amount": 100000,
"currency": "GBP"
},
"procurementMethod": "open",
"procurementMethodDetails": "Open procedure",
"mainProcurementCategory": "services",
"submissionMethod": [
"electronicSubmission"
],
"submissionMethodDetails": "https://www.publictendersscotland.publiccontractsscotland.gov.uk",
"tenderPeriod": {
"endDate": "2022-05-31T12:00:00Z"
},
"awardPeriod": {
"startDate": "2022-05-31T12:00:00Z"
},
"documents": [
{
"id": "MAY448750",
"documentType": "contractNotice",
"title": "Modelling a New Domestic Energy Efficiency Metric",
"description": "6. The objectives of this research are as follows: A. To identify two possible options for a new 'energy efficiency' metric as set out in paragraph 5 (A & B), and indicate if any SAP/RdSAP changes are required. This research should consider possible variables that could be used for 5B (Fabric Energy Efficiency metric) and advise SG on this in the interim stage 1 report. SG will then take a decision on which one we want tender to take forward for full modelling (see para 7). For each of options A & B, the research must: B. Quantify the modelled values in each metric, in kWh per m2 or other appropriate unit, for each record level dwelling in a suitable housing stock profile dataset. C. Produce new EPC ratings for each metric, to include but not limited to: develop a calculation to convert each metric value into an EPC rating on scale (1-100); investigate options for banding the new scale (linear, exponential); and investigate how to translate the new scale from the current EER scale. The outputs of objective B could be used to set a suitable upper and lower bound for each revised EPC band. D. Estimate the costs and attainability of retrofitting existing dwellings to achieve a higher standard of energy efficiency, using this new metric and scale to identify the energy efficiency measures required to reach an equivalent standard.",
"url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=MAY448750",
"format": "text/html"
},
{
"id": "MAR472528",
"documentType": "awardNotice",
"title": "Modelling a New Domestic Energy Efficiency Metric",
"description": "6. The objectives of this research are as follows: A. To identify two possible options for a new 'energy efficiency' metric as set out in paragraph 5 (A & B), and indicate if any SAP/RdSAP changes are required. This research should consider possible variables that could be used for 5B (Fabric Energy Efficiency metric) and advise SG on this in the interim stage 1 report. SG will then take a decision on which one we want tender to take forward for full modelling (see para 7). For each of options A & B, the research must: B. Quantify the modelled values in each metric, in kWh per m2 or other appropriate unit, for each record level dwelling in a suitable housing stock profile dataset. C. Produce new EPC ratings for each metric, to include but not limited to: develop a calculation to convert each metric value into an EPC rating on scale (1-100); investigate options for banding the new scale (linear, exponential); and investigate how to translate the new scale from the current EER scale. The outputs of objective B could be used to set a suitable upper and lower bound for each revised EPC band. D. Estimate the costs and attainability of retrofitting existing dwellings to achieve a higher standard of energy efficiency, using this new metric and scale to identify the energy efficiency measures required to reach an equivalent standard.",
"url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=MAR472528",
"format": "text/html"
}
],
"lots": [
{
"id": "1",
"description": "6. The objectives of this research are as follows: A. To identify two possible options for a new 'energy efficiency' metric as set out in paragraph 5 (A & B), and indicate if any SAP/RdSAP changes are required. This research should consider possible variables that could be used for 5B (Fabric Energy Efficiency metric) and advise SG on this in the interim stage 1 report. SG will then take a decision on which one we want tender to take forward for full modelling (see para 7). For each of options A & B, the research must: B. Quantify the modelled values in each metric, in kWh per m2 or other appropriate unit, for each record level dwelling in a suitable housing stock profile dataset. C. Produce new EPC ratings for each metric, to include but not limited to: develop a calculation to convert each metric value into an EPC rating on scale (1-100); investigate options for banding the new scale (linear, exponential); and investigate how to translate the new scale from the current EER scale. The outputs of objective B could be used to set a suitable upper and lower bound for each revised EPC band. D. Estimate the costs and attainability of retrofitting existing dwellings to achieve a higher standard of energy efficiency, using this new metric and scale to identify the energy efficiency measures required to reach an equivalent standard.",
"status": "complete",
"value": {
"amount": 100000,
"currency": "GBP"
},
"hasOptions": false,
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"contractPeriod": {
"durationInDays": 150
},
"hasRenewal": true,
"renewal": {
"description": "optional 3 months"
}
}
],
"bidOpening": {
"date": "2022-05-31T12:00:00Z",
"address": {
"streetAddress": "Glasgow"
}
},
"communication": {
"atypicalToolUrl": "https://www.publictendersscotland.publiccontractsscotland.gov.uk"
},
"coveredBy": [
"GPA"
],
"selectionCriteria": {
"criteria": [
{
"type": "economic",
"description": "Bidders must demonstrate a Current Ratio of no less than 0.9 Current Ratio will be calculated as follows: Total current assets divided by Total current liabilities. There must be no qualification or contra-indication from any evidence provided in support of the bidders economic and financial standing."
}
]
},
"submissionTerms": {
"languages": [
"en"
]
},
"classification": {
"id": "73110000",
"scheme": "CPV"
},
"hasRecurrence": false
},
"language": "EN",
"description": "(SC Ref:704091)",
"links": [
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000692197"
},
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000692197"
}
],
"noticetype": "PCS Notice - Website Contract Award Notice",
"awards": [
{
"id": "CASE/605023",
"suppliers": [
{
"id": "org-541",
"name": "Building Research Establishment Ltd"
}
],
"relatedLots": [
"1"
]
}
],
"contracts": [
{
"id": "CASE/605023",
"awardID": "CASE/605023",
"status": "active",
"value": {
"amount": 93768,
"currency": "GBP"
},
"dateSigned": "2022-06-20T00:00:00Z"
}
],
"bids": {
"statistics": [
{
"id": "1886",
"measure": "bids",
"value": 2,
"relatedLot": "1"
},
{
"id": "1887",
"measure": "smeBids",
"value": 2,
"relatedLot": "1"
},
{
"id": "1888",
"measure": "foreignBidsFromEU",
"value": 0,
"relatedLot": "1"
},
{
"id": "1889",
"measure": "foreignBidsFromNonEU",
"value": 2,
"relatedLot": "1"
},
{
"id": "1890",
"measure": "electronicBids",
"value": 2,
"relatedLot": "1"
}
]
}
}