-
Contract Timeline
- Publication Date
-
6th February 2024 11:04:46 AM
-
Contract Summary
The Infrastructure Monitoring Programme has engaged extensively with the route and regional engineering teams to understand their future requirements for measurement and monitoring of the Overhead Line. Network Rail currently collects dynamic measurement data using a dedicated vehicle, which has a permanently fitted Instrumented Pantograph measurement system. This train is over 60 years old and unable to reach speeds over 90mph. Network Rail has also installed a permanently fitted Instrumented Pantograph measurement system on a Passenger Train that operates on the West Coast Mainline between London and Scotland. It is recognised that there are now a broad range of systems that can remotely monitor OLE. To meet Network Rail’s current standard (NR/L2/ELP/27325), Network Rail would like to be able to collect data on overhead line assets using measurement systems that are temporarily fitted to Passenger Trains to increase the frequency and coverage of data currently being collected.
-
Contract Details
- Open Contracting ID
-
ocds-h6vhtk-043778
- Publication Source
-
Find a Tender Service
- Procurement Stage
-
Planning
- Procurement Method
-
N/A
- Procurement Method Details
-
N/A
- Procurement Category
-
Services
- Tender Suitability
-
- Framework / DPS
-
Contract Classification
- CPV Code(s)
-
71631470
- CPV Division(s)
-
71 - Architectural, construction, engineering and inspection services
-
Awarding Authority
- Buyer Name
- Buyer Email
-
Mark.adams3@networkrail.co.uk
- Buyer Phone
-
+44 1908781000
- Buyer Address
-
Waterloo General Offices
London
SE1 8SW
United Kingdom