Design and Build Works for Mains Sewer Connection at High Lodge
Description: The works comprise the detailed design, construction, testing and commissioning of a new foul sewer system to replace the existing on site sewage treatment arrangements at High Lodge. The works include the provision of an approximately 2,037 m foul sewer system, comprising: * Rising/pumping main * gravity sewer main * pumping station * holding tank * a connection to the existing Anglian Water foul sewer network. The works are provided along the pre determined route identified by Forestry England.
Summary: The Forestry Commission is currently in the tender stage for a project titled "Design and Build Works for Mains Sewer Connection at High Lodge." This project involves constructing a new foul sewer system to connect to the existing Anglian Water network. Located in the UKH region, the procurement process is open and categorised under works and services, with an estimated contract value of £985,000. The procurement method is open competition, below threshold, with a deadline for tender submissions set for 15 June 2026. The project is scheduled to start on 3 August 2026 and complete by 26 February 2027.