Notice Information
Notice Title
Framework Agreement for the Provision of Facilities Management Repair and Maintenance Services
Notice Description
North East Lincolnshire Council (the Authority) is seeking to establish a four (4) year framework for the provision of facilities management repair and maintenance services to assets owned and leased by the Authority throughout the borough. Assets include properties within leisure, corporate, commercial, industrial, education and residential sectors. The facilities management repair and maintenance services are being split into the following lots: Lot 1a - Asbestos Surveying and Analytical Works Lot 1b - Asbestos Emergency Reactive Works Lot 1c - Asbestos Removal Works Lot 1d - Asbestos Laboratory Services Lot 2a - Electrical Reactive and Planned Works Lot 2b - Electrical Statutory Planned Preventative Maintenance (PPM) Lot 3a - General Building Works Lot 3b - General Building Works - Flooring Lot 4 - Joinery and Carpentry Lot 5a - Mechanical Reactive and Planned Works Lot 5b - Mechanical Statutory Planned Preventative Maintenance (PPM)
Lot Information
Asbestos Surveying and Analytical Works
Suppliers shall be able to carry out various works with asbestos containing materials including: Sampling, Air Monitoring, Management Surveys, Reinspection Surveys, Refurbishment Surveys, Demolition Surveys
Renewal: one (1) optional extension of twelve (12) months.
Asbestos Emergency Reactive WorkSuppliers shall be able to carry out various works with asbestos containing materials including: Emergency Removals Emergency Sampling Emergency Analytical
Renewal: one (1) optional extension of twelve (12) months.
Asbestos Removal WorkSuppliers shall be able to carry out various works with asbestos containing materials including: Licenced Removal Non-Licenced Removal Notifiable Non-Licenced Removal Fly Tip Removal
Renewal: one (1) optional extension of twelve (12) months.
Laboratory ServicesSuppliers shall be able to carry out various works with asbestos containing materials including: Sampling Analysis
Renewal: one (1) optional extension of twelve (12) months.
Electrical Reactive and Planned WorksReactive and Planned works across the Authority's property portfolio in relation to all types of electrical works. As a minimum, the Supplier shall be capable of delivering the following if required by the Authority: Installation of new mains wiring including lighting and small power, including following mains upgrades and meter changes. Emergency Call Outs (24/7/365) to power outages and electrical issues. Lighting design and upgrades. Fault finding and emergency repairs. Making safe of electrical issues e.g. following vandalism at void sites, following flood damage. Emergency Lighting failures. Minor Works Electrical Installations including replacement of faulty sockets, switches, accessories, replacement of failed consumer units / distribution boards. Repair of door entry and intercom systems. Repairs to CCTV power supplies and associated electrical infrastructure. Earthing and bonding repairs. Planed replacement of electrical installations and equipment Supply and installation of sub-meters
Options: Lot 2a The Authority reserves the right, at any time during the Framework Period, to add, remove, transfer, acquire, dispose of, or otherwise amend the properties and assets included within the scope of this Framework to reflect changes in its portfolio, operational requirements, service delivery needs, funding arrangements, or organisational structure. The Supplier shall accommodate such changes and continue to provide the Services in respect of any amended portfolio. Any addition or removal of properties may result in an adjustment to the Framework value, which shall be calculated in accordance with the rates and pricing mechanism set out within the Framework. The addition or removal of properties shall not constitute grounds for termination of the Framework or give rise to any claim for compensation, loss of profit, or damages by the Supplier. The Authority will provide reasonable written notice of any proposed portfolio changes where practicable.
Renewal: one (1) optional extension of twelve (12) months.
Electrical Statutory Planned Preventative Maintenance (PPM)Portable Appliance Testing (PAT) - The Provision and Use of Work Equipment Regulations 1998 & ISBN 978-0-86341-833-4 Electrical - Fixed Electrical Installations - Electricity at Work Regulations 1989 and BS7671 18th Edition (BS7671:2018+A3:2024) including all amendments. Fan Convectors - installed to Approved Document F and Approved Document P of the Building Regulations Lighting Conductors - Completed by a competent person to BS 7430:2011 + A1:2015 in line with BS EN62305 Interceptor Alarm - British & European Standard BS EN 858-1, PPG3 & ISO 14001 Emergency Lighting - Electricity at Work Regulation 1989, Building Regulations Approved Documents, BS 5266-1:2025), BS EN 50172:2024, I.C.E.L 1008 and Regulatory Reform (Fire Safety Order 2005) Disabled Toilet Alarm - The Building Regulations to Approved Document M Part 12015 edition incorporating 2016 amendments and Approved Document M Part 2 2015 edition incorporating 2020 and 2024 amendments, BS 8300-2:2018 Design of Buildings Part 2 Ducting - Fire, Smoke & Volume Control Dampers - BS EN 12101-8 & BS 9999
Options: Lot 2b The Authority reserves the right, at any time during the Framework Period, to add, remove, transfer, acquire, dispose of, or otherwise amend the properties and assets included within the scope of this Framework to reflect changes in its portfolio, operational requirements, service delivery needs, funding arrangements, or organisational structure. The Supplier shall accommodate such changes and continue to provide the Services in respect of any amended portfolio. Any addition or removal of properties may result in an adjustment to the Framework value, which shall be calculated in accordance with the rates and pricing mechanism set out within the Framework. The addition or removal of properties shall not constitute grounds for termination of the Framework or give rise to any claim for compensation, loss of profit, or damages by the Supplier. The Authority will provide reasonable written notice of any proposed portfolio changes where practicable.
Renewal: one (1) optional extension of twelve (12) months.
General Building WorksThe scope of the services required to be delivered by the Supplier under this lot are detailed below: Concreting Plastering Rendering Brick work repairs
Renewal: one (1) optional extension of twelve (12) months.
General Building Work - FlooringSupply, installation and removal of flooring.
Renewal: one (1) optional extension of twelve (12) months.
Joinery and CarpentryGeneral carpentry and joinery including but not limited to the supply, installation, repair, removal and disposal of the following: - installing cabinetry - doors - gates - fencing - banisters
Renewal: one (1) optional extension of twelve (12) months.
Mechanical Reactive and Planned WorksReactive and Planned works across the Authority's property portfolio in relation to all types of Mechanical works. As a minimum, the Supplier shall be capable of delivering the following works under this Framework: Boiler breakdown repairs Heating system fault finding Pump repairs and replacement Radiator leaks and repairs Valve and actuator replacement Heating control system repairs Burst pipe repairs Water leaks and emergency isolation Blocked and damaged pipework Sanitaryware repairs and replacement Tap and shower repairs Hot water cylinder repairs Water heater repairs Drainage and waste pipe repairs Emergency gas leak investigations Gas pipework repairs Commercial and domestic boiler repairs Emergency isolation of gas supplies Ventilation plant breakdowns Extract fan replacement Air handling unit (AHU) repairs Controls and BMS-related repairs Kitchen extract system repairs Asset replacement programmes Plumbing Upgrades
Options: Lot 5a The Authority reserves the right, at any time during the Framework Period, to add, remove, transfer, acquire, dispose of, or otherwise amend the properties and assets included within the scope of this Framework to reflect changes in its portfolio, operational requirements, service delivery needs, funding arrangements, or organisational structure. The Supplier shall accommodate such changes and continue to provide the Services in respect of any amended portfolio. Any addition or removal of properties may result in an adjustment to the Framework value, which shall be calculated in accordance with the rates and pricing mechanism set out within the Framework. The addition or removal of properties shall not constitute grounds for termination of the Framework or give rise to any claim for compensation, loss of profit, or damages by the Supplier. The Authority will provide reasonable written notice of any proposed portfolio changes where practicable.
Renewal: one (1) optional extension of twelve (12) months.
Mechanical Statutory Planned Preventative Maintenance (PPM)Planned Preventative Maintenance (PPM) shall be delivered in accordance with this Specification. Reactive works are limited to fault rectification arising from unplanned failures and shall only be within scope where expressly instructed by the Authority. Improvements, lifecycle replacement, major renewals, project works and variations are excluded from scope unless separately instructed. Oil Boiler Servicing - OFTEC The Control of Pollution (Oil Storage) (England) Regulation 2001 Gas Boiler Servicing - Gas Safety (Installation and Use) Regulation 1998 including Gas Tightness Test- Gas Safety (Installation and Use) Regulation 1998 Gas Safety (Installation and Use) Regulation 1998 Catering Equipment - The Health and Safety at Work Act 1974, Provision and Use of Work Equipment Regulations 1998. Pressure Systems Safety Regulations 2000, Control of Substances Hazardous to Health Regulations 2002 and Electricity at Work Regulation 1989 Unvented Water Heaters Vented Hot Water Boilers Sump Pump - Building Regulations Approved Documents. Mechanical Ventilation Cold Water Storage
Options: Lot 5b The Authority reserves the right, at any time during the Framework Period, to add, remove, transfer, acquire, dispose of, or otherwise amend the properties and assets included within the scope of this Framework to reflect changes in its portfolio, operational requirements, service delivery needs, funding arrangements, or organisational structure. The Supplier shall accommodate such changes and continue to provide the Services in respect of any amended portfolio. Any addition or removal of properties may result in an adjustment to the Framework value, which shall be calculated in accordance with the rates and pricing mechanism set out within the Framework. The addition or removal of properties shall not constitute grounds for termination of the Framework or give rise to any claim for compensation, loss of profit, or damages by the Supplier. The Authority will provide reasonable written notice of any proposed portfolio changes where practicable.
Renewal: one (1) optional extension of twelve (12) months.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-069ded
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/106942-2026
- Current Stage
- Tender
- All Stages
- Planning, Tender
Procurement Classification
- Notice Type
- UK4 - Tender Notice
- Procurement Type
- Framework
- Procurement Category
- Services
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- SME, VCSE
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
50 - Repair and maintenance services
71 - Architectural, construction, engineering and inspection services
-
- CPV Codes
45233260 - Pedestrian ways construction work
45259000 - Repair and maintenance of plant
45262300 - Concrete work
45262520 - Bricklaying work
45262660 - Asbestos-removal work
45310000 - Electrical installation work
45330000 - Plumbing and sanitary works
45350000 - Mechanical installations
45410000 - Plastering work
45420000 - Joinery and carpentry installation work
45432100 - Floor laying and covering work
45432110 - Floor-laying work
45432111 - Laying work of flexible floor coverings
45443000 - Facade work
45453000 - Overhaul and refurbishment work
50531100 - Repair and maintenance services of boilers
50710000 - Repair and maintenance services of electrical and mechanical building installations
50711000 - Repair and maintenance services of electrical building installations
50720000 - Repair and maintenance services of central heating
71313410 - Risk or hazard assessment for construction
71315300 - Building surveying services
71315400 - Building-inspection services
71600000 - Technical testing, analysis and consultancy services
71620000 - Analysis services
71630000 - Technical inspection and testing services
71900000 - Laboratory services
90650000 - Asbestos removal services
Notice Value(s)
- Tender Value
- £8,805,241 £1M-£10M
- Lots Value
- £8,805,240 £1M-£10M
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 11 Nov 20265 days ago
- Submission Deadline
- 11 Jan 20272 months to go
- Future Notice Date
- 1 Jul 2026Expired
- Award Date
- Not specified
- Contract Period
- 12 Apr 2027 - 11 Apr 2030 3-4 years
- Recurrence
- 2030-11-01
Notice Status
- Tender Status
- Active
- Lots Status
- Active
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- North East Lincolnshire Council
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- GRIMSBY
- Postcode
- DN31 1HU
- Postcode Area
- Doncaster
- Country
- England
-
- Major Region (ITL 1)
- TLE Yorkshire and The Humber
- Basic Region (ITL 2)
- TLE1 East Yorkshire and Northern Lincolnshire
- Small Region (ITL 3)
- TLE13 North and North East Lincolnshire
- Delivery Location
- TLE13 North and North East Lincolnshire
-
- Local Authority
- North East Lincolnshire
- Electoral Ward
- West Marsh
- Westminster Constituency
- Great Grimsby and Cleethorpes
Further Information
Notice Documents
-
https://www.find-tender.service.gov.uk/Notice/106942-2026
11th November 2026 - Tender notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/046593-2026
20th May 2026 - Pipeline notice on Find a Tender -
https://yortender.eu-supply.com/login.asp?B=YORTENDER
All associated tender documents are available via YORtender - https://yortender.eusupply.com/login.asp?B=YORTENDER Click on the link, then click on current tender opportunities, then search using the reference number.
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.