WP15.04 IEP Access and Retaining Wall - Old Oak Common (S4) Station
Watford - BALFOUR BEATTY VINCI SYSTRA JV
Tender Published: 10th April 2025 14:50:05 PM Contracts FinderWP 15.04 IEP Access and Retaining wall Scope The scope consists of two key components: A new/altered access route at the west end of the Hitachi IEP Depot to facilitate construction works for the wider project. A new retaining wall structure to retain the IEP Depot infrastructure whilst also forming the eastern boundary of the new Old Oak Common Lane alignment. The following will be required: Detailed design, supply and installation of the above scope. Fully coordinated design with the existing and new Old Oak Common Lane alignments, Part 2/3 bridge structure, utilities through Old Oak Common Lane and the GWML UTX tunnels. Provide RIBA 5 design and construction drawings including setting out detailing, general arrangements, and elevation drawings for construction. Provide samples and construct a mock up in accordance with the Old Oak Common Lane Schedule 17 architectural requirements IEP Depot Access Route (Stage 2) - the ramp The existing access route in the southwest corner of the Hitachi IEP Depot needs adapting to suit Old Oak Common (BBVS and SRSA) construction traffic requirements. IEP Depot [...]