Notice Information
Notice Title
Kishorn East Reclamation and Dry Dock Enlargement - Phase 1B East Quay
Notice Description
Kishorn Port Limited (KPL) own and operate the Dry Dock facility at Kishorn. The existing dry dock has been enlarged with the rock material blasted and removed to reclaim 8.5 hectares of foreshore land to the east of the dry dock. The Contractor will construct a new 150m long quay at the reclamation area with -12mCD water depth. In support of its ongoing operations, KPL is engaging in market research with a view to launching a competitive tender process for works associated with the East Reclamation and Dry Dock Enlargement Phase 1B East Quay at a later date for the award of a contract.
Lot Information
Lot 1
An SPD process will be undertaken to select a maximum of five tenderers. The aim of this Prior Information Notice is both to research the market to inform the design of the procurement and to give an advanced notice of the planned release of the contract notice which is due in September 2026. Contractors are invited to provide early expression of interest in relation to this opportunity. It is proposed that the scope shall be for the Contractor to undertake the following works: Construction of a piling bund, using rock material from Phase 1 stockpiles to the west of the dry dock; driving of sheet piles and combi piles; installation of tie rods to anchor wall; manufacture of precast concrete capping beam units and insitu infill; bollards and ladders; lighting columns and services ducting; two piled mooring dolphins with rock anchors; steel walkway bridges to the dolphins; placement of rock armour and infill; removal of piling bund from in front of the quay wall piling and reused for reclamation behind the piles; surfacing behind quay from 6F2 fill; cathodic protection to piles. The successful contractor will be appointed as Principal Contractor. The works will be fully designed by the Client's Design Team.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-r6ebe6-0000840015
- Publication Source
- Public Contracts Scotland
- Latest Notice
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG563281
- Current Stage
- Planning
- All Stages
- Planning
Procurement Classification
- Notice Type
- PCS Notice - Website Prior Information Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
-
- CPV Codes
44212400 - Piling
45112300 - Infill and land-reclamation work
45241000 - Harbour construction works
45244000 - Marine construction works
Notice Value(s)
- Tender Value
- £30,000,000 £10M-£100M
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 28 Aug 20265 days ago
- Submission Deadline
- Not specified
- Future Notice Date
- 30 Sep 20264 weeks to go
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Planned
- Lots Status
- Planned
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- Kishorn Port Limited
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- DINGWALL
- Postcode
- IV15 9HA
- Postcode Area
- Inverness
- Country
- Scotland
-
- Major Region (ITL 1)
- TLM Scotland
- Basic Region (ITL 2)
- TLM2 Highlands and Islands
- Small Region (ITL 3)
- TLM20 Highlands and Islands
- Delivery Location
- TLM6 Highlands and Islands
-
- Local Authority
- Highland
- Electoral Ward
- Dingwall and Seaforth
- Westminster Constituency
- Caithness, Sutherland and Easter Ross
Further Information
Notice Documents
-
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG563281
Kishorn East Reclamation and Dry Dock Enlargement - Phase 1B East Quay - Kishorn Port Limited (KPL) own and operate the Dry Dock facility at Kishorn. The existing dry dock has been enlarged with the rock material blasted and removed to reclaim 8.5 hectares of foreshore land to the east of the dry dock. The Contractor will construct a new 150m long quay at the reclamation area with -12mCD water depth. In support of its ongoing operations, KPL is engaging in market research with a view to launching a competitive tender process for works associated with the East Reclamation and Dry Dock Enlargement Phase 1B East Quay at a later date for the award of a contract.
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.