Notice Information
Notice Title
Minor Works Framework for Stockton on Tees Borough Council
Notice Description
A framework for Stockton-on-Tees Borough Council for Minor Works Services covering the following Lots; Lot 1: Mechanical Services (including domestic gas, industrial gas and oil) Lot 2: Electrical Services (including domestic and commercial re-wires) Lot 3: Roofing & Fascia's Lot 4: Building and Joinery Lot 5: Flooring Lot 6: Windows Lot 7: Fire Alarm & Specialist Equipment Installation Lot 8: Footpath and Carriageway Works including Ducting Works Lot 9: Drainage Works Lot 10: Street Lighting Lot 11: Play Area Works (MUGA) installation and removal of equipment Lot 12: Street Furniture Works Lot 13: Landscaping and Earth Works Lot 14: Solar Panel Installations Lot 15: Boiler Installations Lot 16: Low Carbon Heating Installations Lot 17: Cavity Wall installations Lot 18: External wall insulation Lot 19: Installation of Thermally Efficient Glazing - not awarded Lot 20: Loft insulation Lot 21: Residential Extensions Lot 22: Hard Standing / Driveways Lot 23: Door Entry Systems
Lot Information
Mechanical Services (including domestic gas, industrial gas and oil)
Mechanical installations in Council managed properties i.e boiler installations.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Electrical Services (including domestic and commercial re-wires)Electrical installations in Council managed properties i.e electrical rewiring.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Roofing & Fascia'sThe installation / repair of roofing to Council managed properties
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Building and JoineryBuilding Services for buildings managed by Stockton on Tees Council.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
FlooringInstallation and laying of flooring to Council managed properties.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
WindowsWindow Installations to buildings managed by Stockton on Tees Council.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Fire Alarm & Specialist Equipment InstallationInstallation of new fire alarm systems in Council managed buildings. This does not include the maintenance of the newly installed systems.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Footpath and Carriageway Works including Ducting WorksThe reconstruction of Footpath and Carriageway which includes the removal and installation of road kerbs, edging kerbs, footpath and carriageway surface which could be tarmac, flags, concrete and block paving.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Drainage WorksThe removal and installation of manholes, gullies, drainage leads including enhanced drainage systems with the use of aco drains and slot drains
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Street LightingThe removal and installation of Street Lighting, including the erection of the street lighting column, lantern, internal apparatus, orange duct and termination of the column. Additional works involved in this section will be the installation and removal of illuminate traffic bollards and signs.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Play Area Works (MUGA) installation and removal of equipmentInstallation of Play Areas and MUGA (Multi Use Games Area) to ROSPA specifications. installation of play equipment including foundation, installation of litter bins, seating areas, fencing, lighting and play area surfacing.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Street Furniture WorksStreet furniture installations include repair works. These elements of works include signs and pole, guardrail, bollards, bins, benches and fences.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Landscaping and Earth WorksLandscaping and Earth work services at sites around Stockton on Tees.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Solar Panel InstallationsInstallation of Solar Panel technology including pre survey work to assess suitability of the structure through to completion and practical sign off.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Boiler InstallationsInstallation of energy efficient boilers to residential properties, either replacement or new installations. Works include the surveying to assess suitability through to practical completion sign off.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Low Carbon Heating InstallationsInstallation of low carbon heating systems including air source heat pumps, ground source heat pumps and associated infrastructure. The scope also includes any potential new technologies that may come to market delivering low carbon measures. Works include the surveying to assess suitability through to practical completion sign off.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Cavity Wall InstallationsCavity Wall insulation of buildings. Works include the surveying to assess suitability through to practical completion sign off.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
External wall InsulationExternal Wall Insulations, Materials and technology to be determined upon call offs. Works include the surveying to assess suitability through to practical completion sign off.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Installation of Thermally Efficient GlazingInstallation of thermally efficient glazing, latest technology to be used and will be advised at call off stage. Works include the surveying to assess suitability through to practical completion sign off.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Loft insulationLoft insulation in residential properties. The latest technology and materials are to be used and will be specified at call off stage. Works include the surveying to assess suitability through to practical completion sign off.
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Residential ExtensionsResidential building extensions for residents where a Disabled Facility Grant has been awarded enabling the homeowner more appropriate space / facilities in their own home. Also extensions to foster carers homes to provide additional living space fall within the scope of this Lot
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Hard Standing / DrivewaysThe provision of parking areas and extending of existing parking areas to residential properties
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Door Entry SystemsProvision of automated door entry systems and controls to residential properties to facilitate disabled access
Options: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Renewal: The framework may be extended following the initial period of 24 months for 2 x 12 month periods
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-02e7b1
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/002948-2022
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- Award Notice
- Procurement Type
- Framework
- Procurement Category
- Works
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Large, SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
09 - Petroleum products, fuel, electricity and other sources of energy
31 - Electrical machinery, apparatus, equipment and consumables; lighting
37 - Musical instruments, sport goods, games, toys, handicraft, art materials and accessories
-
- CPV Codes
09331000 - Solar panels
09332000 - Solar installation
31625200 - Fire-alarm systems
37535200 - Playground equipment
42160000 - Boiler installations
42511110 - Heat pumps
42961100 - Access control system
44220000 - Builders' joinery
45112700 - Landscaping work
45232452 - Drainage works
45233161 - Footpath construction work
45233293 - Installation of street furniture
45261900 - Roof repair and maintenance work
45262800 - Building extension work
45310000 - Electrical installation work
45316110 - Installation of road lighting equipment
45320000 - Insulation work
45321000 - Thermal insulation work
45331100 - Central-heating installation work
45421100 - Installation of doors and windows and related components
45432110 - Floor-laying work
45450000 - Other building completion work
50710000 - Repair and maintenance services of electrical and mechanical building installations
Notice Value(s)
- Tender Value
- £31,000,000 £10M-£100M
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £14,250,000 £10M-£100M
Notice Dates
- Publication Date
- 2 Feb 20224 years ago
- Submission Deadline
- 22 Nov 2022Expired
- Future Notice Date
- Not specified
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Cancelled
- Awards Status
- Active, Unsuccessful
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- Stockton on Tees Borough Council
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- STOCKTON-ON-TEES
- Postcode
- TS19 1SF
- Postcode Area
- Cleveland
- Country
- England
-
- Major Region (ITL 1)
- TLC North East (England)
- Basic Region (ITL 2)
- TLC3 Tees Valley
- Small Region (ITL 3)
- TLC31 Hartlepool and Stockton-on-Tees
- Delivery Location
- TLC11 Hartlepool and Stockton-on-Tees
-
- Local Authority
- Stockton-on-Tees
- Electoral Ward
- Stockton Town Centre
- Westminster Constituency
- Stockton North
Supplier Information
- Number of Suppliers
- 40
- Supplier Names
Meldrum Construction Services Ltd
QUARTZ ELECTRICAL & MECHANICAL SERVICES LIMITED
SRB Plumbing & Mechanical Services
FLOWING CONSTRUCTION SERVICES LIMITED
NT Sweeting Roofing Contractors Ltd
OpenView Security Solutions Limited
Brambledown Landscape Services Ltd
Highway Construction Services Ltd
Seymour Civil Engineering Contractors Ltd
Marshall and McCourt Plumbing & Heating Contractors Ltd
Rothwell Plumbing Services Ltd
Further Information
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.