Notice Information
Notice Title
Design & Construction Framework
Notice Description
Northern Trains Limited is a Train Operating Company (TOC) that operates passenger rail services in the North of England. Northern Trains Limited is publishing this notice on behalf of itself and a number of 'Participating Authorities' including Train Operating Companies in Great Britain (see Section VI.3 below) to establish a framework for Design services, Design & Construction Works, and Construction Works to support the delivery of infrastructure, asset enhancement, refurbishment, renewal and construction projects across its network of stations, depots, train care centres and other operational property assets. The framework will enable Northern Trains Limited and the Participating Authorities to run mini-competitions for Design Services, Design & Construction Works, and Construction Works and directly award call-off contracts for their requirements among suppliers appointed to the framework. The Framework allows all Participating Authorities to use it, however, it has been developed primarily to serve the needs of the operators in the North of England, taking advantage of geographical synergies. Accordingly, its principal intended users are Northern Trains Limited (NTL), TransPennine Express (TPE) and London North Eastern Railway (LNER). The objective of this procurement is to establish a multi-lot framework that will provide access to suitably qualified and experienced suppliers capable of delivering a range of design, construction and multidisciplinary project services. The framework comprises the following lots: * Lot 1: Internal Building Fit Outs * Lot 2: General Building and Civils * Lot 3: Minor Works and Reactive Projects * Lot 4: Multi-discipline Railway Solutions and Integrated Major Projects <= PS1 million * Lot 5: Multi-discipline Railway Solutions and Integrated Major Projects > PS1 million * Lot 6: Information and Security Systems Upgrades and Enhancements (SISS) * Lot 7: Accessible Stations Enhancements The framework will support the delivery of projects ranging from feasibility and design development through to construction, installation, commissioning and handover. Services may include surveys, design activities, refurbishment works, asset renewals, building works, civil engineering, mechanical and electrical works, information and security systems, accessibility improvements and integrated multidisciplinary project delivery. The scope of services will be delivered with the aim of meeting operational, performance and customer requirements whilst ensuring compliance with all applicable legislation, industry standards and railway-specific requirements. Suppliers will be expected to apply industry best practice, innovation and their technical expertise to achieve the following key objectives: * Deliver safe, high-quality and value-for-money design and construction solutions. * Support the enhancement, renewal and maintenance of NTL's operational estate and infrastructure assets. * Minimise disruption to passengers, train operations and depot activities during project delivery. * Ensure compliance with all relevant statutory, regulatory and rail industry requirements. * Promote sustainability, accessibility and social value outcomes across the framework. * Foster collaborative working and continuous improvement throughout the lifecycle of projects. The nature of the arrangement is that Design Services, Design & Construction Works or Construction Works will be supplied under an NTL Framework Agreement and call offs will be using the full suite of JCT agreements, NEC4 agreements and other bespoke agreements, further detail can be found in tender documents. These requirements will be subject to competitive tendering among the members of the framework in accordance with the rules of the competitive flexible procedure as required by, and subject to, regulation sections 45 and 46 of the Procurement Act 2023. Specific contracts will be awarded according to those rules by the Northern Trains Limited or Participating Authorities in accordance with their specific requirements as set out in individual procurements under the framework. Suppliers appointed to the framework will be required to enter into a Framework Agreement setting out the terms on which the framework will operate including the standard terms and conditions that will be applicable to individual call-off contracts under the framework. Northern Trains Limited is procuring on behalf of the Participating Authorities (as more particularly defined below) and will enter into the relevant framework agreement with the successful suppliers where such contracts are awarded. The Participating Authorities (as more particularly defined below) are permitted to use the framework via subsequent call-offs in accordance with section 1(3)(b) of the Procurement Act 2023. However, Northern Trains Limited is responsible for the conduct of the procurement throughout and all correspondence and communication from suppliers is to be solely with Northern Trains Limited. Participating Authorities: In addition to Northern Trains limited, the Participating Authorities who may call-off under this framework are: * the Train Operating Companies * Network Rail Infrastructure Limited * Any holders of a passenger licence or a station licence granted pursuant to section 8 of the Railways Act 1993 and/or a passenger licence granted pursuant to regulation 6 of the Railway (Licensing of Railway Undertakings) Regulations 2005 Novation or Assignment The framework agreement may be novated or assigned by Northern Trains Limited to Train Operating Companies, or to DFT Operator Limited (company number: 07141122) or any successor parent company to a Train Operating Company, following a corporate restructuring or similar circumstance. Other Information Northern Trains Limited expressly reserves the right: i. not to award any suppliers the contract referred to in this notice; and ii. in no circumstances will the customer be liable for any costs incurred by the suppliers. For more information about this opportunity, please visit the DELTA E-portal at: https://www.delta-esourcing.com/respond/C2E8C9V96C To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/C2E8C9V96C
Lot Information
Lot 1 Internal Building Fit Outs
Covering facility fit-outs, welfare and office accommodation, stores and spares facilities, waste management facilities, and security and fire systems. This lot allows participation from both rail and non-rail suppliers where appropriate, encouraging innovation and competition through the adoption of best practice approaches from wider industry sectors.
Renewal: The Framework will be let for an initial term of five (5) years. Following the expiry of the initial term, NTL may, at its sole discretion, exercise one (1) extension option of three (3) years, giving a potential maximum Framework duration of eight (8) years. The exercise of any extension option will be subject to NTL's ongoing assessment of the Framework's performance and continued requirement. Extensions may be considered where: - All suppliers performance across the relevant lots awarded call-off contracts have consistently met or exceeded the required performance indicators, including quality of workmanship, safety performance, programme delivery, and compliance with reporting obligations. -Operational continuity is advantageous, particularly where suppliers have developed site-specific knowledge, established mobilisation capability, or are delivering ongoing works packages across the network. - Value for money can be demonstrated, including through benchmarking, market testing, or commercial review confirming that rates and delivery remain competitive and deliver best value. - Regulatory and contractual compliance is maintained, including adherence to all relevant rail, safety, environmental, and industry standards applicable to platform lining and station painting activities. - Business need remains unchanged, with a continued requirement for Design & Construction works in line with the scope set out in the Specification for each lot. Where the extension option is exercised, the Framework duration will be structured as follows: Initial Term: 5 years Extension Option: 3 years Maximum Framework Duration: 8 years total
Lot 2- Access and Component Movement SolutionsCovering equipment used to provide safe access to rolling stock and facilitate the lifting, removal, transportation and installation of vehicle components during maintenance and overhaul activities. This includes access platforms, lifting systems, jacks, overhead cranes, hoists, bogie drops, component handling equipment and inspection pits.
Renewal: The Framework will be let for an initial term of five (5) years. Following the expiry of the initial term, NTL may, at its sole discretion, exercise one (1) extension option of three (3) years, giving a potential maximum Framework duration of eight (8) years. The exercise of any extension option will be subject to NTL's ongoing assessment of the Framework's performance and continued requirement. Extensions may be considered where: - All suppliers performance across the relevant lots awarded call-off contracts have consistently met or exceeded the required performance indicators, including quality of workmanship, safety performance, programme delivery, and compliance with reporting obligations. -Operational continuity is advantageous, particularly where suppliers have developed site-specific knowledge, established mobilisation capability, or are delivering ongoing works packages across the network. - Value for money can be demonstrated, including through benchmarking, market testing, or commercial review confirming that rates and delivery remain competitive and deliver best value. - Regulatory and contractual compliance is maintained, including adherence to all relevant rail, safety, environmental, and industry standards applicable to platform lining and station painting activities. - Business need remains unchanged, with a continued requirement for Design & Construction works in line with the scope set out in the Specification for each lot. Where the extension option is exercised, the Framework duration will be structured as follows: Initial Term: 5 years Extension Option: 3 years Maximum Framework Duration: 8 years total
Lot 3- Design & Build Specialist Train Servicing and Maintenance SolutionsCovering the design, installation and integration of specialist depot servicing infrastructure required to support the operation, cleaning, refuelling and maintenance of rolling stock. This includes CET systems, fuelling installations, sanding facilities, AdBlue and fluid management systems, train wash systems, cleaning infrastructure, specialist depot plant and associated servicing equipment.
Renewal: The Framework will be let for an initial term of five (5) years. Following the expiry of the initial term, NTL may, at its sole discretion, exercise one (1) extension option of three (3) years, giving a potential maximum Framework duration of eight (8) years. The exercise of any extension option will be subject to NTL's ongoing assessment of the Framework's performance and continued requirement. Extensions may be considered where: - All suppliers performance across the relevant lots awarded call-off contracts have consistently met or exceeded the required performance indicators, including quality of workmanship, safety performance, programme delivery, and compliance with reporting obligations. -Operational continuity is advantageous, particularly where suppliers have developed site-specific knowledge, established mobilisation capability, or are delivering ongoing works packages across the network. - Value for money can be demonstrated, including through benchmarking, market testing, or commercial review confirming that rates and delivery remain competitive and deliver best value. - Regulatory and contractual compliance is maintained, including adherence to all relevant rail, safety, environmental, and industry standards applicable to platform lining and station painting activities. - Business need remains unchanged, with a continued requirement for Design & Construction works in line with the scope set out in the Specification for each lot. Where the extension option is exercised, the Framework duration will be structured as follows: Initial Term: 5 years Extension Option: 3 years Maximum Framework Duration: 8 years total
Lot 4- Multi-discipline Railway Solutions and Integrated Major Projects <= PS1mRestricted to Small and Medium Enterprises (SMEs) to support market engagement, encourage competition and deliver social value through the development of regional supply chains. Covering complex railway infrastructure projects and multi-disciplinary construction activities including civils and buildings, track, electrification, signalling, telecoms, power, mechanical and electrical installations, high-voltage systems, drainage, geotechnical works, highways, walkways, and environmental and energy-related projects. To align with Network Rail's Contract Requirements and Technical Asset Categories, works relating to buildings and civil engineering are grouped in accordance with the Buildings & Civils discipline. This includes Structures and Civil Engineering; Buildings, Building Services and Station Works; and Architecture. Adopting this approach provides consistency with established railway industry standards and assurance processes, allowing requirements to be more readily traced through Network Rail governance, including ASPRO and Landlord Consent (LLC) approvals where applicable.
Renewal: The Framework will be let for an initial term of five (5) years. Following the expiry of the initial term, NTL may, at its sole discretion, exercise one (1) extension option of three (3) years, giving a potential maximum Framework duration of eight (8) years. The exercise of any extension option will be subject to NTL's ongoing assessment of the Framework's performance and continued requirement. Extensions may be considered where: - All suppliers performance across the relevant lots awarded call-off contracts have consistently met or exceeded the required performance indicators, including quality of workmanship, safety performance, programme delivery, and compliance with reporting obligations. -Operational continuity is advantageous, particularly where suppliers have developed site-specific knowledge, established mobilisation capability, or are delivering ongoing works packages across the network. - Value for money can be demonstrated, including through benchmarking, market testing, or commercial review confirming that rates and delivery remain competitive and deliver best value. - Regulatory and contractual compliance is maintained, including adherence to all relevant rail, safety, environmental, and industry standards applicable to platform lining and station painting activities. - Business need remains unchanged, with a continued requirement for Design & Construction works in line with the scope set out in the Specification for each lot. Where the extension option is exercised, the Framework duration will be structured as follows: Initial Term: 5 years Extension Option: 3 years Maximum Framework Duration: 8 years total
Lot 5- Multi-discipline Railway Solutions and Integrated Major Projects > PS1mOpen to all suppliers and intended for larger, higher-risk and more complex projects requiring significant resource, governance and project delivery capability. Covering complex railway infrastructure projects and multi-disciplinary construction activities including civils and buildings, track, electrification, signalling, telecoms, power, mechanical and electrical installations, high-voltage systems, drainage, geotechnical works, highways, walkways, and environmental and energy-related projects.
Renewal: The Framework will be let for an initial term of five (5) years. Following the expiry of the initial term, NTL may, at its sole discretion, exercise one (1) extension option of three (3) years, giving a potential maximum Framework duration of eight (8) years. The exercise of any extension option will be subject to NTL's ongoing assessment of the Framework's performance and continued requirement. Extensions may be considered where: - All suppliers performance across the relevant lots awarded call-off contracts have consistently met or exceeded the required performance indicators, including quality of workmanship, safety performance, programme delivery, and compliance with reporting obligations. -Operational continuity is advantageous, particularly where suppliers have developed site-specific knowledge, established mobilisation capability, or are delivering ongoing works packages across the network. - Value for money can be demonstrated, including through benchmarking, market testing, or commercial review confirming that rates and delivery remain competitive and deliver best value. - Regulatory and contractual compliance is maintained, including adherence to all relevant rail, safety, environmental, and industry standards applicable to platform lining and station painting activities. - Business need remains unchanged, with a continued requirement for Design & Construction works in line with the scope set out in the Specification for each lot. Where the extension option is exercised, the Framework duration will be structured as follows: Initial Term: 5 years Extension Option: 3 years Maximum Framework Duration: 8 years total
Lot 6- Information and Security Systems Upgrades and Enhancements (SISS)Covering upgrades and enhancements to station and depot information and security systems, including Customer Information Systems (CIS), Long Line Public Address (LLPA), Public Help Points (PHP), CCTV, and associated IT and telecommunications infrastructure.
Renewal: The Framework will be let for an initial term of five (5) years. Following the expiry of the initial term, NTL may, at its sole discretion, exercise one (1) extension option of three (3) years, giving a potential maximum Framework duration of eight (8) years. The exercise of any extension option will be subject to NTL's ongoing assessment of the Framework's performance and continued requirement. Extensions may be considered where: - All suppliers performance across the relevant lots awarded call-off contracts have consistently met or exceeded the required performance indicators, including quality of workmanship, safety performance, programme delivery, and compliance with reporting obligations. -Operational continuity is advantageous, particularly where suppliers have developed site-specific knowledge, established mobilisation capability, or are delivering ongoing works packages across the network. - Value for money can be demonstrated, including through benchmarking, market testing, or commercial review confirming that rates and delivery remain competitive and deliver best value. - Regulatory and contractual compliance is maintained, including adherence to all relevant rail, safety, environmental, and industry standards applicable to platform lining and station painting activities. - Business need remains unchanged, with a continued requirement for Design & Construction works in line with the scope set out in the Specification for each lot. Where the extension option is exercised, the Framework duration will be structured as follows: Initial Term: 5 years Extension Option: 3 years Maximum Framework Duration: 8 years total
Lot 7- Accessible Stations EnhancementsCovering accessibility improvements and upgrades to stations, including step-free access, movement routes, wayfinding, customer information systems, help points, and other interventions designed to improve accessibility and passenger independence.
Renewal: The Framework will be let for an initial term of five (5) years. Following the expiry of the initial term, NTL may, at its sole discretion, exercise one (1) extension option of three (3) years, giving a potential maximum Framework duration of eight (8) years. The exercise of any extension option will be subject to NTL's ongoing assessment of the Framework's performance and continued requirement. Extensions may be considered where: - All suppliers performance across the relevant lots awarded call-off contracts have consistently met or exceeded the required performance indicators, including quality of workmanship, safety performance, programme delivery, and compliance with reporting obligations. -Operational continuity is advantageous, particularly where suppliers have developed site-specific knowledge, established mobilisation capability, or are delivering ongoing works packages across the network. - Value for money can be demonstrated, including through benchmarking, market testing, or commercial review confirming that rates and delivery remain competitive and deliver best value. - Regulatory and contractual compliance is maintained, including adherence to all relevant rail, safety, environmental, and industry standards applicable to platform lining and station painting activities. - Business need remains unchanged, with a continued requirement for Design & Construction works in line with the scope set out in the Specification for each lot. Where the extension option is exercised, the Framework duration will be structured as follows: Initial Term: 5 years Extension Option: 3 years Maximum Framework Duration: 8 years total
Planning Information
Northern Trains Limited ("NTL") is seeking to undertake early market engagement with suitably qualified and experienced Suppliers in advance of a forthcoming procurement to establish a Train Care Centre & Stations Construction Framework. The proposed Framework will support the delivery of a programme of works across NTL's Train Care Cantres & Stations, including (but not limited to) civil, structural, mechanical, electrical, and associated infrastructure upgrades required to facilitate current operations and the introduction of new rolling stock. NTL invites interested Suppliers to attend a virtual Pre-Market Engagement session, which will be held on: 14th July 2026 at 10:00am via Microsoft Teams The session will include a presentation delivered by the Project and Procurement Teams, outlining the strategic objectives of the Framework, the anticipated scope of works, and the proposed procurement approach. The session will provide insight into the following areas: -Overview of the Train Care Centres & Stations Construction Framework and programme objectives -Scope of works and technical requirements across the Train Care Centres & Stations -Anticipated lotting structure and delivery model (where applicable) -Procurement route, timelines, and key milestones NTL is also seeking feedback from the market to help inform the development of the procurement strategy, including: -Proposed contracting model (e.g. framework structure, call-off -mechanisms) -Packaging and subcontracting opportunities -Pricing approaches and cost management mechanisms -Commercial terms and risk allocation Following the engagement session, participating Suppliers will be invited to complete a short questionnaire to capture feedback on the proposed approach. NTL may also invite Suppliers to participate in one-to-one follow-up meetings, which are expected to take place shortly after the session. These meetings will provide an opportunity to explore feedback in greater detail, including views on constructability, delivery risks, and optimal commercial arrangements. Selection for these sessions will be at NTL's sole discretion. This pre-market engagement is being undertaken to inform NTL's approach and does not constitute a commitment to commence a procurement process. To express interest in attending the Pre-Market Engagement session, please email: - Amber Darby-Lunn (Amber.darby-lunn@northernrailway.co.uk) and - Daniel Yates (Daniel.Yates1@northernrailway.co.uk) Please include your organisation's name, contact details and the name of attendees. A calendar invitation with joining details will follow. Suppliers should note that there is no obligation to take part in this preliminary market engagement exercise and that if they do not take part, it will not preclude them from the subsequent related procurement process. Engaging Suppliers will not receive preferential treatment in any procurement tender process, and this is in no way an indication of the selection of any organisation or a guarantee of future work.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-06c2a4
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/107970-2026
- Current Stage
- Tender
- All Stages
- Planning, Tender
Procurement Classification
- Notice Type
- UK4 - Tender Notice
- Procurement Type
- Framework
- Procurement Category
- Works
- Procurement Method
- Selective
- Procurement Method Details
- Competitive flexible procedure
- Tender Suitability
- SME
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
22 - Printed matter and related products
51 - Installation services (except software)
71 - Architectural, construction, engineering and inspection services
-
- CPV Codes
22314000 - Designs
45000000 - Construction work
51100000 - Installation services of electrical and mechanical equipment
71300000 - Engineering services
Notice Value(s)
- Tender Value
- £306,500,000 £100M-£1B
- Lots Value
- £306,500,000 £100M-£1B
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 13 Nov 20261 weeks ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- Not specified
- Contract Period
- 27 May 2027 - 26 May 2032 Over 5 years
- Recurrence
- Not specified
Notice Status
- Tender Status
- Active
- Lots Status
- Active
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- Northern Trains Limited
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- YORK
- Postcode
- YO1 6JT
- Postcode Area
- York
- Country
- England
-
- Major Region (ITL 1)
- TLE Yorkshire and The Humber
- Basic Region (ITL 2)
- TLE2 North Yorkshire
- Small Region (ITL 3)
- TLE21 York
- Delivery Location
- Not specified
-
- Local Authority
- York
- Electoral Ward
- Micklegate
- Westminster Constituency
- York Central
Further Information
Notice Documents
-
https://www.find-tender.service.gov.uk/Notice/107970-2026
13th November 2026 - Tender notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/062552-2026
3rd July 2026 - Preliminary market engagement notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/062387-2026
2nd July 2026 - Preliminary market engagement notice on Find a Tender
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.