This public procurement record has 3 releases in its history.

Tender

03 Sep 2026 at 14:53

Planning

01 Jun 2026 at 16:28

Planning

08 Apr 2025 at 10:34

Summary of the contracting process

Derbyshire County Council is procuring the hire of non-operated plant, equipment and vehicles for its highways, construction and maintenance activities. The council will operate the hired assets itself, including short-term light commercial vehicle hire. The requirement covers construction plant, agricultural machinery and motor vehicles (CPV 43000000, with related classifications 16000000 and 34100000). It is divided into 17 categories: materials handlers; excavators; kerb and slab lifters; dumpers and skip loaders; rollers; pumps; compactors; breakers; drilling and fixing equipment; saws and cutters; concreting equipment and mixers; trench support and access equipment; generators; temporary site and office accommodation; temporary traffic lights; vehicles; and trailers. Delivery and use are across Derbyshire.

The process reached tender: the council invited offers through an open procedure. Enquiries close at 10:30 on 18 September 2026 and tenders must be submitted by 11:00 on 29 September 2026. The intended award decision date is 30 October 2026. The contract period is 1 December 2026 to 30 November 2028, with renewal arrangements allowing the framework scheme to run until 30 November 2034. The estimated total is £7,000,000 excluding VAT and £8,400,000 including VAT. Each lot is estimated at £411,765 excluding VAT and £494,118 including VAT. Suppliers may bid for any combination of lots. Evaluation is 80% price and 20% quality, with a minimum quality score of 15%.

This opportunity suits equipment-hire businesses and specialist plant, vehicle and temporary-accommodation suppliers with assets covering one or more of the 17 categories. Relevant capabilities include maintaining and supplying excavators, material handlers, dumpers, rollers, pumps, compactors, breakers, generators, traffic-management equipment, site facilities, commercial vehicles or trailers. Suppliers with broad fleets can compete across several categories, while smaller specialists can focus on individual equipment types; the procurement expressly identifies the lots as suitable for small and medium-sized enterprises. The council is seeking reliable, flexible supply that supports safe, consistent and good-quality performance. Appointed suppliers will be ranked within their lot and may receive work through direct awards or further competitions, creating routes for both routine and competitively allocated hires.

How relevant is this notice?

Notice Title

PLACE1100H Hire of Non-Operated Plant, Equipment and Vehicles

Notice Description

Derbyshire County Council (The Council) are seeking to establish an Open Framework to provide the Council with a reliable, flexible, and cost-effective means of hiring plant and equipment, including the short term hires of light commercial vehicles, to be operated by Derbyshire County Council to support highways, construction, and maintenance activities. It is designed to ensure consistent standards of safety, quality, and performance, while offering value for money and streamlined access to a range of equipment types.

Lot Information

Materials Handlers

Hire of material handlers, including forklifts & telehandlers.

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Excavators

Hire of Excavators of various sizes, including tracked & wheeled

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Kerb & Slab Lifters

Hire of Kerb & Slab Lifters - both manually and battery operated

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Dumpers/Skip Loaders

Hire of Dumpers/Skip Loaders of various sizes and weights - both tracked and wheeled

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Rollers

Hire of Rollers, including single or double drum and ride on options

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Pumps

Hire of Pumps, including submersible, trash, centrifugal, diaphragm, puddle and super silent varieties.

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Compactors

Hire of Compactors, including single way and forward & reverse varieties.

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Breakers

Hire of Breakers, including petrol and battery varieties

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Drilling and Fixing Equipment

Hire of Drilling and Fixing Equipment, including electric drill, transformer and petrol generator.

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Saws & Cutters

Hire of Saws/ Cutters including angle grinders, disc cutters and floor-saws

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Concreting Equipment & Mixers

Hire of Concreting Equipment & Mixers including paddle, petrol + diesel mixers and pokers

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Trench Support & Access Equipment

Hire of Trench Support & Access Equipment, including trench props, manhole boxes, trench boxes, fencing and scaffolding

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Generators

Hire of Generators, including petrol and diesel varieties

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Temporary Site and Office Accommodation

Hire of Temporary Site and Office Accommodation, including welfare units and stores

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Temporary Traffic Lights

Hire of Temporary Traffic Lights

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Vehicles

Hire of Vehicles, including LCV's and HGV's

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Trailers

Hire of Trailers of various sizes

Options: Prospective tenderers should note that this contract may be affected by Local Government Reorganisation (LGR). In accordance with Schedule 8 of the Procurement Act 2023, this contract may be novated to a successor council or otherwise modified to reflect the requirements of any new council arrangements arising from LGR. The exact nature of any modification or novation cannot be determined at this time, but such changes will be managed under both the Procurement Act 2023 and the contractual provisions. The Council also reserves the right to request to hire additional plant, equipment and vehicles, that are still materially within scope of the Framework.

Renewal: The proposed Open Framework is expected to commence on 1st December 2026, with an initial term of 2 years, with an optional 12 month extension. The authority intends to reopen the framework at the end of the 3rd year of its establishment (if not already opened prior). The subsequent Framework will also have an initial term of 2 years, with an optional 12 month extension. The final Framework, should this be established, will consist of an initial period of 12 months, with an optional 12 month extension (1+1).

Planning Information

Derbyshire County Council (DCC) is seeking feedback to assist in the preparation for a new Open Framework for the hire of Non-Operated Plant, Equipment and Vehicles. The proposed Open Framework is expected to commence towards the end of this year (2026). It will have an initial term of 12 months, with the option to extend for a further seven 12-month periods, up to a maximum duration of eight years (1+1+1+1+1+1+1+1). The Framework will be structured into sixteen Lots, each aligned to a specific plant/ machinery/ equipment type. The intention is to appoint multiple suppliers per Lot, ensuring resilience, flexibility, and consistent service delivery across Derbyshire. The intention will be for suppliers to be able to bid for any combination of Lots and are not required to submit bids for all Lots. The current proposed Lot structure is as follows: • Lot 1 - Materials Handlers • Lot 2 - Excavators • Lot 3 - Kerb and Slab Lifters • Lot 4 - Dumpers/Skip Loaders • Lot 5 - Rollers • Lot 6 - Pumps • Lot 7 - Rollers • Lot 8 - Breakers (Hydraulic, Petrol, Electric & Battery) • Lot 9 - Drilling and Fixing Equipment • Lot 10 - Saws/Cutters • Lot 11 - Concreting Equipment & Mixers • Lot 12 - Trench Support/Access Equipment • Lot 13 - Generators • Lot 14 - Temporary Site and Office Accommodation • Lot 15 - Temporary Traffic Lights • Lot 16 - Vehicles We are seeking any feedback potential suppliers may have on the current lot structure, including whether any additional detail should be requested and/ or any associated rates. Potential suppliers who are looking to provide feedback are asked to contact Courtney Howard - Procurement Officer (courtney.howard2@derbyshire.gov.uk) via email. We would also appreciate if potential bidders could advise which Lots, if any, they may intend to bid on when/ if the tender is published. Please note, any feedback provided will be treated as confidential. Participation in this process is entirely voluntary and non-binding. Responses will be used for information gathering only and will not form part of any future evaluation process. Suppliers are not to submit or return a completed Price Schedule with rates/ prices, any such submissions will be disregarded. This is a market engagement exercise only. It is not a formal invitation to tender, nor does it constitute an offer of contract

Publication & Lifecycle

Open Contracting ID
ocds-h6vhtk-04fe89
Publication Source
Find A Tender Service
Latest Notice
https://www.find-tender.service.gov.uk/Notice/083543-2026
Current Stage
Tender
All Stages
Planning, Tender

Procurement Classification

Notice Type
UK4 - Tender Notice
Procurement Type
Framework
Procurement Category
Goods
Procurement Method
Open
Procurement Method Details
Open procedure
Tender Suitability
SME
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

16 - Agricultural machinery

34 - Transport equipment and auxiliary products to transportation

43 - Machinery for mining, quarrying, construction equipment


CPV Codes

16000000 - Agricultural machinery

34100000 - Motor vehicles

43000000 - Machinery for mining, quarrying, construction equipment

Notice Value(s)

Tender Value
£7,000,000 £1M-£10M
Lots Value
£7,000,005 £1M-£10M
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
3 Sep 20262 weeks ago
Submission Deadline
29 Sep 20261 weeks to go
Future Notice Date
6 Jul 2026Expired
Award Date
Not specified
Contract Period
1 Dec 2026 - 30 Nov 2028 2-3 years
Recurrence
Not specified

Notice Status

Tender Status
Active
Lots Status
Active
Awards Status
Not Specified
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
Derbyshire County Council
Contact Name
Available with D3 Tenders Premium →
Contact Email
Available with D3 Tenders Premium →
Contact Phone
Available with D3 Tenders Premium →

Buyer Location

Locality
MATLOCK
Postcode
DE4 3AG
Postcode Area
Derby
Country
England

Major Region (ITL 1)
TLF East Midlands (England)
Basic Region (ITL 2)
TLF1 Derbyshire and Nottinghamshire
Small Region (ITL 3)
TLF13 South and West Derbyshire
Delivery Location
TLF1 Derbyshire and Nottinghamshire

Local Authority
Derbyshire Dales
Electoral Ward
Matlock West
Westminster Constituency
Derbyshire Dales

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

JSON Markdown

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

Loading OCDS record...