Notice Information
Notice Title
TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification
Notice Description
The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works. Programme constraints dictate that a supplier be appointed to undertake the works prior to completion of detailed design. The supplier shall be appointed on a design and build basis. The supplier shall be furnished with available outline designs, which they shall adopt and provide design liability for and, subsequently undertake the detailed design and installation. The qualitative and commercial elements of this procurement event therefore seek to ensure TfW appoint a supplier who will deliver the works in a collaborative and cost-efficient manner. The overarching deliverables for the works are: - Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites. - Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations. - Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint. - Procurement of materials required for construction of OLE system. - Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section. The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works: - Final Registration of Queen Street North route section by 23/10/2023 - Final Registration of Bay route section by 15/06/2023 - Final Registration of Rhymney route section by 01/05/24 Specific OLE deliverables include, but are not limited to the design and construction of: - Foundation Installation - Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles. - Mast Installation - single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts. - Booms. - Ties, struts and small part steel including tensioning system etc - Switching including platforms as required - Wiring. - Final registration.
Lot Information
Lot 1
Design and installation of Overhead Line Equipment for the electrification of rail lines in Wales.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-kuma6s-122940
- Publication Source
- Sell2Wales
- Latest Notice
- https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=122940
- Current Stage
- Planning
- All Stages
- Planning
Procurement Classification
- Notice Type
- OJEU - F1 - Prior Information Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45234100 - Railway construction works
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 13 Jul 20223 years ago
- Submission Deadline
- 5 Sep 2022Expired
- Future Notice Date
- 18 Aug 2022Expired
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Planned
- Lots Status
- Planned
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- TRANSPORT FOR WALES
- Contact Name
- Not specified
- Contact Email
- procurement@tfw.wales
- Contact Phone
- +44 2921673434
Buyer Location
- Locality
- PONTYPRIDD
- Postcode
- CF37 4TH
- Post Town
- Cardiff
- Country
- Wales
-
- Major Region (ITL 1)
- TLL Wales
- Basic Region (ITL 2)
- TLL5 South East Wales
- Small Region (ITL 3)
- TLL51 Central Valleys and Bridgend
- Delivery Location
- TLL Wales
-
- Local Authority
- Rhondda Cynon Taf
- Electoral Ward
- Pontypridd Town
- Westminster Constituency
- Pontypridd
Further Information
Notice Documents
-
https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=JUL404777&idx=4
3rd August 2022 - Design -
https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=JUL404777&idx=3
3rd August 2022 - Designs -
https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=JUL404777&idx=2
3rd August 2022 - Design Doc Register -
https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=JUL404777&idx=1
15th July 2022 - Blank Document. No action required. -
https://www.sell2wales.gov.wales/search/show/search_view.aspx?ID=JUL404777
TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification - The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works. Programme constraints dictate that a supplier be appointed to undertake the works prior to completion of detailed design. The supplier shall be appointed on a design and build basis. The supplier shall be furnished with available outline designs, which they shall adopt and provide design liability for and, subsequently undertake the detailed design and installation. The qualitative and commercial elements of this procurement event therefore seek to ensure TfW appoint a supplier who will deliver the works in a collaborative and cost-efficient manner. The overarching deliverables for the works are: - Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites. - Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations. - Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint. - Procurement of materials required for construction of OLE system. - Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section. The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works: - Final Registration of Queen Street North route section by 23/10/2023 - Final Registration of Bay route section by 15/06/2023 - Final Registration of Rhymney route section by 01/05/24 Specific OLE deliverables include, but are not limited to the design and construction of: - Foundation Installation - Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles. - Mast Installation - single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts. - Booms. - Ties, struts and small part steel including tensioning system etc - Switching including platforms as required - Wiring. - Final registration.
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-kuma6s-122940-2022-07-13T00:00:00Z",
"date": "2022-07-13T00:00:00Z",
"ocid": "ocds-kuma6s-122940",
"initiationType": "tender",
"parties": [
{
"id": "org-14",
"name": "Transport for Wales",
"identifier": {
"legalName": "Transport for Wales"
},
"address": {
"streetAddress": "3 Llys Cadwyn, Taff Street",
"locality": "Pontypridd",
"region": "UKL",
"postalCode": "CF37 4TH"
},
"contactPoint": {
"email": "procurement@tfw.wales",
"telephone": "+44 2921673434"
},
"roles": [
"buyer",
"centralPurchasingBody"
],
"details": {
"classifications": [
{
"id": "Regional or local agency/office",
"scheme": "TED_CA_TYPE"
},
{
"description": "Rail",
"scheme": "COFOG"
}
],
"url": "http://tfw.wales"
}
},
{
"id": "org-4",
"name": "High Court",
"identifier": {
"legalName": "High Court"
},
"address": {
"streetAddress": "Royal Courts of Justice, The Strand",
"locality": "London",
"postalCode": "WC2A 2LL"
},
"contactPoint": {
"telephone": "+44 2079477501"
},
"roles": [
"reviewBody"
]
}
],
"buyer": {
"name": "Transport for Wales",
"id": "org-14"
},
"planning": {
"documents": [
{
"id": "JUL404777",
"documentType": "plannedProcurementNotice",
"title": "TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification",
"description": "The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works. Programme constraints dictate that a supplier be appointed to undertake the works prior to completion of detailed design. The supplier shall be appointed on a design and build basis. The supplier shall be furnished with available outline designs, which they shall adopt and provide design liability for and, subsequently undertake the detailed design and installation. The qualitative and commercial elements of this procurement event therefore seek to ensure TfW appoint a supplier who will deliver the works in a collaborative and cost-efficient manner. The overarching deliverables for the works are: - Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites. - Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations. - Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint. - Procurement of materials required for construction of OLE system. - Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section. The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works: - Final Registration of Queen Street North route section by 23/10/2023 - Final Registration of Bay route section by 15/06/2023 - Final Registration of Rhymney route section by 01/05/24 Specific OLE deliverables include, but are not limited to the design and construction of: - Foundation Installation - Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles. - Mast Installation - single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts. - Booms. - Ties, struts and small part steel including tensioning system etc - Switching including platforms as required - Wiring. - Final registration.",
"url": "https://www.sell2wales.gov.wales/search/show/search_view.aspx?ID=JUL404777",
"format": "text/html"
}
]
},
"tender": {
"id": "ocds-kuma6s-122940-tender-122940",
"title": "TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification",
"description": "The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works. Programme constraints dictate that a supplier be appointed to undertake the works prior to completion of detailed design. The supplier shall be appointed on a design and build basis. The supplier shall be furnished with available outline designs, which they shall adopt and provide design liability for and, subsequently undertake the detailed design and installation. The qualitative and commercial elements of this procurement event therefore seek to ensure TfW appoint a supplier who will deliver the works in a collaborative and cost-efficient manner. The overarching deliverables for the works are: - Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites. - Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations. - Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint. - Procurement of materials required for construction of OLE system. - Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section. The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works: - Final Registration of Queen Street North route section by 23/10/2023 - Final Registration of Bay route section by 15/06/2023 - Final Registration of Rhymney route section by 01/05/24 Specific OLE deliverables include, but are not limited to the design and construction of: - Foundation Installation - Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles. - Mast Installation - single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts. - Booms. - Ties, struts and small part steel including tensioning system etc - Switching including platforms as required - Wiring. - Final registration.",
"status": "planned",
"items": [
{
"id": "1",
"additionalClassifications": [
{
"id": "45234100",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"region": "UKL"
}
],
"relatedLot": "1"
}
],
"mainProcurementCategory": "works",
"submissionMethod": [
"electronicSubmission"
],
"submissionMethodDetails": "https://www.sell2wales.gov.wales/",
"awardPeriod": {
"startDate": "2022-09-05T00:00:00Z"
},
"documents": [
{
"id": "ocds-kuma6s-122940-document-122940-JUL404777-1",
"title": "Blank Document. No action required.",
"url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=JUL404777&idx=1",
"datePublished": "2022-07-15T11:18:50Z",
"dateModified": "2022-07-15T11:18:50Z",
"format": "application/vnd.openxmlformats-officedocument.wordprocessingml.document"
},
{
"id": "ocds-kuma6s-122940-document-122940-JUL404777-2",
"title": "Design Doc Register",
"url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=JUL404777&idx=2",
"datePublished": "2022-08-03T11:15:44Z",
"dateModified": "2022-08-03T11:15:44Z",
"format": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet"
},
{
"id": "ocds-kuma6s-122940-document-122940-JUL404777-3",
"title": "Designs",
"url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=JUL404777&idx=3",
"datePublished": "2022-08-03T11:16:44Z",
"dateModified": "2022-08-03T11:16:44Z",
"format": "application/x-zip-compressed"
},
{
"id": "ocds-kuma6s-122940-document-122940-JUL404777-4",
"title": "Design",
"url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=JUL404777&idx=4",
"datePublished": "2022-08-03T11:49:41Z",
"dateModified": "2022-08-03T11:49:41Z",
"format": "application/x-zip-compressed"
}
],
"lots": [
{
"id": "1",
"description": "Design and installation of Overhead Line Equipment for the electrification of rail lines in Wales.",
"status": "planned"
}
],
"communication": {
"futureNoticeDate": "2022-08-18T00:00:00Z"
},
"contractTerms": {
"hasElectronicPayment": true,
"hasElectronicOrdering": true,
"electronicInvoicingPolicy": "allowed"
},
"coveredBy": [
"GPA"
],
"classification": {
"id": "45234100",
"scheme": "CPV"
},
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
}
},
"language": "EN",
"description": "To allow suppliers to satisfy themselves that they have the capacity to deliver the works, suppliers are invited to respond to the below questions using the questions and answer function within this notice. Please copy the question when responding to the questions and enter your company name within the text of the response. Please provide your responses by no later than 1st August 2022. If you require sight of any information (e.g. available designs) to inform your responses to the below, please request via the question and answer section and these will be provided. Q1 - Are you willing to adopt the outline OLE design (undertaken by others), develop to detailed design and accept liability for the entire design? Please answer Yes / No. Q2 - Are you able to commence installation of foundations by 1st October 2022? Please answer Yes / No. Q3 - Are you able to establish a materials storage and distribution facility local to the delivery of the works by 1st October 2022? Q4 - Are you able to procure and / or implement a material quality control and management system by 1st October 2022? Please answer Yes / No. Q5 - Are you able to appoint / and or establish a robust and experienced project delivery team by 1st October 2022? Please answer Yes and No. NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=122940. (WA Ref:122940)",
"links": [
{
"rel": "canonical",
"href": "https://api.sell2wales.gov.wales/v1?lang=cy/Notice?id=ocds-kuma6s-122940"
}
],
"noticetype": "OJEU - F1 - Prior Information Notice"
}