Turbine Hall Fire Detection and Suppression System
Description: The contractor shall provide a complete engineered fire detection and suppression system, including all labour, materials, plant, access equipment, design services, testing equipment, certification and documentation necessary to deliver a fully operational system. The protected scope comprises four individual turbine areas within the Turbine Hall. For tendering purposes, each turbine shall be assumed to have an approximate protected area of 15 m2, giving an indicative total protected turbine area of approximately 60 m2. Tenderers shall verify all dimensions, access constraints, hazard locations and coverage requirements during the site survey and shall base the final design on confirmed site measurements and risk assessment. * Site surveys and risk assessment of the Turbine Hall and protected turbine assets. * Design of the fire detection, alarm interface and suppression system. * (read more...)
Summary: The procurement process initiated by LONDONENERGY LTD pertains to the implementation of a "Turbine Hall Fire Detection and Suppression System" in London, United Kingdom. This tender falls under the fire suppression systems industry category with a focus on goods. The procurement is currently in the tender stage, having commenced on 10th August 2026, with a deadline for tender submissions set for 10th September 2026. The successful contract is intended to start on 10th October 2026 and end by 30th December 2027, with the possibility of renewal for ongoing maintenance and spares. The open procurement method has been employed, aiming for wide competition and the process is guided by UK legislation, ensuring compliance with applicable fire safety standards.