Burnwood Community School Kitchen extension
Notice Description
Stoke-on-Trent City Council has allocated funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and an extension is required to cater for increased intake. The Council intends to utilise a 2-stage Design and Build contract for this project. As such, the Council will be looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA). The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage. The City Council has allocated a total budget of PS450,000 for the kitchen extension. This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out. The deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025. This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period. If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period.
Lot Information
Lot 1
Stoke-on-Trent City Council has allocated funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and an extension is required to cater for increased intake. There is currently a staff WC and changing room within the kitchen area which would need to be retained but could be re-located. There is also a boiler room, electricity cupboard and food store which again would need to be retained but could be re-located. The extension design is expected to comply with BB103 The successful consultant will be invited to an inception meeting at the school and further client engagement meetings as required with the school leadership to discuss the issues and requirements in more detail. The Council intends to utilise a 2-stage Design and Build contract for this project. As such, the Council will be looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA). The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage. The contractor will need to provide services in a number of fields including architectural design, mechanical, electrical, structural and civil engineering, building surveying, quantity surveying, and project management. Cost management and quantity surveying services will be required to ensure that the design that is being developed can be delivered for the allocated budget. These services can be provided either in-house or through sub-contracted specialists. The successful contractor will have and be able to demonstrate expert knowledge and recent experience of working with educational buildings. The City Council has allocated a total budget of PS450,000 for the kitchen extension. This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out. The deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025. This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period. If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period. The contractor will be required to provide a construction programme and logistics plan for the construction period. At the end of the PCSA period, the contractor will provide their Contractors Proposals and the contract sum for the construction. The consultant will need to attend an inception meeting on site, and meetings to present the work to date at the end of each RIBA stage, with progress meetings throughout the work period arranged as necessary. These may be able to take the form of virtual meetings if appropriate.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-0485df
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/023741-2024
- Current Stage
- Planning
- All Stages
- Planning
Procurement Classification
- Notice Type
- Planning Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45000000 - Construction work
45214200 - Construction work for school buildings
45214210 - Primary school construction work
45214220 - Secondary school construction work
45214300 - Construction work for college buildings
Notice Value(s)
- Tender Value
- £450,000 £100K-£500K
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 30 Jul 20241 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- 19 Sep 2024Expired
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Planned
- Lots Status
- Planned
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- STOKE-ON-TRENT CITY COUNCIL
- Contact Name
- william stuart
- Contact Email
- william.stuart@stoke.gov.uk
- Contact Phone
- +44 7913354238
Buyer Location
- Locality
- STOKE-ON-TRENT
- Postcode
- ST4 1HH
- Post Town
- Stoke-on-Trent
- Country
- England
-
- Major Region (ITL 1)
- TLG West Midlands (England)
- Basic Region (ITL 2)
- TLG2 Shropshire and Staffordshire
- Small Region (ITL 3)
- TLG23 Stoke-on-Trent
- Delivery Location
- Not specified
-
- Local Authority
- Stoke-on-Trent
- Electoral Ward
- Hartshill Park & Stoke
- Westminster Constituency
- Stoke-on-Trent Central
Further Information
Notice URLs
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-0485df-2024-07-30T11:02:41+01:00",
"date": "2024-07-30T11:02:41+01:00",
"ocid": "ocds-h6vhtk-0485df",
"initiationType": "tender",
"tender": {
"id": "ocds-h6vhtk-0485df",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "Burnwood Community School Kitchen extension",
"status": "planned",
"classification": {
"scheme": "CPV",
"id": "45000000",
"description": "Construction work"
},
"mainProcurementCategory": "works",
"description": "Stoke-on-Trent City Council has allocated funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and an extension is required to cater for increased intake. The Council intends to utilise a 2-stage Design and Build contract for this project. As such, the Council will be looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA). The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage. The City Council has allocated a total budget of PS450,000 for the kitchen extension. This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out. The deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025. This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period. If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period.",
"value": {
"amount": 450000,
"currency": "GBP"
},
"lots": [
{
"id": "1",
"description": "Stoke-on-Trent City Council has allocated funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and an extension is required to cater for increased intake. There is currently a staff WC and changing room within the kitchen area which would need to be retained but could be re-located. There is also a boiler room, electricity cupboard and food store which again would need to be retained but could be re-located. The extension design is expected to comply with BB103 The successful consultant will be invited to an inception meeting at the school and further client engagement meetings as required with the school leadership to discuss the issues and requirements in more detail. The Council intends to utilise a 2-stage Design and Build contract for this project. As such, the Council will be looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA). The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage. The contractor will need to provide services in a number of fields including architectural design, mechanical, electrical, structural and civil engineering, building surveying, quantity surveying, and project management. Cost management and quantity surveying services will be required to ensure that the design that is being developed can be delivered for the allocated budget. These services can be provided either in-house or through sub-contracted specialists. The successful contractor will have and be able to demonstrate expert knowledge and recent experience of working with educational buildings. The City Council has allocated a total budget of PS450,000 for the kitchen extension. This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out. The deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025. This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period. If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period. The contractor will be required to provide a construction programme and logistics plan for the construction period. At the end of the PCSA period, the contractor will provide their Contractors Proposals and the contract sum for the construction. The consultant will need to attend an inception meeting on site, and meetings to present the work to date at the end of each RIBA stage, with progress meetings throughout the work period arranged as necessary. These may be able to take the form of virtual meetings if appropriate.",
"status": "planned"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45214200",
"description": "Construction work for school buildings"
},
{
"scheme": "CPV",
"id": "45214210",
"description": "Primary school construction work"
},
{
"scheme": "CPV",
"id": "45214220",
"description": "Secondary school construction work"
},
{
"scheme": "CPV",
"id": "45214300",
"description": "Construction work for college buildings"
}
],
"deliveryAddresses": [
{
"region": "UK"
}
],
"relatedLot": "1"
}
],
"communication": {
"futureNoticeDate": "2024-09-20T00:00:00+01:00"
},
"coveredBy": [
"GPA"
]
},
"parties": [
{
"id": "GB-FTS-114488",
"name": "STOKE-ON-TRENT CITY COUNCIL",
"identifier": {
"legalName": "STOKE-ON-TRENT CITY COUNCIL",
"noIdentifierRationale": "notOnAnyRegister"
},
"address": {
"streetAddress": "Civic Centre,Glebe Street",
"locality": "STOKE-ON-TRENT",
"region": "UKG23",
"postalCode": "ST41HH",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "william stuart",
"telephone": "+44 7913354238",
"email": "william.stuart@stoke.gov.uk"
},
"roles": [
"buyer"
],
"details": {
"url": "https://www.stoke.gov.uk/",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"id": "REGIONAL_AUTHORITY",
"description": "Regional or local authority"
},
{
"scheme": "COFOG",
"id": "01",
"description": "General public services"
}
]
}
}
],
"buyer": {
"id": "GB-FTS-114488",
"name": "STOKE-ON-TRENT CITY COUNCIL"
},
"language": "en"
}