Notice Information
Notice Title
Small Works Framework
Notice Description
Argyll and Bute Council require external contracts to support operations of Roads and Bridge squads. This is to supplement internal resource on an if and when required basis.
Lot Information
Area I Mid-Argyll: Sub-lot 1 Machine Surfacing
The framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll: 1 - Machine Surfacing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area I Mid-Argyll: Sub-lot 3 General Civils WorksThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll, sub-lot 3 - General Civils Works
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area I Mid-Argyll: Sub-lot 2 Carriageway & Footway PatchingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll, sub-lot 2 - Carriageway & Footway Patching.
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area I Mid-Argyll: Sub-lot 4 Kerbing & PavingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll, sub-lot 4 - Kerbing & Paving
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area I Mid-Argyll: Sub-lot 5 Vehicle Safety Fencing & FencingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll, sub-lot 5 - Vehicle Safety Fencing & Fencing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area I Mid-Argyll: Sub-lot 6 Lighting Cable & DuctingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll, sub-lot 6 - Lighting Cable & Ducting.
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area I Mid-Argyll: Sub-lot 7 General BuildingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area I Mid-Argyll, sub-lot 7 - General Building
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area II - Islay: Sub-lot 3 General Civils WorksThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area II Islay, sub-lot 3 - General Civils Works
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area II - Islay: Sub-lot 1 Machine SurfacingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area II - Islay: 1 - Machine Surfacing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area II - Islay: Sub-lot 4 Kerbing & PavingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area II Islay, sub-lot 4 - Kerbing & Paving
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area II - Islay: Sub-lot 5 Vehicle Safety Fencing & FencingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area II Islay, sub-lot 5 - Vehicle Safety Fencing & Fencing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area II - Islay: Sub-lot 6 Lighting Cable & DuctingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area II Islay, sub-lot 6 - Lighting Cable & Ducting
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area II - Islay: Sub-lot 7 General BuildingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area II Islay, sub-lot 7 - General Building
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area III - Kintyre: Sub-lot 1 Machine SurfacingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area III - Kintyre, sub-lot 1 - Machine Surfacing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area III - Kintyre: Sub-lot 2 Carriageway & Footway PatchingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area III - Kintyre, sub-lot 2 - Carriageway & Footway Patching
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area III - Kintyre: Sub-lot 3 General Civils WorksThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area III - Kintyre, sub-lot 3 - General Civils Works
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area III - Kintyre: Sub-lot 4 Kerbing & PavingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area III - Kintyre, sub-lot 4 - Kerbing & Paving
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area III - Kintyre: Sub-lot 5 Vehicle Safety Fencing & FencingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area III - Kintyre, sub-lot 5 - Vehicle Safety Fencing & Fencing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area III - Kintyre: Sub-lot 6 Lighting Cable & DuctingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area III - Kintyre, sub-lot 6 - Lighting Cable & Ducting
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area III - Kintyre: Sub-lot 7 General BuildingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area III - Kintyre, sub-lot 7 - General Building
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area IV - Lorn: Sub-lot 1 Machine SurfacingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area IV- Lorn, sub-lot 1 - Machine Surfacing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area IV - Lorn: Sub-lot 2 Carriageway & Footway PatchingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area IV- Lorn, sub-lot 2 - Carriageway & Footway Patching
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area IV - Lorn: Sub-lot 3 General Civils WorksThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area IV- Lorn, sub-lot 3 - General Civils Works
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area IV - Lorn: Sub-lot 4 Kerbing & PavingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area IV- Lorn, sub-lot 4 - Kerbing & Paving
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area IV - Lorn: Sub-lot 5 Vehicle Safety Fencing & FencingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area IV- Lorn, sub-lot 5 - Vehicle Safety Fencing & Fencing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area IV - Lorn: Sub-lot 6 Lighting Cable & DuctingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area IV- Lorn, sub-lot 6 - Lighting Cable & Ducting
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area IV - Lorn: Sub-lot 7 General BuildingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area IV- Lorn, sub-lot 7 - General Building
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area V - Mull - Sub-lot 1 Machine SurfacingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area V - Mull: 1 - Machine Surfacing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area V - Mull - Sub-lot 2 Carriageway & Footway PatchingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area V - Mull, sub-lot 2 - Carriageway & Footway Patching
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area V - Mull - Sub-lot 3 General Civils WorksThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area V - Mull, sub-lot 3 - General Civils Works
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area V - Mull - Sub-lot 4 Kerbing & PavingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area V - Mull, sub-lot 4 - Kerbing & Paving
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area V - Mull - Sub-lot 5 Vehicle Safety Fencing & FencingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area V - Mull, sub-lot 5 - Vehicle Safety Fencing & Fencing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area V - Mull - Sub-lot 6 Lighting Cable & DuctingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area V - Mull, sub-lot 6 - Lighting Cable & Ducting
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area V - Mull - Sub-lot 7 General BuildingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area V - Mull, sub-lot 7 - General Building
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VI - Cowal: Sub-lot 1 Machine SurfacingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area VI - Cowal, sub-lot 1 - Machine Surfacing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VI - Cowal: Sub-lot 2 Carriageway & Footway PatchingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VI - Cowal, sub-lot2 - Carriageway & Footway Patching
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VI - Cowal: Sub-lot 3 General Civils WorksThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VI - Cowal, sub-lot 3 - General Civils Works
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VI - Cowal: Sub-lot 4 Kerbing & PavingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VI - Cowal, sub-lot 4 - Kerbing & Paving
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VI - Cowal: Sub-lot 5 Vehicle Safety Fencing & FencingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VI - Cowal, sub-lot 5 - Vehicle Safety Fencing & Fencing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VI - Cowal: Sub-lot 6 Lighting Cable & DuctingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VI - Cowal, sub-lot 6 - Lighting Cable & Ducting
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VI - Cowal: Sub-lot 7 General BuildingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VI - Cowal, sub-lot 7 - General Building
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VII - Bute: Sub-lot 1 Machine SurfacingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area VII - Bute, sub-lot 1 - Machine Surfacing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VII - Bute: Sub-lot 2 Carriageway & Footway PatchingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VII - Bute, sub-lot 2 - Carriageway & Footway Patching
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VII - Bute: Sub-lot 3 General Civils WorksThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VII - Bute, sub-lot 3 - General Civils Works
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VII - Bute: Sub-lot 4 Kerbing & PavingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VII - Bute, sub-lot 4 - Kerbing & Paving
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VII - Bute: Sub-lot 5 Vehicle Safety Fencing & FencingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VII - Bute, sub-lot 5 - Vehicle Safety Fencing & Fencing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VII - Bute: Sub-lot 6 Lighting Cable & DuctingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VII - Bute, sub-lot 6 - Lighting Cable & Ducting
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VII - Bute: Sub-lot 7 General BuildingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VII - Bute, sub-lot 7 - General Building
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VIII - Lomond : Sub-lot 5 Vehicle Safety Fencing & FencingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VIII - Lomond, sub-lot 5 - Vehicle Safety Fencing & Fencing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VIII - Lomond : Sub-lot 6 Lighting Cable & DuctingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VIII - Lomond, sub-lot 6 - Lighting Cable & Ducting
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VIII - Lomond : Sub-lot 7 General BuildingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VIII - Lomond, sub-lot 7 - General Building
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VIII - Lomond : Sub-lot 1 Machine SurfacingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lots within Area VIII - Lomond, sub-lot 1 - Machine Surfacing
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VIII - Lomond : Sub-lot 2 Carriageway & Footway PatchingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VIII - Lomond, sub-lot 2 - Carriageway & Footway Patching
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VIII - Lomond : Sub-lot 3 General Civils WorksThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VIII - Lomond, sub-lot 3 - General Civils Works
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Area VIII - Lomond : Sub-lot 4 Kerbing & PavingThe framework is to meet the the Council's requirements (to supplement the Council's internal resource) if and when required for the following sub-lot within Area VIII - Lomond, sub-lot 4 - Kerbing & Paving
Renewal: The Framework may be extended for 1 year until 24/07/2025 at the option of Argyll and Bute Council, subject to satisfactory performance of the contract and product discussions with the successful Tenderer(s).
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-r6ebe6-0000655792
- Publication Source
- Public Contracts Scotland
- Latest Notice
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV433443
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- PCS Notice - Website Contract Award Notice
- Procurement Type
- Framework
- Procurement Category
- Works
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- Not specified
- Awardee Scale
- SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
-
- CPV Codes
45233120 - Road construction works
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 18 Nov 20214 years ago
- Submission Deadline
- 30 Jun 2021Expired
- Future Notice Date
- Not specified
- Award Date
- 11 Oct 20214 years ago
- Contract Period
- 23 Jul 2021 - 24 Jul 2024 3-4 years
- Recurrence
- In line with the end date of this framework
Notice Status
- Tender Status
- Complete
- Lots Status
- Active, Complete
- Awards Status
- Not Specified
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- Argyll and Bute Council
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- LOCHGILPHEAD
- Postcode
- PA31 8RT
- Postcode Area
- Paisley
- Country
- Scotland
-
- Major Region (ITL 1)
- TLM Scotland
- Basic Region (ITL 2)
- TLM2 Highlands and Islands
- Small Region (ITL 3)
- TLM20 Highlands and Islands
- Delivery Location
- TLM63 Lochaber, Skye and Lochalsh, Arran and Cumbrae, and Argyll and Bute
-
- Local Authority
- Argyll and Bute
- Electoral Ward
- Mid Argyll
- Westminster Constituency
- Argyll, Bute and South Lochaber
Supplier Information
- Number of Suppliers
- 18
- Supplier Names
D A MacDonald (Contractors) Ltd
George McNaughton & Son (Plant Hire) Ltd
Highland Fencing & Barrier Contractors
Hillhouse Quarry Group Ltd T/A MacASPHALT
McFadyens Contractors (Campbeltown) Ltd
McLaren Plant & Contracting ltd.
Further Information
Notice Documents
-
https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=JUN416965&idx=3
25th June 2021 - Community Benefits Clauses Guidance for Tenderers -
https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=JUN416965&idx=1
2nd June 2021 - Small Works Framework Invitation to Tender -
https://www.publiccontractsscotland.gov.uk/NoticeDownload/DownloadDocument.aspx?id=JUN416965&idx=2
2nd June 2021 - Pricing Schedules -
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUN416965
Small Works Framework - Argyll and Bute Council require external contracts to support operations of Roads and Bridge squads. This is to supplement internal resource on an if and when required basis. -
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV433443
Small Works Framework - Argyll and Bute Council require external contracts to support operations of Roads and Bridge squads. This is to supplement internal resource on an if and when required basis.
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.