SU172(26) Energy Centre and Union House District Heat Network Connection Works
Description: Swansea University is seeking to appoint a suitably qualified contractor to deliver works associated with the Energy Centre upgrade and new District Heat Network (DHN) connection to Union House, forming part of Swansea University's wider decarbonisation programme at Singleton Campus. The project comprises a significant upgrade to campus heat generation and distribution infrastructure, centred on the installation of approximately 3MW of modular air source heat pump (ASHP) capacity The project has been developed to RIBA Stage 3 with a fully coordinated design prepared to inform tendering and delivery. The works will be procured via a two-stage tender process, allowing for early contractor engagement during Stage 1 to support design development, buildability, programme optimisation and cost certainty ahead of entering a Stage 2 construction contract.
Summary: Swansea University is planning a procurement process for the "SU172(26) Energy Centre and Union House District Heat Network Connection Works," part of their decarbonisation programme at Singleton Campus. The project, valued at approximately £5 million, involves a significant upgrade to campus heat generation and distribution infrastructure through the installation of around 3MW of modular air source heat pump capacity. It falls under the construction industry category. The procurement stage is currently in the planning phase with a two-stage tender process featuring an open, competitive procedure that includes early contractor engagement. Critical dates include the end of the tender period on 14th September 2026, with contract commencement slated for 18th October 2026, and completion expected by 31st October 2028.