Notice Information
Notice Title
180009 Dallachy Capping Works
Notice Description
Landfill capping and restoration works are required at Nether Dallachy Landfill site. The area comprises approx 10,000 m2 of permanent capping on the top, north flank and south flank of of phase 7A and ancilliary drainage works. Also included in the workscope is temporary capping of the east slope of Phase 7a and depending on rate of infill, temporary capping to part of the top (with a corresponding reduction in area of permanent capping on the top area). The temporary cap is to be drained by rainflaps, aligned to give a gravity flow away from the adjacent waste to discharge outside of the contained area as clean runoff.
Lot Information
Lot 1
Landfill capping and restoration works are required at Nether Dallachy Landfill site. The area comprises approx 10,000 m2 of permanent capping on the top, north flank and south flank of of phase 7A and ancilliary drainage works. Also included in the workscope is temporary capping of the east slope of Phase 7a and depending on rate of infill, temporary capping to part of the top (with a corresponding reduction in area of permanent capping on the top area). The temporary cap is to be drained by rainflaps, aligned to give a gravity flow away from the adjacent waste to discharge outside of the contained area as clean runoff.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-r6ebe6-0000588005
- Publication Source
- Public Contracts Scotland
- Latest Notice
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUL361176
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- PCS Notice - Website Contract Award Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- Not specified
- Awardee Scale
- SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
-
- CPV Codes
45222110 - Waste disposal site construction work
Notice Value(s)
- Tender Value
- £2,000,000 £1M-£10M
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £169,457 £100K-£500K
Notice Dates
- Publication Date
- 23 Jul 20197 years ago
- Submission Deadline
- 3 Jul 2019Expired
- Future Notice Date
- Not specified
- Award Date
- 22 Jul 20197 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Complete
- Awards Status
- Not Specified
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- Moray Council
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- ELGIN
- Postcode
- IV30 1BX
- Postcode Area
- Inverness
- Country
- Scotland
-
- Major Region (ITL 1)
- TLM Scotland
- Basic Region (ITL 2)
- TLM2 Highlands and Islands
- Small Region (ITL 3)
- TLM20 Highlands and Islands
- Delivery Location
- TLM62 Inverness and Nairn, Moray, and Badenoch and Strathspey
-
- Local Authority
- Moray
- Electoral Ward
- Elgin City North
- Westminster Constituency
- Moray West, Nairn and Strathspey
Further Information
Notice Documents
-
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUN357793
180009 Dallachy Capping Works - Landfill capping and restoration works are required at Nether Dallachy Landfill site. The area comprises approx 10,000 m2 of permanent capping on the top, north flank and south flank of of phase 7A and ancilliary drainage works. Also included in the workscope is temporary capping of the east slope of Phase 7a and depending on rate of infill, temporary capping to part of the top (with a corresponding reduction in area of permanent capping on the top area). The temporary cap is to be drained by rainflaps, aligned to give a gravity flow away from the adjacent waste to discharge outside of the contained area as clean runoff. -
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUL361176
180009 Dallachy Capping Works - Landfill capping and restoration works are required at Nether Dallachy Landfill site. The area comprises approx 10,000 m2 of permanent capping on the top, north flank and south flank of of phase 7A and ancilliary drainage works. Also included in the workscope is temporary capping of the east slope of Phase 7a and depending on rate of infill, temporary capping to part of the top (with a corresponding reduction in area of permanent capping on the top area). The temporary cap is to be drained by rainflaps, aligned to give a gravity flow away from the adjacent waste to discharge outside of the contained area as clean runoff.
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.