Framework Agreement for the Provision of Facilities Management Repair and Maintenance Services

North East Lincolnshire Council

This public procurement record has 2 releases in its history.

Tender

11 Nov 2026 at 09:35

Planning

20 May 2026 at 16:06

Summary of the contracting process

North East Lincolnshire Borough Council is seeking facilities management repair and maintenance services for its owned and leased buildings across leisure, corporate, commercial, industrial, education and residential sectors throughout the borough. The work is divided into 11 specialist lots: asbestos surveys and analysis, emergency asbestos response, asbestos removal and laboratory testing; reactive and planned electrical work and statutory electrical maintenance; general building repairs and flooring; joinery and carpentry; and reactive and planned mechanical work and statutory mechanical maintenance. Services include inspections, sampling, repairs, installations, planned maintenance and emergency call-outs, depending on the lot. The range is intended for suppliers focused on one or more of these trades rather than a single provider delivering every service. Work is carried out across the council’s property portfolio in North East Lincolnshire.

The council invited tenders through an open procedure to establish a framework agreement. Bids were due by 11 January 2027 at 12:00 UTC; clarification questions were due by 21 December 2026 at 16:00 UTC. The framework is scheduled to run from 12 April 2027 to 11 April 2030, with one optional 12-month extension. Its estimated value is £8,805,241 excluding VAT (£10,566,289 including VAT). It is split into 11 lots, with up to five suppliers appointed to each, except statutory electrical and mechanical maintenance, which each have one place. Future work may be allocated by direct award or further competition, depending on the lot. Price carries 70% of the evaluation score across the lots; the remaining marks assess quality factors such as delivery, workforce, health and safety, quality assurance and social value.

The opportunity is suitable for SMEs, with distinct lots allowing specialist asbestos, laboratory, electrical, building, flooring, joinery and mechanical firms to pursue work matching their capability. Suppliers need the relevant trade workforce and capacity for the portfolio’s mix of planned maintenance, repairs and, where required, emergency response. Pass/fail participation checks include financial standing, specified employer’s and public liability insurance of £10 million each, and professional indemnity and product liability insurance of £5 million each. Technical requirements vary by lot: examples include asbestos and laboratory qualifications, electrical installation certification and qualified staff, or Gas Safe, OFTEC and mechanical engineering credentials. Several lots require recognised contractor health and safety accreditation, staff checks or waste-carrier licensing. Equivalent qualifications and accreditations may be accepted if supported by sufficient evidence. Tender evaluations place substantial emphasis on price, alongside service delivery, quality, safety, workforce management and social value.

How relevant is this notice?

Notice Information

Notice Title

Framework Agreement for the Provision of Facilities Management Repair and Maintenance Services

Notice Description

North East Lincolnshire Council (the Authority) is seeking to establish a four (4) year framework for the provision of facilities management repair and maintenance services to assets owned and leased by the Authority throughout the borough. Assets include properties within leisure, corporate, commercial, industrial, education and residential sectors. The facilities management repair and maintenance services are being split into the following lots: Lot 1a - Asbestos Surveying and Analytical Works Lot 1b - Asbestos Emergency Reactive Works Lot 1c - Asbestos Removal Works Lot 1d - Asbestos Laboratory Services Lot 2a - Electrical Reactive and Planned Works Lot 2b - Electrical Statutory Planned Preventative Maintenance (PPM) Lot 3a - General Building Works Lot 3b - General Building Works - Flooring Lot 4 - Joinery and Carpentry Lot 5a - Mechanical Reactive and Planned Works Lot 5b - Mechanical Statutory Planned Preventative Maintenance (PPM)

Lot Information

Asbestos Surveying and Analytical Works

Suppliers shall be able to carry out various works with asbestos containing materials including: Sampling, Air Monitoring, Management Surveys, Reinspection Surveys, Refurbishment Surveys, Demolition Surveys

Renewal: one (1) optional extension of twelve (12) months.

Asbestos Emergency Reactive Work

Suppliers shall be able to carry out various works with asbestos containing materials including: Emergency Removals Emergency Sampling Emergency Analytical

Renewal: one (1) optional extension of twelve (12) months.

Asbestos Removal Work

Suppliers shall be able to carry out various works with asbestos containing materials including: Licenced Removal Non-Licenced Removal Notifiable Non-Licenced Removal Fly Tip Removal

Renewal: one (1) optional extension of twelve (12) months.

Laboratory Services

Suppliers shall be able to carry out various works with asbestos containing materials including: Sampling Analysis

Renewal: one (1) optional extension of twelve (12) months.

Electrical Reactive and Planned Works

Reactive and Planned works across the Authority's property portfolio in relation to all types of electrical works. As a minimum, the Supplier shall be capable of delivering the following if required by the Authority: Installation of new mains wiring including lighting and small power, including following mains upgrades and meter changes. Emergency Call Outs (24/7/365) to power outages and electrical issues. Lighting design and upgrades. Fault finding and emergency repairs. Making safe of electrical issues e.g. following vandalism at void sites, following flood damage. Emergency Lighting failures. Minor Works Electrical Installations including replacement of faulty sockets, switches, accessories, replacement of failed consumer units / distribution boards. Repair of door entry and intercom systems. Repairs to CCTV power supplies and associated electrical infrastructure. Earthing and bonding repairs. Planed replacement of electrical installations and equipment Supply and installation of sub-meters

Options: Lot 2a The Authority reserves the right, at any time during the Framework Period, to add, remove, transfer, acquire, dispose of, or otherwise amend the properties and assets included within the scope of this Framework to reflect changes in its portfolio, operational requirements, service delivery needs, funding arrangements, or organisational structure. The Supplier shall accommodate such changes and continue to provide the Services in respect of any amended portfolio. Any addition or removal of properties may result in an adjustment to the Framework value, which shall be calculated in accordance with the rates and pricing mechanism set out within the Framework. The addition or removal of properties shall not constitute grounds for termination of the Framework or give rise to any claim for compensation, loss of profit, or damages by the Supplier. The Authority will provide reasonable written notice of any proposed portfolio changes where practicable.

Renewal: one (1) optional extension of twelve (12) months.

Electrical Statutory Planned Preventative Maintenance (PPM)

Portable Appliance Testing (PAT) - The Provision and Use of Work Equipment Regulations 1998 & ISBN 978-0-86341-833-4 Electrical - Fixed Electrical Installations - Electricity at Work Regulations 1989 and BS7671 18th Edition (BS7671:2018+A3:2024) including all amendments. Fan Convectors - installed to Approved Document F and Approved Document P of the Building Regulations Lighting Conductors - Completed by a competent person to BS 7430:2011 + A1:2015 in line with BS EN62305 Interceptor Alarm - British & European Standard BS EN 858-1, PPG3 & ISO 14001 Emergency Lighting - Electricity at Work Regulation 1989, Building Regulations Approved Documents, BS 5266-1:2025), BS EN 50172:2024, I.C.E.L 1008 and Regulatory Reform (Fire Safety Order 2005) Disabled Toilet Alarm - The Building Regulations to Approved Document M Part 12015 edition incorporating 2016 amendments and Approved Document M Part 2 2015 edition incorporating 2020 and 2024 amendments, BS 8300-2:2018 Design of Buildings Part 2 Ducting - Fire, Smoke & Volume Control Dampers - BS EN 12101-8 & BS 9999

Options: Lot 2b The Authority reserves the right, at any time during the Framework Period, to add, remove, transfer, acquire, dispose of, or otherwise amend the properties and assets included within the scope of this Framework to reflect changes in its portfolio, operational requirements, service delivery needs, funding arrangements, or organisational structure. The Supplier shall accommodate such changes and continue to provide the Services in respect of any amended portfolio. Any addition or removal of properties may result in an adjustment to the Framework value, which shall be calculated in accordance with the rates and pricing mechanism set out within the Framework. The addition or removal of properties shall not constitute grounds for termination of the Framework or give rise to any claim for compensation, loss of profit, or damages by the Supplier. The Authority will provide reasonable written notice of any proposed portfolio changes where practicable.

Renewal: one (1) optional extension of twelve (12) months.

General Building Works

The scope of the services required to be delivered by the Supplier under this lot are detailed below: Concreting Plastering Rendering Brick work repairs

Renewal: one (1) optional extension of twelve (12) months.

General Building Work - Flooring

Supply, installation and removal of flooring.

Renewal: one (1) optional extension of twelve (12) months.

Joinery and Carpentry

General carpentry and joinery including but not limited to the supply, installation, repair, removal and disposal of the following: - installing cabinetry - doors - gates - fencing - banisters

Renewal: one (1) optional extension of twelve (12) months.

Mechanical Reactive and Planned Works

Reactive and Planned works across the Authority's property portfolio in relation to all types of Mechanical works. As a minimum, the Supplier shall be capable of delivering the following works under this Framework: Boiler breakdown repairs Heating system fault finding Pump repairs and replacement Radiator leaks and repairs Valve and actuator replacement Heating control system repairs Burst pipe repairs Water leaks and emergency isolation Blocked and damaged pipework Sanitaryware repairs and replacement Tap and shower repairs Hot water cylinder repairs Water heater repairs Drainage and waste pipe repairs Emergency gas leak investigations Gas pipework repairs Commercial and domestic boiler repairs Emergency isolation of gas supplies Ventilation plant breakdowns Extract fan replacement Air handling unit (AHU) repairs Controls and BMS-related repairs Kitchen extract system repairs Asset replacement programmes Plumbing Upgrades

Options: Lot 5a The Authority reserves the right, at any time during the Framework Period, to add, remove, transfer, acquire, dispose of, or otherwise amend the properties and assets included within the scope of this Framework to reflect changes in its portfolio, operational requirements, service delivery needs, funding arrangements, or organisational structure. The Supplier shall accommodate such changes and continue to provide the Services in respect of any amended portfolio. Any addition or removal of properties may result in an adjustment to the Framework value, which shall be calculated in accordance with the rates and pricing mechanism set out within the Framework. The addition or removal of properties shall not constitute grounds for termination of the Framework or give rise to any claim for compensation, loss of profit, or damages by the Supplier. The Authority will provide reasonable written notice of any proposed portfolio changes where practicable.

Renewal: one (1) optional extension of twelve (12) months.

Mechanical Statutory Planned Preventative Maintenance (PPM)

Planned Preventative Maintenance (PPM) shall be delivered in accordance with this Specification. Reactive works are limited to fault rectification arising from unplanned failures and shall only be within scope where expressly instructed by the Authority. Improvements, lifecycle replacement, major renewals, project works and variations are excluded from scope unless separately instructed. Oil Boiler Servicing - OFTEC The Control of Pollution (Oil Storage) (England) Regulation 2001 Gas Boiler Servicing - Gas Safety (Installation and Use) Regulation 1998 including Gas Tightness Test- Gas Safety (Installation and Use) Regulation 1998 Gas Safety (Installation and Use) Regulation 1998 Catering Equipment - The Health and Safety at Work Act 1974, Provision and Use of Work Equipment Regulations 1998. Pressure Systems Safety Regulations 2000, Control of Substances Hazardous to Health Regulations 2002 and Electricity at Work Regulation 1989 Unvented Water Heaters Vented Hot Water Boilers Sump Pump - Building Regulations Approved Documents. Mechanical Ventilation Cold Water Storage

Options: Lot 5b The Authority reserves the right, at any time during the Framework Period, to add, remove, transfer, acquire, dispose of, or otherwise amend the properties and assets included within the scope of this Framework to reflect changes in its portfolio, operational requirements, service delivery needs, funding arrangements, or organisational structure. The Supplier shall accommodate such changes and continue to provide the Services in respect of any amended portfolio. Any addition or removal of properties may result in an adjustment to the Framework value, which shall be calculated in accordance with the rates and pricing mechanism set out within the Framework. The addition or removal of properties shall not constitute grounds for termination of the Framework or give rise to any claim for compensation, loss of profit, or damages by the Supplier. The Authority will provide reasonable written notice of any proposed portfolio changes where practicable.

Renewal: one (1) optional extension of twelve (12) months.

Notice Details

Publication & Lifecycle

Open Contracting ID
ocds-h6vhtk-069ded
Publication Source
Find A Tender Service
Latest Notice
https://www.find-tender.service.gov.uk/Notice/106942-2026
Current Stage
Tender
All Stages
Planning, Tender

Procurement Classification

Notice Type
UK4 - Tender Notice
Procurement Type
Framework
Procurement Category
Services
Procurement Method
Open
Procurement Method Details
Open procedure
Tender Suitability
SME, VCSE
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

45 - Construction work

50 - Repair and maintenance services

71 - Architectural, construction, engineering and inspection services

90 - Sewage, refuse, cleaning and environmental services


CPV Codes

45233260 - Pedestrian ways construction work

45259000 - Repair and maintenance of plant

45262300 - Concrete work

45262520 - Bricklaying work

45262660 - Asbestos-removal work

45310000 - Electrical installation work

45330000 - Plumbing and sanitary works

45350000 - Mechanical installations

45410000 - Plastering work

45420000 - Joinery and carpentry installation work

45432100 - Floor laying and covering work

45432110 - Floor-laying work

45432111 - Laying work of flexible floor coverings

45443000 - Facade work

45453000 - Overhaul and refurbishment work

50531100 - Repair and maintenance services of boilers

50710000 - Repair and maintenance services of electrical and mechanical building installations

50711000 - Repair and maintenance services of electrical building installations

50720000 - Repair and maintenance services of central heating

71313410 - Risk or hazard assessment for construction

71315300 - Building surveying services

71315400 - Building-inspection services

71600000 - Technical testing, analysis and consultancy services

71620000 - Analysis services

71630000 - Technical inspection and testing services

71900000 - Laboratory services

90650000 - Asbestos removal services

Notice Value(s)

Tender Value
£8,805,241 £1M-£10M
Lots Value
£8,805,240 £1M-£10M
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
11 Nov 20265 days ago
Submission Deadline
11 Jan 20272 months to go
Future Notice Date
1 Jul 2026Expired
Award Date
Not specified
Contract Period
12 Apr 2027 - 11 Apr 2030 3-4 years
Recurrence
2030-11-01

Notice Status

Tender Status
Active
Lots Status
Active
Awards Status
Not Specified
Contracts Status
Not Specified

Buyer & Supplier

Contracting Authority (Buyer)

Main Buyer
North East Lincolnshire Council
Contact Name
Available with D3 Tenders Premium →
Contact Email
Available with D3 Tenders Premium →
Contact Phone
Available with D3 Tenders Premium →

Buyer Location

Locality
GRIMSBY
Postcode
DN31 1HU
Postcode Area
Doncaster
Country
England

Major Region (ITL 1)
TLE Yorkshire and The Humber
Basic Region (ITL 2)
TLE1 East Yorkshire and Northern Lincolnshire
Small Region (ITL 3)
TLE13 North and North East Lincolnshire
Delivery Location
TLE13 North and North East Lincolnshire

Local Authority
North East Lincolnshire
Electoral Ward
West Marsh
Westminster Constituency
Great Grimsby and Cleethorpes

Further Information

Notice Documents

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

JSON Markdown

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

Loading OCDS record...