Notice Information
Notice Title
THE SUPPLY OF WETLAND ENHANCEMENT WORK AT RSPB BLACK DEVON WETLANDS
Notice Description
Delivery of shallow excavation and earth moving work to deliver wetland habitat features at the RSPB Black Devon Wetlands reserve near Alloa.
Lot Information
Lot 1
RSPB Scotland wishes to receive costings for each element of the work individually, as well as a total cost for the works. 1. Scrape Enlargement Adjacent to Boardwalk: Excavate areas of higher ground around boardwalk by approx. 1.3metres below its current level creating a water depth of approximately 30cm. Remove all willow trees within excavation footprint. Lower existing wetland around screen to similar height. Utilise soil to raise height of 'island' in adjacent wetlands above water level (see below). Area approx. 400 m2 2. Deepening of Existing Scrape Adjacent to Boardwalk: Excavate previously created scrape to increase depth by approximately 30cm to create a water depth of 0.3 to 0.5 metres. Area approx. 1000 m2 3. Western Scrape Creation: Top and lightly harrow area to the west of the main pool before creating several shallow scrapes (c approx. 30cm depth). Topping/harrowing area approx. 6000 m2. Scrape creation area approx. 700 m2 4. Re-instatement of Phragmites Channels: Re-Excavate previously created shallow channels through phragmites to remove re-growth and ensure channels remain open. Area approx. 800 m2. 5. Channel Excavation Around Seasonal Island: Excavate channel around existing seasonal island to a depth of approx. 0.5 metres. Area approx. 100 m2 6. Island creation: Utilising spoil from excavations create a series of low islands within main wetland pools. These islands should be no more than 0.3 metres above water level (same as existing peninsula) with shallow graded edges. Area approx. 200 m2. Any remaining spoil not utilised for island building should be removed to western edge of site. All measurements for the wetland features above are approximate and should be used as guidance only. We expect the successful contractor to work closely with the reserve team to finalise the finer details of the work while on site. It is important that spoil from the excavation is used to create low islands within the wetland or removed away from the wetland and placed in the spoil deposition areas outlined on the map. Please confirm that you are able to deliver this in your tender response. RSPB Black Devon Wetlands is a wet and marshy site and contractors will have to be comfortable working in these conditions. It is expected that the type of equipment and machinery used will be clearly stated in the tender and be suitable for the proposed work. This machinery should be suitable for deployment in wetland environments and spill kits maintained on site to contain any fuel or hydraulic fluids which may escape from machinery or storage tanks. Any storage tanks are required to be situated away from the working area and agreed in advance of site works commencing. In the interests of biosecurity, vehicles and equipment must be thoroughly cleaned before arriving on site and on departure. Finally, RSPB Black Devon Wetlands, and particularly the area around the viewing screen and footpath, is used by visitors. Safety of visitors and operators must be paramount and exclusion zones around working areas in proximity to visitor areas must be clearly demarked. Procedures must be in place to ensure work is stopped safely in the event of a visitor entering the working area.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-r6ebe6-0000844381
- Publication Source
- Public Contracts Scotland
- Latest Notice
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=SEP565609
- Current Stage
- Tender
- All Stages
- Tender
Procurement Classification
- Notice Type
- PCS Notice - Website Contract Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
-
- CPV Codes
45111220 - Scrub-removal work
45112000 - Excavating and earthmoving work
45112500 - Earthmoving work
45112700 - Landscaping work
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 30 Sep 20261 weeks ago
- Submission Deadline
- 19 Oct 20262 weeks to go
- Future Notice Date
- Not specified
- Award Date
- Not specified
- Contract Period
- 26 Oct 2026 - 31 Dec 2026 1-6 months
- Recurrence
- Not specified
Notice Status
- Tender Status
- Active
- Lots Status
- Active
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- RSPB Scotland
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- EDINBURGH
- Postcode
- EH12 9DH
- Postcode Area
- Edinburgh
- Country
- Scotland
-
- Major Region (ITL 1)
- TLM Scotland
- Basic Region (ITL 2)
- TLM1 East Central Scotland
- Small Region (ITL 3)
- TLM13 City of Edinburgh
- Delivery Location
- TLM72 Clackmannanshire and Fife
-
- Local Authority
- City of Edinburgh
- Electoral Ward
- Drum Brae/Gyle
- Westminster Constituency
- Edinburgh West
Further Information
Notice Documents
-
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=SEP565609
THE SUPPLY OF WETLAND ENHANCEMENT WORK AT RSPB BLACK DEVON WETLANDS - Delivery of shallow excavation and earth moving work to deliver wetland habitat features at the RSPB Black Devon Wetlands reserve near Alloa.
Notice URLs
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.