Notice Information
Notice Title
Essex Waste Management Partnership Residual Waste Treatment Contract
Notice Description
Lot Information
Lot 1
VII.1.4) Description of the procurement: As described above, the Contract was awarded on 31 May 2012 to UBB Waste (Essex) Limited, following the completion of a full tender process. The contracted works and services were for the design, construction, commissioning, handback and operation of a mechanical biological treatment (MBT) facility in the Tovi Eco-Park (Basildon, Essex). Following the initial construction of the facility, the contract provided for a commissioning period followed by Acceptance Tests to confirm that the facility could meet the performance requirements in the contract. If not ultimately passed by an Acceptance Longstop Date of 12 January 2017, the Authority was entitled to terminate the Contract. The facility did not pass the Acceptance Test by the Acceptance Longstop Date, which resulted in the Authority commencing litigation against the contractor. The Authority has given notice that it is proposing to take a decision to enter into an Amendment and Settlement Agreement to settle that litigation and to amend the handback requirements of the contract on the basis that the site will be cleared and returned to ECC in a condition that will allow for its future redevelopment. It is expected that the modified contract will have a term expiring in 2040. More specifically, the contractor shall: - Demolish the MBT facility to ground slab level. - Surrender the Environmental Permit which relates to the operation of the MBT facility and is held by Urbaser Environmental Limited. - Remove certain hazardous substances from the site and hand back the site in accordance with the conditions in the Amendment and Settlement Agreement, to the satisfaction of an independent environmental consultant. - Remove certain plant and equipment from the MBT facility prior to its demolition. - Design and build a new surface water management system for the site. This includes re-grading part of the site and installing new surface water retention structures. - Install new sections of security fencing for the site. - Arrange for the de-energisation of the UKPN electrical sub-station and install a new power supply to the site to serve the surface water management system. - Fill below-ground voids following the demolition process with granular materials. - Obtain all necessary consents to enable the works. - Surrender to the Authority its sub-lease interest in the site. - Procure that its ultimate parent companies indemnifies the Authority (until the expiry of a period of three years following handback) against any failure by the contractor to perform its obligations as set out above and further detailed in the Amendment and Settlement Agreement. A VEAT notice is also published linked to this modification. The current modifications have arisen in connection with the proposed settlement of the litigation and the subsequent proposed amendment of the handback requirements of the Contract. The services / works which form part of the agreement with the contractor (which include the demolition services / works) are estimated to be in the region of c. 1% of the original value of the Contract (which was c. PS800m).
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-032282
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/007144-2022
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- Award Notice
- Procurement Type
- Standard
- Procurement Category
- Services
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- Not specified
- Awardee Scale
- Large
Common Procurement Vocabulary (CPV)
- CPV Divisions
09 - Petroleum products, fuel, electricity and other sources of energy
31 - Electrical machinery, apparatus, equipment and consumables; lighting
42 - Industrial machinery
45 - Construction work
71 - Architectural, construction, engineering and inspection services
77 - Agricultural, forestry, horticultural, aquacultural and apicultural services
79 - Business services: law, marketing, consulting, recruitment, printing and security
90 - Sewage, refuse, cleaning and environmental services
-
- CPV Codes
09100000 - Fuels
09310000 - Electricity
31682000 - Electricity supplies
42914000 - Recycling equipment
45111000 - Demolition, site preparation and clearance work
45111200 - Site preparation and clearance work
45200000 - Works for complete or part construction and civil engineering work
45222110 - Waste disposal site construction work
45232470 - Waste transfer station
71314100 - Electrical services
71340000 - Integrated engineering services
77120000 - Composting services
79420000 - Management-related services
79990000 - Miscellaneous business-related services
90000000 - Sewage, refuse, cleaning and environmental services
90500000 - Refuse and waste related services
90510000 - Refuse disposal and treatment
90720000 - Environmental protection
90730000 - Pollution tracking and monitoring and rehabilitation
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £809,900,000 £100M-£1B
Notice Dates
- Publication Date
- 16 Mar 20223 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 30 May 201213 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Not Specified
- Lots Status
- Not Specified
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- ESSEX COUNTY COUNCIL
- Contact Name
- Katie Bray
- Contact Email
- katie.bray@essex.gov.uk
- Contact Phone
- +44 3330132305
Buyer Location
- Locality
- CHELMSFORD
- Postcode
- CM1 1QH
- Post Town
- Chelmsford
- Country
- England
-
- Major Region (ITL 1)
- TLH East (England)
- Basic Region (ITL 2)
- TLH3 Essex
- Small Region (ITL 3)
- TLH36 Heart of Essex
- Delivery Location
- TLH3 Essex
-
- Local Authority
- Chelmsford
- Electoral Ward
- Moulsham and Central
- Westminster Constituency
- Chelmsford
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-032282-2022-03-16T12:01:56Z",
"date": "2022-03-16T12:01:56Z",
"ocid": "ocds-h6vhtk-032282",
"description": "For transparency reasons, a VEAT notice is also published to inform the market of the modifications. A standstill period of at least 10 days will be observed following publication and prior to the signing the modified contract.",
"initiationType": "tender",
"tender": {
"id": "1410",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "Essex Waste Management Partnership Residual Waste Treatment Contract",
"classification": {
"scheme": "CPV",
"id": "90510000",
"description": "Refuse disposal and treatment"
},
"mainProcurementCategory": "services",
"lots": [
{
"id": "1",
"description": "VII.1.4) Description of the procurement: As described above, the Contract was awarded on 31 May 2012 to UBB Waste (Essex) Limited, following the completion of a full tender process. The contracted works and services were for the design, construction, commissioning, handback and operation of a mechanical biological treatment (MBT) facility in the Tovi Eco-Park (Basildon, Essex). Following the initial construction of the facility, the contract provided for a commissioning period followed by Acceptance Tests to confirm that the facility could meet the performance requirements in the contract. If not ultimately passed by an Acceptance Longstop Date of 12 January 2017, the Authority was entitled to terminate the Contract. The facility did not pass the Acceptance Test by the Acceptance Longstop Date, which resulted in the Authority commencing litigation against the contractor. The Authority has given notice that it is proposing to take a decision to enter into an Amendment and Settlement Agreement to settle that litigation and to amend the handback requirements of the contract on the basis that the site will be cleared and returned to ECC in a condition that will allow for its future redevelopment. It is expected that the modified contract will have a term expiring in 2040. More specifically, the contractor shall: - Demolish the MBT facility to ground slab level. - Surrender the Environmental Permit which relates to the operation of the MBT facility and is held by Urbaser Environmental Limited. - Remove certain hazardous substances from the site and hand back the site in accordance with the conditions in the Amendment and Settlement Agreement, to the satisfaction of an independent environmental consultant. - Remove certain plant and equipment from the MBT facility prior to its demolition. - Design and build a new surface water management system for the site. This includes re-grading part of the site and installing new surface water retention structures. - Install new sections of security fencing for the site. - Arrange for the de-energisation of the UKPN electrical sub-station and install a new power supply to the site to serve the surface water management system. - Fill below-ground voids following the demolition process with granular materials. - Obtain all necessary consents to enable the works. - Surrender to the Authority its sub-lease interest in the site. - Procure that its ultimate parent companies indemnifies the Authority (until the expiry of a period of three years following handback) against any failure by the contractor to perform its obligations as set out above and further detailed in the Amendment and Settlement Agreement. A VEAT notice is also published linked to this modification. The current modifications have arisen in connection with the proposed settlement of the litigation and the subsequent proposed amendment of the handback requirements of the Contract. The services / works which form part of the agreement with the contractor (which include the demolition services / works) are estimated to be in the region of c. 1% of the original value of the Contract (which was c. PS800m).",
"contractPeriod": {
"durationInDays": 9720
}
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "09100000",
"description": "Fuels"
},
{
"scheme": "CPV",
"id": "09310000",
"description": "Electricity"
},
{
"scheme": "CPV",
"id": "31682000",
"description": "Electricity supplies"
},
{
"scheme": "CPV",
"id": "42914000",
"description": "Recycling equipment"
},
{
"scheme": "CPV",
"id": "45111200",
"description": "Site preparation and clearance work"
},
{
"scheme": "CPV",
"id": "45222110",
"description": "Waste disposal site construction work"
},
{
"scheme": "CPV",
"id": "45232470",
"description": "Waste transfer station"
},
{
"scheme": "CPV",
"id": "71314100",
"description": "Electrical services"
},
{
"scheme": "CPV",
"id": "71340000",
"description": "Integrated engineering services"
},
{
"scheme": "CPV",
"id": "77120000",
"description": "Composting services"
},
{
"scheme": "CPV",
"id": "79420000",
"description": "Management-related services"
},
{
"scheme": "CPV",
"id": "79990000",
"description": "Miscellaneous business-related services"
},
{
"scheme": "CPV",
"id": "90500000",
"description": "Refuse and waste related services"
}
],
"deliveryAddresses": [
{
"region": "UKH3"
}
],
"deliveryLocation": {
"description": "Courtauld Close, off Courtauld Road, Basildon, Essex, SS13 1FL"
},
"relatedLot": "1"
}
]
},
"awards": [
{
"id": "007144-2022-1410-1",
"relatedLots": [
"1"
],
"status": "active",
"suppliers": [
{
"id": "GB-FTS-46967",
"name": "UBB Waste (Essex) Limited"
}
]
}
],
"parties": [
{
"id": "GB-FTS-46965",
"name": "ESSEX COUNTY COUNCIL",
"identifier": {
"legalName": "ESSEX COUNTY COUNCIL"
},
"address": {
"locality": "CHELMSFORD",
"region": "UKH3",
"postalCode": "CM1 1QH",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Katie Bray",
"telephone": "+44 3330132305",
"email": "katie.bray@essex.gov.uk"
},
"roles": [
"buyer"
],
"details": {
"url": "https://www.essex.gov.uk/"
}
},
{
"id": "GB-FTS-46967",
"name": "UBB Waste (Essex) Limited",
"identifier": {
"legalName": "UBB Waste (Essex) Limited"
},
"address": {
"streetAddress": "Westmoreland House, 80-86 Bath Road",
"locality": "Cheltenham",
"region": "UKK1",
"postalCode": "GL53 7JT",
"countryName": "United Kingdom"
},
"contactPoint": {
"telephone": "+44 8000725634",
"email": "toviecopark@urbaser.co.uk"
},
"roles": [
"supplier"
],
"details": {
"url": "https://www.ubbessex.co.uk/",
"scale": "large"
}
},
{
"id": "GB-FTS-2515",
"name": "The High Court",
"identifier": {
"legalName": "The High Court"
},
"address": {
"locality": "London",
"postalCode": "WC2A 2LL",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
}
],
"buyer": {
"id": "GB-FTS-46965",
"name": "ESSEX COUNTY COUNCIL"
},
"contracts": [
{
"id": "007144-2022-1410-1",
"awardID": "007144-2022-1410-1",
"status": "active",
"value": {
"amount": 809900000,
"currency": "GBP"
},
"dateSigned": "2012-05-31T00:00:00+01:00",
"period": {
"durationInDays": 9720
},
"items": [
{
"id": "1",
"classification": {
"scheme": "CPV",
"id": "90000000",
"description": "Sewage, refuse, cleaning and environmental services"
},
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45111000",
"description": "Demolition, site preparation and clearance work"
},
{
"scheme": "CPV",
"id": "45200000",
"description": "Works for complete or part construction and civil engineering work"
},
{
"scheme": "CPV",
"id": "90720000",
"description": "Environmental protection"
},
{
"scheme": "CPV",
"id": "90730000",
"description": "Pollution tracking and monitoring and rehabilitation"
}
],
"deliveryAddresses": [
{
"region": "UKH3"
}
],
"deliveryLocation": {
"description": "Courtauld Close, off Courtauld Road, Basildon, Essex, SS13 1FL"
},
"relatedLot": "1"
}
],
"amendments": [
{
"id": "1",
"description": "See description at VII.I.4.",
"rationale": "Need for additional works, services or supplies by the original contractor/concessionaire: These works are essential to ensure that, following the failure of the contractor to implement the initial contracted works, the site at Tovi Eco-Park is cleared and decontaminated as necessary in accordance with the appropriate environmental standards and returned to the Authority in a state that allows its future re-development. As UBB Waste (Essex) Limited was the original contractor who built the MBT facility, it has (i) the full set of technical information (including detailed records of the construction history of the site relating to the above ground and underground structures) and prior experience required to carry out the demolition and associated modification works to the requisite standards and (ii) particular knowledge of and experience with the hazardous substances used on the site (including knowledge of where events of contamination have occurred in the past). As the requisite Environmental Permit is held by an affiliate of the contractor, the contractor is essential to surrender the Environmental Permit. In addition to these technical reasons, there are significant economic reasons preventing a change of contractor. These arrangements are being put in place in the context of a planned settlement of litigation and the objective is to avoid the contractor passing back to ECC the costs of restoring the site in issue. UBB Waste (Essex) Limited, as the contractor responsible for the original work, is also in a position to procure the provision to the Authority of a comprehensive package of warranties and indemnities for the work undertaken. As regards the avoidance of inconvenience or duplication of costs, UBB Waste (Essex) Limited is already present on site with certain machinery and equipment. Its pre-existent knowledge and experience with the MBT facility on site means that significant duplication of costs is avoided. The introduction of a new contractor would also cause significant inconvenience and delay in the rectification of the site, a need for ECC to coordinate the interface between UBB Waste (Essex) Limited and the new contractor, and result in ECC paying for someone else to take a risk which had already been allocated to UBB Waste (Essex) Limited (and which it may not be possible to pass on in full)."
}
]
}
],
"links": [
{
"rel": "prev",
"href": "https://ted.europa.eu/udl?uri=TED:NOTICE:323258-2009:TEXT:EN:HTML"
}
],
"language": "en"
}