This public procurement record has 2 releases in its history.

Summary of the contracting process

Argyll and Bute Council commissioned design services for Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath. The route is intended to connect the Helensburgh Waterfront segregated cycleway with the existing path beside the A814 at Red Burn, near the north-east corner of the Morrisons site. The work develops the existing concept design through developed and technical design stages, and includes acting as Principal Designer during construction. The scope covers community, stakeholder and landowner engagement; topographic and utilities surveys; an equality impact assessment; and a preliminary environmental assessment. The resulting route and drawings are intended to have local support and be robust, deliverable and high quality. Delivery is in Helensburgh, Cardross and Dumbarton.

The procurement is complete and the contract is active. Argyll and Bute Council used an open procedure and awarded the single lot to Connected Transport Planning Ltd. The contract was signed on 5 November 2026, for £188,136. The contract period runs from 16 November 2026 to 31 March 2027. The council may extend the end date to March 2028 or March 2029 if funding is secured for those years; it may also extend the contract until 31 March 2035, subject to satisfactory performance and discussions with the supplier. Four bids were received, including three from small and medium-sized enterprises. Staff names and qualifications were required, and variant bids were not permitted.

This award demonstrates demand from Argyll and Bute Council for multidisciplinary active-travel route design, combining transport design with surveying, environmental and equality assessment, and extensive engagement with communities, businesses, stakeholders and landowners. A credible competitor for a future requirement of this kind would need a qualified, experienced design team able to take a concept through developed and technical design, produce robust and deliverable drawings, and undertake the Principal Designer role during construction. The work also calls for topographic and utilities survey capability, route assessment and the ability to build support among affected communities and landowners. The council’s appointment of a small and medium-sized enterprise, alongside a competitive field that included other such businesses, shows that this scale of design commission can attract SME suppliers. The selected supplier planned subcontracting of a defined share of the work.

How relevant is this notice?

Notice Information

Notice Title

Helensburgh, Cardross, Dumbarton Cyclepath Active Travel Route - Phase 3: Developed & Technical Design

Notice Description

This tender is for Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath; linking the Helensburgh Waterfront segregated cycleway (OS Grid NS 29598 82259) to the existing section of the cyclepath adjacent to the A814 at the Red Burn (OS Grid NS 31655 81112), near the north-east corner of Morrisons Supermarket site, and will build upon the concept design developed for the majority of the route (Civic Engineers, 2025). Argyll & Bute Council wish to appoint an appropriately qualified and experienced design team to develop Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath project from the current concept design through Developed (RIBA Stage 3) and Technical (RIBA Stage 4) Design, and to be Principal Designer during construction (RIBA Stage 5). The project will require the successful tenderer to complete a range of survey, design and in-depth engagement work, including in-depth community, stakeholder and landowner engagement, topographic and utilities surveys, equality impact assessment (EqIA) and Preliminary Environmental Assessment (PEA) to ensure route(s) identified have strong community, neighbour and landowner support and that the design drawings for the route(s) are robust, deliverable and of a high quality. These will all be subject to engagement with the community, businesses, landowners, neighbouring landowners, Argyll and Bute Council, Strathclyde Partnership for Transport (SPT) and Transport Scotland.

Lot Information

Lot 1

This tender is for Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath; linking the Helensburgh Waterfront segregated cycleway (OS Grid NS 29598 82259) to the existing section of the cyclepath adjacent to the A814 at the Red Burn (OS Grid NS 31655 81112), near the north-east corner of Morrisons Supermarket site, and will build upon the concept design developed for the majority of the route (Civic Engineers, 2025). Argyll & Bute Council wish to appoint an appropriately qualified and experienced design team to develop Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath project from the current concept design through Developed (RIBA Stage 3) and Technical (RIBA Stage 4) Design, and to be Principal Designer during construction (RIBA Stage 5). The project will require the successful tenderer to complete a range of survey, design and in-depth engagement work, including in-depth community, stakeholder and landowner engagement, topographic and utilities surveys, equality impact assessment (EqIA) and Preliminary Environmental Assessment (PEA) to ensure route(s) identified have strong community, neighbour and landowner support and that the design drawings for the route(s) are robust, deliverable and of a high quality. These will all be subject to engagement with the community, businesses, landowners, neighbouring landowners, Argyll and Bute Council, Strathclyde Partnership for Transport (SPT) and Transport Scotland.

Renewal: The Council has the option, if funding is secured for 27/28, to revise the end date to 31/03/2028. The Council has the option, if funding is secured for 28/29, to revise the end date to 31/03/2029. The Contract may be extended until 31/03/2035 at the option of the Council, subject to satisfactory performance of the contract and discussions with the successful Tenderer.

Notice Details

Publication & Lifecycle

Open Contracting ID
ocds-r6ebe6-0000842271
Publication Source
Public Contracts Scotland
Latest Notice
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV568334
Current Stage
Award
All Stages
Tender, Award

Procurement Classification

Notice Type
PCS Notice - Website Contract Award Notice
Procurement Type
Standard
Procurement Category
Services
Procurement Method
Open
Procurement Method Details
Open procedure
Tender Suitability
Not specified
Awardee Scale
SME

Common Procurement Vocabulary (CPV)

CPV Divisions

79 - Business services: law, marketing, consulting, recruitment, printing and security


CPV Codes

79415200 - Design consultancy services

Notice Value(s)

Tender Value
Not specified
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
£188,136 £100K-£500K

Notice Dates

Publication Date
9 Nov 20261 weeks ago
Submission Deadline
2 Oct 2026Expired
Future Notice Date
Not specified
Award Date
Not specified
Contract Period
16 Nov 2026 - 31 Mar 2027 1-6 months
Recurrence
Not specified

Notice Status

Tender Status
Complete
Lots Status
Complete
Awards Status
Not Specified
Contracts Status
Active

Buyer & Supplier

Contracting Authority (Buyer)

Main Buyer
Argyll and Bute Council
Contact Name
Available with D3 Tenders Premium →
Contact Email
Available with D3 Tenders Premium →
Contact Phone
Available with D3 Tenders Premium →

Buyer Location

Locality
LOCHGILPHEAD
Postcode
PA31 8RT
Postcode Area
Paisley
Country
Scotland

Major Region (ITL 1)
TLM Scotland
Basic Region (ITL 2)
TLM2 Highlands and Islands
Small Region (ITL 3)
TLM20 Highlands and Islands
Delivery Location
TLM81 East Dunbartonshire, West Dunbartonshire, and Helensburgh and Lomond

Local Authority
Argyll and Bute
Electoral Ward
Mid Argyll
Westminster Constituency
Argyll, Bute and South Lochaber

Supplier Information

Number of Suppliers
1
Supplier Name

Connected Transport Planning

Further Information

Notice Documents

  • https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=SEP563948
    Helensburgh, Cardross, Dumbarton Cyclepath Active Travel Route - Phase 3: Developed & Technical Design - This tender is for Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath; linking the Helensburgh Waterfront segregated cycleway (OS Grid NS 29598 82259) to the existing section of the cyclepath adjacent to the A814 at the Red Burn (OS Grid NS 31655 81112), near the north-east corner of Morrisons Supermarket site, and will build upon the concept design developed for the majority of the route (Civic Engineers, 2025). Argyll & Bute Council wish to appoint an appropriately qualified and experienced design team to develop Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath project from the current concept design through Developed (RIBA Stage 3) and Technical (RIBA Stage 4) Design, and to be Principal Designer during construction (RIBA Stage 5). The project will require the successful tenderer to complete a range of survey, design and in-depth engagement work, including in-depth community, stakeholder and landowner engagement, topographic and utilities surveys, equality impact assessment (EqIA) and Preliminary Environmental Assessment (PEA) to ensure route(s) identified have strong community, neighbour and landowner support and that the design drawings for the route(s) are robust, deliverable and of a high quality. These will all be subject to engagement with the community, businesses, landowners, neighbouring landowners, Argyll and Bute Council, Strathclyde Partnership for Transport (SPT) and Transport Scotland.
  • https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV568334
    Helensburgh, Cardross, Dumbarton Cyclepath Active Travel Route - Phase 3: Developed & Technical Design - This tender is for Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath; linking the Helensburgh Waterfront segregated cycleway (OS Grid NS 29598 82259) to the existing section of the cyclepath adjacent to the A814 at the Red Burn (OS Grid NS 31655 81112), near the north-east corner of Morrisons Supermarket site, and will build upon the concept design developed for the majority of the route (Civic Engineers, 2025). Argyll & Bute Council wish to appoint an appropriately qualified and experienced design team to develop Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath project from the current concept design through Developed (RIBA Stage 3) and Technical (RIBA Stage 4) Design, and to be Principal Designer during construction (RIBA Stage 5). The project will require the successful tenderer to complete a range of survey, design and in-depth engagement work, including in-depth community, stakeholder and landowner engagement, topographic and utilities surveys, equality impact assessment (EqIA) and Preliminary Environmental Assessment (PEA) to ensure route(s) identified have strong community, neighbour and landowner support and that the design drawings for the route(s) are robust, deliverable and of a high quality. These will all be subject to engagement with the community, businesses, landowners, neighbouring landowners, Argyll and Bute Council, Strathclyde Partnership for Transport (SPT) and Transport Scotland.

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

JSON Markdown

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

Loading OCDS record...