Notice Information
Notice Title
A9(T) Tore Modelling
Notice Description
Transport Scotland previously commissioned a study under the DMRSS Framework to assess the safety and operational performance of the A9(T) corridor between North Kessock and Tore Roundabout, covering approximately 6km. This included both carriageways, North Kessock Junction, Tore Roundabout, and all intermediate junctions. The study reflected concerns raised by the DFM and her constituents and included extensive community engagement and options testing. The study took a holistic view of the corridor's current performance and considered the influence of existing and future developments contributing traffic to this section of the A9. It identified several issues consistent with previous assessments and proposed a range of improvement options, including the signalisation of Tore Roundabout and potential closure or restriction of various intermediate junctions on the A9 between Tore and North Kessock. Following this, a VISSIM model was developed to evaluate the operational impact of signalising Tore Roundabout to improve active travel provision particularly to the local primary school. and the potential closure of Munlochy Junction. Building on the previous modelling work, the next phase aims to update or expand the analysis to assess: - The impact on the road network of signalising Tore Roundabout in the context of future development from the Black Isle and wider area. - The implications of closing Munlochy Junction, particularly for remaining right-turn movements across the A9 between Munlochy Junction and Tore Roundabout. - The potential implications at the junctions between Munlochy/ North Kessock and Tore itself. The updated study will evaluate: - Traffic flow along the A9(T) - Local access and connectivity for Tore residents - Broader network performance and journey times - The effects of local development on the A9, A835 and connecting local roads vis a vis the options for change on the A9 itself.
Lot Information
Lot 1
Background Transport Scotland previously commissioned a study under the DMRSS Framework to assess the safety and operational performance of the A9(T) corridor between North Kessock and Tore Roundabout, covering approximately 6km. This included both carriageways, North Kessock Junction, Tore Roundabout, and all intermediate junctions. The study reflected concerns raised by the DFM and her constituents and included extensive community engagement and options testing. The study took a holistic view of the corridor's current performance and considered the influence of existing and future developments contributing traffic to this section of the A9. It identified several issues consistent with previous assessments and proposed a range of improvement options, including the signalisation of Tore Roundabout and potential closure or restriction of various intermediate junctions on the A9 between Tore and North Kessock. Following this, a VISSIM model was developed to evaluate the operational impact of signalising Tore Roundabout to improve active travel provision particularly to the local primary school. and the potential closure of Munlochy Junction. Objective Building on the previous modelling work, the next phase aims to update or expand the analysis to assess: - The impact on the road network of signalising Tore Roundabout in the context of future development from the Black Isle and wider area. - The implications of closing Munlochy Junction, particularly for remaining right-turn movements across the A9 between Munlochy Junction and Tore Roundabout. - The potential implications at the junctions between Munlochy/ North Kessock and Tore itself. The updated study will evaluate: - Traffic flow along the A9(T) - Local access and connectivity for Tore residents - Broader network performance and journey times - The effects of local development on the A9, A835 and connecting local roads vis a vis the options for change on the A9 itself. Scope of Services A suitably qualified consultant will be appointed to undertake the following tasks: 1. Modelling Methodology - Develop and agree a robust methodology to assess the proposed signalisation and the impacts of future development growth from the Black Isle. - Select and justify appropriate modelling software/tools that can be used to help demonstrate the impact of proposed signalisation, and future traffic growth to local residents. - Incorporate the impact of closing the right turn to Munlochy and other potential intermediate gaps on the A9. 2. Sensitivity Testing & Recommendations - Conduct sensitivity testing to reflect current and committed growth as outlined in the Local Development Plan. - Analyse modelling outputs to assess the impact of proposed mitigation measures and development growth on journey times and overall network performance. - Provide clear, evidence-based recommendations for next steps in the Tore and Black Isle Study.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-r6ebe6-0000838639
- Publication Source
- Public Contracts Scotland
- Latest Notice
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUL561133
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- PCS Notice - Website Contract Award Notice
- Procurement Type
- Standard
- Procurement Category
- Services
- Procurement Method
- Selective
- Procurement Method Details
- Restricted procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Large
Common Procurement Vocabulary (CPV)
- CPV Divisions
30 - Office and computing machinery, equipment and supplies except furniture and software packages
71 - Architectural, construction, engineering and inspection services
-
- CPV Codes
30196000 - Planning systems
71240000 - Architectural, engineering and planning services
71410000 - Urban planning services
90712000 - Environmental planning
90712100 - Urban environmental development planning
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £89,330 Under £100K
Notice Dates
- Publication Date
- 29 Jul 20261 weeks ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 15 Jul 20263 weeks ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Complete
- Awards Status
- Not Specified
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- TRANSPORT SCOTLAND
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- GLASGOW
- Postcode
- G2 7ER
- Post Town
- Glasgow
- Country
- Scotland
-
- Major Region (ITL 1)
- TLM Scotland
- Basic Region (ITL 2)
- TLM3 West Central Scotland
- Small Region (ITL 3)
- TLM32 Glasgow City
- Delivery Location
- TLM Scotland
-
- Local Authority
- Glasgow City
- Electoral Ward
- Anderston/City/Yorkhill
- Westminster Constituency
- Glasgow North
Further Information
Notice Documents
-
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUL561133
A9(T) Tore Modelling - Transport Scotland previously commissioned a study under the DMRSS Framework to assess the safety and operational performance of the A9(T) corridor between North Kessock and Tore Roundabout, covering approximately 6km. This included both carriageways, North Kessock Junction, Tore Roundabout, and all intermediate junctions. The study reflected concerns raised by the DFM and her constituents and included extensive community engagement and options testing. The study took a holistic view of the corridor's current performance and considered the influence of existing and future developments contributing traffic to this section of the A9. It identified several issues consistent with previous assessments and proposed a range of improvement options, including the signalisation of Tore Roundabout and potential closure or restriction of various intermediate junctions on the A9 between Tore and North Kessock. Following this, a VISSIM model was developed to evaluate the operational impact of signalising Tore Roundabout to improve active travel provision particularly to the local primary school. and the potential closure of Munlochy Junction. Building on the previous modelling work, the next phase aims to update or expand the analysis to assess: - The impact on the road network of signalising Tore Roundabout in the context of future development from the Black Isle and wider area. - The implications of closing Munlochy Junction, particularly for remaining right-turn movements across the A9 between Munlochy Junction and Tore Roundabout. - The potential implications at the junctions between Munlochy/ North Kessock and Tore itself. The updated study will evaluate: - Traffic flow along the A9(T) - Local access and connectivity for Tore residents - Broader network performance and journey times - The effects of local development on the A9, A835 and connecting local roads vis a vis the options for change on the A9 itself.
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-r6ebe6-0000838639-2026-07-29T00:00:00Z",
"date": "2026-07-29T00:00:00Z",
"ocid": "ocds-r6ebe6-0000838639",
"initiationType": "tender",
"parties": [
{
"id": "org-45",
"name": "Transport Scotland",
"identifier": {
"legalName": "Transport Scotland"
},
"address": {
"streetAddress": "5th Floor, 177 Bothwell Street",
"locality": "Glasgow",
"region": "UKM82",
"postalCode": "G2 7ER"
},
"contactPoint": {
"email": "denise.angus@transport.gov.scot",
"telephone": "+44 1412727100",
"url": "http://"
},
"roles": [
"buyer",
"centralPurchasingBody"
],
"details": {
"classifications": [
{
"id": "National or federal agency/office",
"scheme": "TED_CA_TYPE"
},
{
"id": "Transport",
"scheme": "COFOG"
},
{
"id": "Ministry or any other national or federal authority, including their regional or local subdivisions",
"scheme": "TED_CA_TYPE"
}
],
"url": "http://www.transport.gov.scot"
}
},
{
"id": "org-117",
"name": "WSP UK Ltd",
"identifier": {
"legalName": "WSP UK Ltd"
},
"address": {
"streetAddress": "110 Queen Street",
"locality": "Glasgow",
"region": "UKM82",
"postalCode": "G1 3BX"
},
"contactPoint": {
"telephone": "+44 7976456481"
},
"roles": [
"supplier"
],
"details": {
"scale": "large",
"url": "http://"
}
},
{
"id": "org-106",
"name": "Sheriff Clerk's Office",
"identifier": {
"legalName": "Sheriff Clerk's Office"
},
"address": {
"streetAddress": "PO Box 23, 1 Carlton Place",
"locality": "Glasgow",
"postalCode": "G5 9DW"
},
"contactPoint": {
"url": "http://"
},
"roles": [
"reviewBody"
]
}
],
"buyer": {
"name": "Transport Scotland",
"id": "org-45"
},
"tender": {
"id": "ocds-r6ebe6-0000838639",
"title": "A9(T) Tore Modelling",
"description": "Transport Scotland previously commissioned a study under the DMRSS Framework to assess the safety and operational performance of the A9(T) corridor between North Kessock and Tore Roundabout, covering approximately 6km. This included both carriageways, North Kessock Junction, Tore Roundabout, and all intermediate junctions. The study reflected concerns raised by the DFM and her constituents and included extensive community engagement and options testing. The study took a holistic view of the corridor's current performance and considered the influence of existing and future developments contributing traffic to this section of the A9. It identified several issues consistent with previous assessments and proposed a range of improvement options, including the signalisation of Tore Roundabout and potential closure or restriction of various intermediate junctions on the A9 between Tore and North Kessock. Following this, a VISSIM model was developed to evaluate the operational impact of signalising Tore Roundabout to improve active travel provision particularly to the local primary school. and the potential closure of Munlochy Junction. Building on the previous modelling work, the next phase aims to update or expand the analysis to assess: - The impact on the road network of signalising Tore Roundabout in the context of future development from the Black Isle and wider area. - The implications of closing Munlochy Junction, particularly for remaining right-turn movements across the A9 between Munlochy Junction and Tore Roundabout. - The potential implications at the junctions between Munlochy/ North Kessock and Tore itself. The updated study will evaluate: - Traffic flow along the A9(T) - Local access and connectivity for Tore residents - Broader network performance and journey times - The effects of local development on the A9, A835 and connecting local roads vis a vis the options for change on the A9 itself.",
"status": "complete",
"items": [
{
"id": "1",
"additionalClassifications": [
{
"id": "71410000",
"scheme": "CPV"
},
{
"id": "71240000",
"scheme": "CPV"
},
{
"id": "90712000",
"scheme": "CPV"
},
{
"id": "30196000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"region": "UKM"
}
],
"relatedLot": "1"
}
],
"procurementMethod": "selective",
"procurementMethodDetails": "Restricted procedure",
"mainProcurementCategory": "services",
"documents": [
{
"id": "JUL561133",
"documentType": "awardNotice",
"title": "A9(T) Tore Modelling",
"description": "Transport Scotland previously commissioned a study under the DMRSS Framework to assess the safety and operational performance of the A9(T) corridor between North Kessock and Tore Roundabout, covering approximately 6km. This included both carriageways, North Kessock Junction, Tore Roundabout, and all intermediate junctions. The study reflected concerns raised by the DFM and her constituents and included extensive community engagement and options testing. The study took a holistic view of the corridor's current performance and considered the influence of existing and future developments contributing traffic to this section of the A9. It identified several issues consistent with previous assessments and proposed a range of improvement options, including the signalisation of Tore Roundabout and potential closure or restriction of various intermediate junctions on the A9 between Tore and North Kessock. Following this, a VISSIM model was developed to evaluate the operational impact of signalising Tore Roundabout to improve active travel provision particularly to the local primary school. and the potential closure of Munlochy Junction. Building on the previous modelling work, the next phase aims to update or expand the analysis to assess: - The impact on the road network of signalising Tore Roundabout in the context of future development from the Black Isle and wider area. - The implications of closing Munlochy Junction, particularly for remaining right-turn movements across the A9 between Munlochy Junction and Tore Roundabout. - The potential implications at the junctions between Munlochy/ North Kessock and Tore itself. The updated study will evaluate: - Traffic flow along the A9(T) - Local access and connectivity for Tore residents - Broader network performance and journey times - The effects of local development on the A9, A835 and connecting local roads vis a vis the options for change on the A9 itself.",
"url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUL561133",
"format": "text/html"
}
],
"lots": [
{
"id": "1",
"description": "Background Transport Scotland previously commissioned a study under the DMRSS Framework to assess the safety and operational performance of the A9(T) corridor between North Kessock and Tore Roundabout, covering approximately 6km. This included both carriageways, North Kessock Junction, Tore Roundabout, and all intermediate junctions. The study reflected concerns raised by the DFM and her constituents and included extensive community engagement and options testing. The study took a holistic view of the corridor's current performance and considered the influence of existing and future developments contributing traffic to this section of the A9. It identified several issues consistent with previous assessments and proposed a range of improvement options, including the signalisation of Tore Roundabout and potential closure or restriction of various intermediate junctions on the A9 between Tore and North Kessock. Following this, a VISSIM model was developed to evaluate the operational impact of signalising Tore Roundabout to improve active travel provision particularly to the local primary school. and the potential closure of Munlochy Junction. Objective Building on the previous modelling work, the next phase aims to update or expand the analysis to assess: - The impact on the road network of signalising Tore Roundabout in the context of future development from the Black Isle and wider area. - The implications of closing Munlochy Junction, particularly for remaining right-turn movements across the A9 between Munlochy Junction and Tore Roundabout. - The potential implications at the junctions between Munlochy/ North Kessock and Tore itself. The updated study will evaluate: - Traffic flow along the A9(T) - Local access and connectivity for Tore residents - Broader network performance and journey times - The effects of local development on the A9, A835 and connecting local roads vis a vis the options for change on the A9 itself. Scope of Services A suitably qualified consultant will be appointed to undertake the following tasks: 1. Modelling Methodology - Develop and agree a robust methodology to assess the proposed signalisation and the impacts of future development growth from the Black Isle. - Select and justify appropriate modelling software/tools that can be used to help demonstrate the impact of proposed signalisation, and future traffic growth to local residents. - Incorporate the impact of closing the right turn to Munlochy and other potential intermediate gaps on the A9. 2. Sensitivity Testing & Recommendations - Conduct sensitivity testing to reflect current and committed growth as outlined in the Local Development Plan. - Analyse modelling outputs to assess the impact of proposed mitigation measures and development growth on journey times and overall network performance. - Provide clear, evidence-based recommendations for next steps in the Tore and Black Isle Study.",
"status": "complete",
"hasOptions": false
}
],
"coveredBy": [
"GPA"
],
"classification": {
"id": "90712100",
"scheme": "CPV"
}
},
"awards": [
{
"id": "TS/ROADS/SER/2022/03/02",
"suppliers": [
{
"id": "org-117",
"name": "WSP UK Ltd"
}
],
"relatedLots": [
"1"
]
}
],
"contracts": [
{
"id": "TS/ROADS/SER/2022/03/02",
"awardID": "TS/ROADS/SER/2022/03/02",
"status": "active",
"value": {
"amount": 89330.4,
"currency": "GBP"
},
"dateSigned": "2026-07-15T00:00:00Z"
}
],
"language": "EN",
"relatedProcesses": [
{
"id": "1",
"identifier": "ocds-r6ebe6-0000719374"
}
],
"description": "Award against framework: Development Management, Road Safety and Active Travel Support Services Framework Community benefits are included in this requirement. For more information see: https://www.gov.scot/policies/public-sector-procurement/community-benefits-in-procurement/ A summary of the expected community benefits has been provided as follows: Community benefits will be supplied inline with details outlined in the Schedule 5. (SC Ref:838639)",
"bids": {
"statistics": [
{
"id": "320",
"measure": "bids",
"value": 1,
"relatedLot": "1"
},
{
"id": "321",
"measure": "smeBids",
"value": 0,
"relatedLot": "1"
},
{
"id": "322",
"measure": "foreignBidsFromEU",
"value": 0,
"relatedLot": "1"
},
{
"id": "323",
"measure": "foreignBidsFromNonEU",
"value": 1,
"relatedLot": "1"
},
{
"id": "324",
"measure": "electronicBids",
"value": 1,
"relatedLot": "1"
}
]
},
"links": [
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000838639"
}
],
"noticetype": "PCS Notice - Website Contract Award Notice"
}