Notice Information
Notice Title
MOBILE PLANT FOR RRC'S
Notice Description
Our RRC's where we operate mobile plant are located in the following London Boroughs: Camden Waltham Forest Barnet Haringey We will require mobile plant to be delivered to these locations at the start of any contract and maintained throughout the term, onsite at the same address the plants were delivered to. The Contract shall commence on 1 October 2026 for an initial term of three (3) years, with the option to extend for up to a further two (2) years on a year-by-year basis (3+1+1), subject to mutual agreement between the parties. Barrowell Green RRC is currently excluded from the initial scope of this procurement. However, the Company reserves the right to incorporate Barrowell Green RRC into the Contract during the contract term, subject to operational requirements and agreement in accordance with the Contract provisions ot 1 Requirements for mobile plants at LondonEnergy RRC's: All mobile plants must meet waste specification requirements. All Mobile Plants are to be fitted with the following: Reversing/CCTV camera. (There are several systems commonly used to improve all round visibility not just reversing, please detail what your system will provide and how it meets industry best practise.) Amber warning beacon, green seat belt warning light, audible reversing warning & standard reversing lights, red seat belts. An automated engine cut off that shall activate with prior warning if the plant is left in idle mode for a duration longer than 3 minutes. Air pre-cleaner (preferably cyclone type) and HEPA 0.3 micron cab filters (or better) to deal with dusty working environment. When proposing the type of filters suppliers must take into account the environment and potential Biohazards; please detail what levels of protection the filters will give and the WEL rating. LEL actively encourage suppliers to visit each site to view the operation and confirm if the systems specify will meet or exceed the needs of each mobile plant item. Windscreen cage protection to be fitted to fully protect the operator from debris falling from the bucket whilst maintaining maximum all-round visibility and should be hinged to allow for access to clean glazing. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. To have restricted access to gear selection (1st & 2nd only) or a speed limiter set to a maximum of 10MPH. On-board automated fire suppression system to tackle both engine fires and fires around the bodywork of the mobile plant A separate cost for a 12-volt electrical supply to be fitted to operator cabs should be supplied if the plant specified does not have this as standard, this shall allow for retro installation/fitting of LEL owned radio equipment by LEL or their agents. Anti-theft devices Additional guarding around hydraulic hoses to minimise risk of wear and tear when in contact with waste. All plants must work in all weather conditions, specifically dusty, hot, and humid atmospheres , please reference any specific items such as wide core radiators and/or reversing radiator fan cooling systems that are fitted to all mobile plants being specified by yourselves. All mobile plant must be suitable for working outside continuously. LEL reserve the right to install proximity sensors or any other H&S equipment on the machines supplied, prior notification will be provided. 5 (6) x material handling machines (Equivalent to LH 18 M Liebherr) Fitted with a suitable waste rehandling grab or their equivalent. Supplied on solid tyres. Rehandling grab to be supplied with 40mm thickness one piece wear edge sets. The engineering specification and source of manufacture is to be supplied to LEL. Waste rehandling grab to be configured to have the open/close and rotation circuits operated by foot pedals on the 3rd line circuit and not electrical switching on the joystick handles. The open/close to be on the right-hand pedal with a backward movement to close and forward to open configuration. The rotation on the left-hand pedal with a clockwise rotation in forward position and anticlockwise in the backward position. Grab to be permanently fitted to the dipper arm, quick hitch systems are not required. To be fitted with long arms. To be fitted with machine stabilisers To have a raising cab Estimated usage per annum is 1400hrs (+/- 10%). Lot 2 Maintenance includes: Servicing Electrical upgrades Contractor to manage servicing and planned maintenance, but LEL need to know 14 days in advance in order to plan the operation around down-time. Replacement machinery is to be provided if it is to be out of service for longer than 24hrs due to parts or engineer availability Replacement machinery is to be provided if it is required to be taken off site for repairs/maintenance for longer than 24hrs. Alternatively, haulage provided to move a piece of mobile plant from one site to another if in agreement with LEL and is operational suitable. Wear & tear to be included in contract Lot 3 Maintenance includes: Tyres Tail blades There must be service for reactive maintenance 7 days a week, incl. plant break-down and attendance within 90mins of fault notification. All repairs are to be completed during site operational hours (08:30-16:30 Monday-Sunday) Suppliers are welcome to bid for lots 1, 2 and/or 3. Please include the different prices for each lot in the pricing schedule below (section 3).
Planning Information
Process involves using MultiQuote and Contract s finder to advertise, contacting existing supplier directly to give notice of upcoming tender
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-06a32b
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/048621-2026
- Current Stage
- Planning
- All Stages
- Planning
Procurement Classification
- Notice Type
- UK2 - Preliminary Market Engagement Notice
- Procurement Type
- Standard
- Procurement Category
- Goods
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- SME
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
34 - Transport equipment and auxiliary products to transportation
45 - Construction work
-
- CPV Codes
34000000 - Transport equipment and auxiliary products to transportation
45252110 - Mobile plant construction work
45259000 - Repair and maintenance of plant
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 26 May 20261 weeks ago
- Submission Deadline
- Not specified
- Future Notice Date
- 19 Jun 20263 weeks to go
- Award Date
- Not specified
- Contract Period
- 30 Sep 2026 - 30 Sep 2029 3-4 years
- Recurrence
- Not specified
Notice Status
- Tender Status
- Planning
- Lots Status
- Planning
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- LONDONENERGY LTD
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- LONDON
- Postcode
- N18 3AG
- Post Town
- North London
- Country
- England
-
- Major Region (ITL 1)
- TLI London
- Basic Region (ITL 2)
- TLI5 Outer London - East and North East
- Small Region (ITL 3)
- TLI54 Enfield
- Delivery Location
- TLI London
-
- Local Authority
- Enfield
- Electoral Ward
- Edmonton Green
- Westminster Constituency
- Edmonton and Winchmore Hill
Further Information
Notice Documents
-
https://www.find-tender.service.gov.uk/Notice/048621-2026
26th May 2026 - Preliminary market engagement notice on Find a Tender
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-06a32b-2026-05-26T12:06:30+01:00",
"date": "2026-05-26T12:06:30+01:00",
"ocid": "ocds-h6vhtk-06a32b",
"initiationType": "tender",
"parties": [
{
"id": "GB-COH-02732548",
"name": "LONDONENERGY LTD",
"identifier": {
"scheme": "GB-COH",
"id": "02732548"
},
"additionalIdentifiers": [
{
"scheme": "GB-PPON",
"id": "PXMX-9411-QDZJ"
}
],
"address": {
"streetAddress": "Ecopark, Advent Way",
"locality": "London",
"postalCode": "N18 3AG",
"country": "GB",
"countryName": "United Kingdom",
"region": "UKI54"
},
"contactPoint": {
"email": "Procurement@londonenergyltd.com"
},
"roles": [
"buyer"
],
"details": {
"classifications": [
{
"id": "privateUtility",
"scheme": "UK_CA_TYPE",
"description": "Private utility"
}
]
}
}
],
"buyer": {
"id": "GB-COH-02732548",
"name": "LONDONENERGY LTD"
},
"planning": {
"milestones": [
{
"id": "engagement",
"type": "engagement",
"description": "Process involves using MultiQuote and Contract s finder to advertise, contacting existing supplier directly to give notice of upcoming tender",
"dueDate": "2026-06-18T23:59:59+01:00",
"status": "scheduled"
}
],
"documents": [
{
"id": "048621-2026",
"documentType": "marketEngagementNotice",
"noticeType": "UK2",
"description": "Preliminary market engagement notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/048621-2026",
"datePublished": "2026-05-26T12:06:30+01:00",
"format": "text/html"
}
]
},
"tender": {
"id": "ocds-h6vhtk-06a32b",
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"title": "MOBILE PLANT FOR RRC'S",
"description": "Our RRC's where we operate mobile plant are located in the following London Boroughs: Camden Waltham Forest Barnet Haringey We will require mobile plant to be delivered to these locations at the start of any contract and maintained throughout the term, onsite at the same address the plants were delivered to. The Contract shall commence on 1 October 2026 for an initial term of three (3) years, with the option to extend for up to a further two (2) years on a year-by-year basis (3+1+1), subject to mutual agreement between the parties. Barrowell Green RRC is currently excluded from the initial scope of this procurement. However, the Company reserves the right to incorporate Barrowell Green RRC into the Contract during the contract term, subject to operational requirements and agreement in accordance with the Contract provisions ot 1 Requirements for mobile plants at LondonEnergy RRC's: All mobile plants must meet waste specification requirements. All Mobile Plants are to be fitted with the following: Reversing/CCTV camera. (There are several systems commonly used to improve all round visibility not just reversing, please detail what your system will provide and how it meets industry best practise.) Amber warning beacon, green seat belt warning light, audible reversing warning & standard reversing lights, red seat belts. An automated engine cut off that shall activate with prior warning if the plant is left in idle mode for a duration longer than 3 minutes. Air pre-cleaner (preferably cyclone type) and HEPA 0.3 micron cab filters (or better) to deal with dusty working environment. When proposing the type of filters suppliers must take into account the environment and potential Biohazards; please detail what levels of protection the filters will give and the WEL rating. LEL actively encourage suppliers to visit each site to view the operation and confirm if the systems specify will meet or exceed the needs of each mobile plant item. Windscreen cage protection to be fitted to fully protect the operator from debris falling from the bucket whilst maintaining maximum all-round visibility and should be hinged to allow for access to clean glazing. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. To have restricted access to gear selection (1st & 2nd only) or a speed limiter set to a maximum of 10MPH. On-board automated fire suppression system to tackle both engine fires and fires around the bodywork of the mobile plant A separate cost for a 12-volt electrical supply to be fitted to operator cabs should be supplied if the plant specified does not have this as standard, this shall allow for retro installation/fitting of LEL owned radio equipment by LEL or their agents. Anti-theft devices Additional guarding around hydraulic hoses to minimise risk of wear and tear when in contact with waste. All plants must work in all weather conditions, specifically dusty, hot, and humid atmospheres , please reference any specific items such as wide core radiators and/or reversing radiator fan cooling systems that are fitted to all mobile plants being specified by yourselves. All mobile plant must be suitable for working outside continuously. LEL reserve the right to install proximity sensors or any other H&S equipment on the machines supplied, prior notification will be provided. 5 (6) x material handling machines (Equivalent to LH 18 M Liebherr) Fitted with a suitable waste rehandling grab or their equivalent. Supplied on solid tyres. Rehandling grab to be supplied with 40mm thickness one piece wear edge sets. The engineering specification and source of manufacture is to be supplied to LEL. Waste rehandling grab to be configured to have the open/close and rotation circuits operated by foot pedals on the 3rd line circuit and not electrical switching on the joystick handles. The open/close to be on the right-hand pedal with a backward movement to close and forward to open configuration. The rotation on the left-hand pedal with a clockwise rotation in forward position and anticlockwise in the backward position. Grab to be permanently fitted to the dipper arm, quick hitch systems are not required. To be fitted with long arms. To be fitted with machine stabilisers To have a raising cab Estimated usage per annum is 1400hrs (+/- 10%). Lot 2 Maintenance includes: Servicing Electrical upgrades Contractor to manage servicing and planned maintenance, but LEL need to know 14 days in advance in order to plan the operation around down-time. Replacement machinery is to be provided if it is to be out of service for longer than 24hrs due to parts or engineer availability Replacement machinery is to be provided if it is required to be taken off site for repairs/maintenance for longer than 24hrs. Alternatively, haulage provided to move a piece of mobile plant from one site to another if in agreement with LEL and is operational suitable. Wear & tear to be included in contract Lot 3 Maintenance includes: Tyres Tail blades There must be service for reactive maintenance 7 days a week, incl. plant break-down and attendance within 90mins of fault notification. All repairs are to be completed during site operational hours (08:30-16:30 Monday-Sunday) Suppliers are welcome to bid for lots 1, 2 and/or 3. Please include the different prices for each lot in the pricing schedule below (section 3).",
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "34000000",
"description": "Transport equipment and auxiliary products to transportation"
},
{
"scheme": "CPV",
"id": "45252110",
"description": "Mobile plant construction work"
},
{
"scheme": "CPV",
"id": "45259000",
"description": "Repair and maintenance of plant"
}
],
"deliveryAddresses": [
{
"region": "UKI",
"country": "GB",
"countryName": "United Kingdom"
}
],
"relatedLot": "1"
}
],
"mainProcurementCategory": "goods",
"aboveThreshold": true,
"lots": [
{
"id": "1",
"suitability": {
"sme": true
},
"contractPeriod": {
"startDate": "2026-10-01T00:00:00+01:00",
"endDate": "2029-09-30T23:59:59+01:00",
"maxExtentDate": "2031-09-30T23:59:59+01:00"
},
"hasRenewal": true,
"status": "planning"
}
],
"communication": {
"futureNoticeDate": "2026-06-19T23:59:59+01:00"
},
"status": "planning"
},
"language": "en"
}