Notice Information
Notice Title
SPT - Strategic Agreement for Transmission Overhead Line Works
Notice Description
SPT has appointed partners with the capacity and capability to deliver its strategic infrastructure priorities through a strategic collaborative delivery model. The agreement comprises three (3) Lots: - * Lot 1 is for 400kV Overhead Line Works involving a HTLS (High Temperature Low Sag) conductor system * Lot 2 is for 275kV and 400kV Overhead Line Works * Lot 3 is for 132kV Overhead Line Works The partners appointed to the agreement may be allocated projects and they will provide engineering and design, procure any materials and equipment, and carry out the construction works as per the agreed design with SPT. The contractual arrangements comprise a main Framework Agreement regulating the rights and obligations of SPT and the partners, with call-off contracts for individual packages using the NEC4 family of contracts. There is no guarantee, express or implied, that the appointed partners under the Framework Agreement will receive any, or a particular volume or value of work.
Lot Information
Design & Construction of 400kV Overhead Lines with HTLS
Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice).
Options: The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement.
Renewal: The duration of the Framework Agreement is an initial 5 years, but extendable up to a maximum of 10 years at SPT's option.
Design & Construction of 275kV and 400kV Overhead LinesPlease refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice)
Options: The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement.
Renewal: The duration of the Framework Agreement is an initial 5 years, but extendable up to a maximum of 10 years at SPT's option.
Design & Construction of 132kV Overhead Line WorksPlease refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice).
Options: The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement.
Renewal: The duration of the Framework Agreement is an initial 5 years, but extendable up to a maximum of 10 years at SPT's option.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-04295b
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/050887-2025
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Framework
- Procurement Category
- Works
- Procurement Method
- Selective
- Procurement Method Details
- Negotiated procedure with prior call for competition
- Tender Suitability
- Not specified
- Awardee Scale
- Large, SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45231400 - Construction work for electricity power lines
Notice Value(s)
- Tender Value
- £3,000,000,000 £1B-£10B
- Lots Value
- £3,000,000,000 £1B-£10B
- Awards Value
- Not specified
- Contracts Value
- £3,000,000,000 £1B-£10B
Notice Dates
- Publication Date
- 22 Aug 20256 months ago
- Submission Deadline
- 31 Jan 2024Expired
- Future Notice Date
- Not specified
- Award Date
- 2 Dec 20241 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Cancelled
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- SP TRANSMISSION PLC
- Contact Name
- SPT Strategic Projects
- Contact Email
- ohlstrategicagreement@scottishpower.com
- Contact Phone
- Not specified
Buyer Location
- Locality
- GLASGOW
- Postcode
- G2 5AD
- Post Town
- Glasgow
- Country
- Scotland
-
- Major Region (ITL 1)
- TLM Scotland
- Basic Region (ITL 2)
- TLM3 West Central Scotland
- Small Region (ITL 3)
- TLM32 Glasgow City
- Delivery Location
- TLM Scotland
-
- Local Authority
- Glasgow City
- Electoral Ward
- Anderston/City/Yorkhill
- Westminster Constituency
- Glasgow North
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-04295b-2025-08-22T13:35:04+01:00",
"date": "2025-08-22T13:35:04+01:00",
"ocid": "ocds-h6vhtk-04295b",
"description": "All financial values stated in this notice are calculated using current prices plus assumed inflation based on RPI forecast rates to 2034. All values are estimates only and the final outturn values will depend on the precise works and services required to be delivered, the means of delivery, the way in which programme and project risks materialise, the actual rates of inflation up to completion of the programme, and other factors. The precise details of each identified project, including specific location, route, form of electricity network infrastructure, construction methodology, and any associated mitigation or enhancement schemes are indicative and remain to be confirmed. The final project details are subject to all necessary consents being obtained (such as any required DCO, Electricity Act 1989 consent or planning permission), the requirements of those consents, and the terms of any necessary land rights to be secured to enable project delivery. SPT gives no commitment as to the basis on which any necessary consents or land rights will be applied for, or obtained. This Framework Agreement, along with other framework agreements that SPT may procure through separate procurement processes, will contribute to SPT's delivery of its strategic projects under the Holistic Network Design (HND) model (which are funded by the Accelerated Strategic Transmission Investment, Large Onshore Transmission Investment and Medium Sized Investment Project frameworks) as well as any baseline projects forming part of SPT's RIIO-T2 and RIIO-T/3 price control settlements and any customer connection projects that SPT considers appropriate to be delivered under this model. For the avoidance of doubt, SPT may have separate arrangements for the delivery of similar works to the works which SPT intends to procure under the Framework Agreement but such arrangements may be based on a different delivery model. It is currently anticipated that SPT's HND programme will be delivered by the partners through these Framework Agreements and the call-off contracts awarded under them, and the full scope of that is included in the scope advertised by this notice. However, and without limiting that, the works and services awarded to the partners through this Framework Agreement, and the other framework agreements, may extend beyond work required for the HND programme to involve additional works and services, through the award of further contracts in reliance on the procedure in Regulation 48(4)(e) of the Utilities Contracts (Scotland) Regulations 2016 concerning direct awards for new works, services or both, consisting of the repetition of similar works or services. Any contracts for new works or services consisting of the repetition of similar works or services will (as relevant in the circumstances) conform to the requirements of SPT's HND programme and / or for a particular project for which contracts are called-off under these Framework Agreements",
"initiationType": "tender",
"tender": {
"id": "SPT-OHL-SA",
"legalBasis": {
"id": "32014L0025",
"scheme": "CELEX"
},
"title": "SPT - Strategic Agreement for Transmission Overhead Line Works",
"status": "complete",
"classification": {
"scheme": "CPV",
"id": "45231400",
"description": "Construction work for electricity power lines"
},
"mainProcurementCategory": "works",
"description": "SPT has appointed partners with the capacity and capability to deliver its strategic infrastructure priorities through a strategic collaborative delivery model. The agreement comprises three (3) Lots: - * Lot 1 is for 400kV Overhead Line Works involving a HTLS (High Temperature Low Sag) conductor system * Lot 2 is for 275kV and 400kV Overhead Line Works * Lot 3 is for 132kV Overhead Line Works The partners appointed to the agreement may be allocated projects and they will provide engineering and design, procure any materials and equipment, and carry out the construction works as per the agreed design with SPT. The contractual arrangements comprise a main Framework Agreement regulating the rights and obligations of SPT and the partners, with call-off contracts for individual packages using the NEC4 family of contracts. There is no guarantee, express or implied, that the appointed partners under the Framework Agreement will receive any, or a particular volume or value of work.",
"value": {
"amount": 3000000000,
"currency": "GBP"
},
"lotDetails": {
"awardCriteriaDetails": "Where more than one Lot may be awarded to the same bidder, SPT reserves the right to award contracts combining several or all Lots. Bidders can bid for one, two or all three Lots."
},
"lots": [
{
"id": "1",
"title": "Design & Construction of 400kV Overhead Lines with HTLS",
"description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice).",
"value": {
"amount": 600000000,
"currency": "GBP"
},
"contractPeriod": {
"durationInDays": 3600
},
"hasRenewal": true,
"renewal": {
"description": "The duration of the Framework Agreement is an initial 5 years, but extendable up to a maximum of 10 years at SPT's option."
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": true,
"options": {
"description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
},
"status": "cancelled",
"awardCriteria": {
"criteria": [
{
"name": "Non-Commercial",
"type": "quality",
"description": "50%"
},
{
"name": "Commercial",
"type": "cost",
"description": "50%"
}
]
}
},
{
"id": "2",
"title": "Design & Construction of 275kV and 400kV Overhead Lines",
"description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice)",
"value": {
"amount": 1875000000,
"currency": "GBP"
},
"contractPeriod": {
"durationInDays": 3600
},
"hasRenewal": true,
"renewal": {
"description": "The duration of the Framework Agreement is an initial 5 years, but extendable up to a maximum of 10 years at SPT's option."
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": true,
"options": {
"description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
},
"status": "cancelled",
"awardCriteria": {
"criteria": [
{
"name": "Non-Commercial",
"type": "quality",
"description": "50%"
},
{
"name": "Commercial",
"type": "cost",
"description": "50%"
}
]
}
},
{
"id": "3",
"title": "Design & Construction of 132kV Overhead Line Works",
"description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice).",
"value": {
"amount": 525000000,
"currency": "GBP"
},
"contractPeriod": {
"durationInDays": 3600
},
"hasRenewal": true,
"renewal": {
"description": "The duration of the Framework Agreement is an initial 5 years, but extendable up to a maximum of 10 years at SPT's option."
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": true,
"options": {
"description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
},
"status": "cancelled",
"awardCriteria": {
"criteria": [
{
"name": "Non-Commercial",
"type": "quality",
"description": "50%"
},
{
"name": "Commercial",
"type": "cost",
"description": "50%"
}
]
}
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45231400",
"description": "Construction work for electricity power lines"
}
],
"deliveryAddresses": [
{
"region": "UKM"
},
{
"region": "UKM"
}
],
"deliveryLocation": {
"description": "SPT plan to work on a number of 400kV OHL with HTLS projects within this scope across its licence area covering central and southern Scotland."
},
"relatedLot": "1"
},
{
"id": "2",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45231400",
"description": "Construction work for electricity power lines"
}
],
"deliveryAddresses": [
{
"region": "UKM"
},
{
"region": "UKM"
}
],
"deliveryLocation": {
"description": "SPT plan to work on a number of 275kV and 400kV OHL projects within this scope across its licence area covering central and southern Scotland."
},
"relatedLot": "2"
},
{
"id": "3",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45231400",
"description": "Construction work for electricity power lines"
}
],
"deliveryAddresses": [
{
"region": "UKM"
},
{
"region": "UKM"
}
],
"deliveryLocation": {
"description": "SPT plan to work on a number of 132kV OHL projects within this scope across its licence area covering central and southern Scotland."
},
"relatedLot": "3"
}
],
"participationFees": [
{
"id": "1",
"type": [
"document"
]
}
],
"submissionMethod": [
"written"
],
"selectionCriteria": {
"criteria": [
{
"type": "suitability",
"description": "Please refer to the AQ",
"appliesTo": [
"supplier"
]
}
]
},
"documents": [
{
"id": "economic",
"documentType": "economicSelectionCriteria"
},
{
"id": "technical",
"documentType": "technicalSelectionCriteria"
}
],
"otherRequirements": {
"reductionCriteria": "Please refer to the rules and criteria for participation and shortlisting as stated in the AQ."
},
"submissionTerms": {
"depositsGuarantees": "SPT may require that suppliers provide a parent company guarantee/guarantees or other form of suitable security (depending on the corporate structure) to cover all call-off contracts which may be issued to them under the Framework Agreement. Any bond requirements would be set out on a case-by-case basis in each call-off contract. Further details will be provided in the procurement documents.",
"languages": [
"en"
],
"bidValidityPeriod": {
"durationInDays": 180
}
},
"contractTerms": {
"tendererLegalForm": "Where a group of economic operators are bidding, SPT may require the group to assume a specific legal form for the purpose of the award of the Framework Agreement, or to require that each economic operator assumes joint and several liability.",
"performanceTerms": "Please refer to the contract documentation",
"hasElectronicOrdering": true,
"electronicInvoicingPolicy": "allowed",
"hasElectronicPayment": true
},
"procurementMethod": "selective",
"procurementMethodDetails": "Negotiated procedure with prior call for competition",
"techniques": {
"hasFrameworkAgreement": true,
"frameworkAgreement": {
"periodRationale": "The potential 10 year duration is to align with SPT's part of the UK's aims through the \"Pathway to 2030 Holistic Network Design\" (as a first step towards Net Zero) and further substantial delivery steps that will be required (with respect to projects to be completed in the first half of the 2030s) to achieve Net Zero by 2050."
}
},
"tenderPeriod": {
"endDate": "2024-01-31T12:00:00Z"
},
"secondStage": {
"invitationDate": "2024-02-26T00:00:00Z"
},
"hasRecurrence": false,
"reviewDetails": "Any proceedings relating to a breach of a duty owed by SPT to an economic operator under the Utilities Contracts (Scotland) Regulations 2016 in relation to this procurement must be started within 30 days beginning with the date when the economic operator first knew or ought to have known that grounds for starting the proceedings had arisen unless the court considers that there is a good reason for extending the period within which proceedings may be brought, in which case the court may extend that period up to a maximum of 3 months from that date."
},
"parties": [
{
"id": "GB-COH-SC189126",
"name": "SP TRANSMISSION PLC",
"identifier": {
"legalName": "SP TRANSMISSION PLC",
"id": "SC189126",
"scheme": "GB-COH"
},
"address": {
"streetAddress": "320 St. Vincent Street",
"locality": "Glasgow",
"region": "UKM82",
"postalCode": "G2 5AD",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "SPT Strategic Projects",
"email": "OHLstrategicagreement@scottishpower.com",
"url": "https://portal.mygosupply.com/login"
},
"roles": [
"buyer"
],
"details": {
"url": "http://www.spenergynetworks.co.uk/",
"buyerProfile": "https://www.scottishpower.com/pages/suppliers.aspx",
"classifications": [
{
"scheme": "TED_CE_ACTIVITY",
"id": "ELECTRICITY",
"description": "Electricity"
}
]
}
},
{
"id": "GB-FTS-2553",
"name": "Glasgow Sheriff Court",
"identifier": {
"legalName": "Glasgow Sheriff Court"
},
"address": {
"streetAddress": "1 Carlton Place",
"locality": "Glasgow",
"postalCode": "G5 9DA",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
},
{
"id": "GB-COH-01062438",
"name": "Balfour Beatty Utility Solutions Limited",
"identifier": {
"legalName": "Balfour Beatty Utility Solutions Limited",
"id": "01062438",
"scheme": "GB-COH"
},
"address": {
"locality": "London",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-COH-00245626",
"name": "M Group Energy (Network Infrastructure) Limited",
"identifier": {
"legalName": "M Group Energy (Network Infrastructure) Limited",
"id": "00245626",
"scheme": "GB-COH"
},
"address": {
"locality": "Stevenage",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-COH-04273754",
"name": "Morgan Sindall Construction & Infrastructure Ltd",
"identifier": {
"legalName": "Morgan Sindall Construction & Infrastructure Ltd",
"id": "04273754",
"scheme": "GB-COH"
},
"address": {
"locality": "London",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-COH-12930461",
"name": "Aureos Energy Limited",
"identifier": {
"legalName": "Aureos Energy Limited",
"id": "12930461",
"scheme": "GB-COH"
},
"address": {
"locality": "London",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-COH-11829648",
"name": "Wood Transmission And Distribution Limited",
"identifier": {
"legalName": "Wood Transmission And Distribution Limited",
"id": "11829648",
"scheme": "GB-COH"
},
"address": {
"locality": "Knutsford",
"region": "UK",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-FTS-158716",
"name": "Painhas S.A.",
"identifier": {
"legalName": "Painhas S.A.",
"noIdentifierRationale": "notOnAnyRegister"
},
"address": {
"locality": "Viana do Castelo",
"region": "PT",
"countryName": "Portugal"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-COH-SC062782",
"name": "Power Lines, Pipes and Cables Limited",
"identifier": {
"legalName": "Power Lines, Pipes and Cables Limited",
"id": "SC062782",
"scheme": "GB-COH"
},
"address": {
"locality": "Scotland",
"region": "UKM",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "sme"
}
},
{
"id": "GB-FTS-158717",
"name": "Cobra Instalaciones y Servicios SA",
"identifier": {
"legalName": "Cobra Instalaciones y Servicios SA",
"noIdentifierRationale": "notOnAnyRegister"
},
"address": {
"locality": "Madrid",
"region": "ES",
"countryName": "Spain"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
}
],
"buyer": {
"id": "GB-COH-SC189126",
"name": "SP TRANSMISSION PLC"
},
"language": "en",
"awards": [
{
"id": "050887-2025-1",
"relatedLots": [
"1"
],
"title": "Design & Construction of 400kV Overhead Lines with HTLS",
"status": "active",
"suppliers": [
{
"id": "GB-COH-01062438",
"name": "Balfour Beatty Utility Solutions Limited"
},
{
"id": "GB-COH-00245626",
"name": "M Group Energy (Network Infrastructure) Limited"
},
{
"id": "GB-COH-04273754",
"name": "Morgan Sindall Construction & Infrastructure Ltd"
}
]
},
{
"id": "050887-2025-2",
"relatedLots": [
"2"
],
"title": "Design & Construction of 275kV and 400kV Overhead Lines",
"status": "active",
"suppliers": [
{
"id": "GB-COH-01062438",
"name": "Balfour Beatty Utility Solutions Limited"
},
{
"id": "GB-COH-12930461",
"name": "Aureos Energy Limited"
},
{
"id": "GB-COH-04273754",
"name": "Morgan Sindall Construction & Infrastructure Ltd"
},
{
"id": "GB-COH-00245626",
"name": "M Group Energy (Network Infrastructure) Limited"
},
{
"id": "GB-COH-11829648",
"name": "Wood Transmission And Distribution Limited"
},
{
"id": "GB-FTS-158716",
"name": "Painhas S.A."
}
]
},
{
"id": "050887-2025-3",
"relatedLots": [
"3"
],
"title": "Design & Construction of 132kV Overhead Line Works",
"status": "active",
"suppliers": [
{
"id": "GB-COH-01062438",
"name": "Balfour Beatty Utility Solutions Limited"
},
{
"id": "GB-COH-12930461",
"name": "Aureos Energy Limited"
},
{
"id": "GB-COH-04273754",
"name": "Morgan Sindall Construction & Infrastructure Ltd"
},
{
"id": "GB-COH-00245626",
"name": "M Group Energy (Network Infrastructure) Limited"
},
{
"id": "GB-COH-SC062782",
"name": "Power Lines, Pipes and Cables Limited"
},
{
"id": "GB-FTS-158716",
"name": "Painhas S.A."
},
{
"id": "GB-FTS-158717",
"name": "Cobra Instalaciones y Servicios SA"
},
{
"id": "GB-COH-11829648",
"name": "Wood Transmission And Distribution Limited"
}
]
}
],
"contracts": [
{
"id": "050887-2025-1",
"awardID": "050887-2025-1",
"title": "Design & Construction of 400kV Overhead Lines with HTLS",
"status": "active",
"value": {
"amount": 600000000,
"currency": "GBP"
},
"dateSigned": "2024-12-02T00:00:00Z"
},
{
"id": "050887-2025-2",
"awardID": "050887-2025-2",
"title": "Design & Construction of 275kV and 400kV Overhead Lines",
"status": "active",
"value": {
"amount": 1875000000,
"currency": "GBP"
},
"dateSigned": "2024-12-02T00:00:00Z"
},
{
"id": "050887-2025-3",
"awardID": "050887-2025-3",
"title": "Design & Construction of 132kV Overhead Line Works",
"status": "active",
"value": {
"amount": 525000000,
"currency": "GBP"
},
"dateSigned": "2024-12-02T00:00:00Z"
}
],
"bids": {
"statistics": [
{
"id": "1",
"measure": "bids",
"relatedLot": "1",
"value": 3
},
{
"id": "3",
"measure": "bids",
"relatedLot": "2",
"value": 6
},
{
"id": "5",
"measure": "bids",
"relatedLot": "3",
"value": 8
},
{
"id": "2",
"measure": "electronicBids",
"relatedLot": "1",
"value": 3
},
{
"id": "4",
"measure": "electronicBids",
"relatedLot": "2",
"value": 6
},
{
"id": "6",
"measure": "electronicBids",
"relatedLot": "3",
"value": 8
}
]
}
}